Loading...
2013, 06-17 Permit App: APR-2013-0033 ApproachTr/ of _ '"' Community Development Department Permit Center ➢ r 11703 East Sprague Avenue, Suite B-3 Spokane Wiley, WA 99206 Fa(509) 688-0036 Fax: (509) 688-0037 permitcenterPspokaneva Iley.orq (Staff Use �yki rOnly) PERMIT NUMBER. le{trQ PERMIT FEE: �2-lam 33 APPROACH PERMIT APPLICATION PROJECT ADDRESS:/��i 6 Eos % A/4-24 4-'0)5 3 4qc START DATE: 6 � ANTICIPATED COMPLETION DATE: S. BUILDING OWNER NAME: 73ON� L ),(474 MAILING ADDRESS: /)9 /. /)7ptfcv /20 CITY:P/477JTnSTATE: /'✓tl ZI P: fie CONTACT PERSON NAME: 0/L7Q OCt I4"y /OZ( ?STY -M3/J/(4-f2 12q/- /66✓'7�[/� CONTRACTOR NAME:: W/L(M/2? (a/�j C CIACeE%�/� MAILING ADDRESS: /7f 9 G (/�('/•l fi t' 2U= ,2 CITY: 1/094/ CCch-04 (/STATE: 1J4Cj /✓/'//ZIPP: 7//34. �j PHON65 » /`sT?-7_NS- FAX:6501/,29% '6/2_` cat5bP% /•3 3f4 5,t�// �j CONTRACTOR LICENSE No.:WILL/tCS'25j/( EXPIRES:AL- OILY J CITY BUSINESS LICENSE NO.7?/f.�/J/QV ,QC3-- �-�} PROJECT DESCRIPTION (Please Provide Site Sketch) gResidential Driveway Zona/e-- )2P//X40ec 0 Commercial/Industrial Driveway ❑ Existing Curb & Gutter ,4719P/Z014C H ❑ Rural Road Section ❑ Culvert Installation ❑ Sidewalk Repair/Construction O Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if thls permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: G Sidewalk ft wide _ ft from back of curb C Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) z' a a, DISTANCE FROM NEAREST PROPERTY LINE MBE LEFT OR RIGHT SIDE) FT (BEE TABLE) CONCRETE APPROACH STREET NAME CURB RETURN I IIF CORNERtOT, I 5 PDISTANCET,ROM. ri\VEp CURRETURIN -CURB' 1 -41 -4 ----THROAT IHFT-1-4' AG(SEE TABLE) WING 909 6 W6,z4 STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH nFT(SEE TABLE) 3u 1 1 2013 CSV PFBMIT (LEI 1-1E7 15' RADIUS RADIUS RETURN EDGE OF ASPHALT tom—THROAT WIDTH (SEE TAB STREET NAM E STREET WITH ASPHALT EDGE \IF CORNER LOT, DISTANCE FROM RADIUS RETURN CFI (SEE TABLE) r Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 In City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Spokane ovaAley Development Engineering 11707 E Sprague Ave Suite 106 • Spokane Vatley WA 99206 509.921.1000 0 Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 9609 E Nora Ave Project No: APR -2013-0033 Reviewed By: Accepted Not Accepted Approach Building Location (�(' Paved Access Notes: 1. Approach to be constructed per City of Spokane Valley Street Standards, Standard Plan R-112. 2. Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. 3. Approach is to be inspected by the City's ROW Inspector prior to pavement placement. Reviewed By: ■■MEN ■■ ■■ ■■ .. ■.• ■ ■ MEM!=EM MEM M MOM MIN MR, MI • ■■ ■■ alleyford, WA 9� rill INNS lig) E. Immo Li MEM II ME 111 1 I 1111119412, A Mu INIMMEMEMMIMMEM 111111 11111111111 1111111111111 1111 II I'M' WEE 11111111MMEMEMEM M MEM MINIMMEMEMEMENIEU 11111111111111111111 A ■ =MOM MINIMMEMINIMMEMEMEMEM 1