2013, 03-28 Permit: SW-13000330 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000330
Permit Issued Date: 03/28/2013
Expiration Date: 03/28/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
SUMMERFIELD
J L HAWKINS EXCAVATING
509-924-9025
Applicant: J L HAWKINS EXCAVATING
Address:
Phone:
Email:
9722 E NORA AVE
SPOKANE, WA 99206-0000
509-924-9025
SITE INFORMATION:
Site Address:
Parcel Number:
14723 E OLYMPIC AVE
46354.2507
Assessor's Description: SUMMERFIELD EAST 1ST ADD LT 7 BLK 5
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
OLSON, DEBI L
14723 E OLYMPIC AVE
SPOKANE, WA 99216
Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Land Area: 10893.3 Square Feet
CONTRACTOR INFORMATION:
JLHAWE*222LE, Exp. 05/31/2014
J L HAWKINS EXCAVATING
9722 E NORA AVE
SPOKANE, WA 99206-0000
509-924-9025
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Possible FEMA Flood Zone
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 03/28/2013 12:53:37 Project Coordinator: Laurie Carver
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000330 Permit Issued Date: 03/28/2013
Expiration Date: 03/28/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/28/2013 12:53:37 Project Coordinator: Laurie Carver