Loading...
2012, 12-17 Permit App: BLD-2012-2278 Storage Bldgpo'C ne' Valley femvt Cenjiiik 11707 E Sue Ave, Suite 106 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 Community Development WWII,' spokanevalley.ore corn • ,Residential Construction Permit Application 411 PERMIT NUMBER: PERMIT FEE: Project # 6(d—i a- z7g o New Construction o Addition/Re-nodel o Other: AccVbfy'Bldg, Sftegki 2012 SITE ADDRESS coal t NOTA LSV PEHWIi I Ltig I tri ASSESSORS PARCEL NO: 9.6.3..o Lo LEGAL DESCRIPTION. Building owner Name. L;4 _ \-tLGfe i Address: 7-,,,21 t `,1l) jLq (N{AGL+ City: SrA—�'J6.a. [149Zip: / P,4 C Phone: - 912-94:/L1] 7 Fax: �W' _Contractor., ; _ • , '`._;; Name* ,(,}`)kpy Sled R1Lk1lois In Address: P. D • Box 1A2537 Name: c �t &u - !'7t.4N1Le/. A �,1 S Phone: gCy- 9153-6h S — ` bq- 443- 91 b2 _Contractor., ; _ • , '`._;; Name* ,(,}`)kpy Sled R1Lk1lois In Address: P. D • Box 1A2537 City:he Zip: 972.1 fl 8 Phone: y(03 —SI 82.Fax:+W O —t01 q3 Lic No: Bu144S8 I9&VQp 6: 1 1 O 1 01 City Business Lic No: (oo2+S 13b S FINISHED BASEMENT SQ. FTG: Describe the_scope of work in detail: Pos+ - Oviaat Sitarc.- ons 5"-1'r - Cost of Project: **************The followinE MUST be : (write N/A if not a licable)**************** complete HEIGHT TO PEAK r 1 DIMENSIONS:3o)pe} PP # OF STORIES: / TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PRO RTY: # OF BEDROOMS: fIRfI AIMFD COTRUCTION TYPE: AS1 HEAT SOURCE: WE - SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property, owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature Method of 0 Cash . Bankcard #: Date -/'? ayrnent: (Faxed permit applications will only be accepted with major bankcard) ❑ Check 0 Mastercard ❑ VISA Expires: VIN#: Authorized Signature: REVISED 8/25/2005 0 Other 1S6e Valley • ea 11707 E Sprague Ave Suite 106 1 Spokane Valley WA 99206 509.921.1000 1 Fax: 509.921.1008 / cityhall@spokanevalley.org Residential Plan Submittal Minimums Completed=Building & Mechanical application with: Accurate address, Parcel . _.Number and/or, Legal Description, description of work,'owrler and contractor • information, signature, and date. 'i ; • - ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans • • , ", With details, roof plan, framing plans & details. '._:❑ Shovthe height of.any proposed buildings or accessorystructures. -t.❑- Floor plan for-dach floor; i. Dimension to scale (minimum 1/8") andlabei.each- c 3 Rbetri (incISdih q.foot8ge of house and garage.on plans) Show each" ... t ,1 I •T,t i ? j levo brig:hp1;10U rid square footage of any additions. Alkbrac®d-itall panel types: show locations and details of installation, including d - engineered design. O Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping._ •_ t , 4 ❑ Smoke detector locations o 22" X 30" attic access location 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Fumace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information • Spokane jValley� • Target Date sheet For City Use Only PLUS Project Pi (CC —7._x717 - 22 78 Project Address Ci721 E &Joc 11703 E Sprague Ave Suite B-3 1 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 1-2- IL The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Y Submit complete, accurate plans and documents. Extra time may he required for re -submittals as project application reviewers work on multiple applications and it may he several days before they can look at your new or revised information. Y Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can he changed, one individual whir the expertise for dealing with reviewer comments would be the best choice for the entire review process. Si. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substanti'e flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical. compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Pemut Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 ROMMUMMEN UMIIIIMMEMM ME ■■ ME ■■ MM ■■ ME ■■ ii ii ii ii ■■ :: MS ME ii i■ ■■■■■■■■■■■■■ ii■ Mill ■i■ ii■ MEi ■i ■■■■■i■■■■ ■■■■i■i iii■■■■■■ ■■■■■■■s ■■■■■■■■ ■■■i■■■■ ■■iii■■■ moommomm =mum= thIlL Mill UM 4bIr&MMi MEW■ ■i■■■ 3° ■■ w ° ' ■■■ ■■■■■ i■■■■ z , c o ■■ ■■■■■ ■ ■ ■■■ ■■■■■ ■■■■■ ■■■■■■■■■■ ■■■■■ ■n■■■■■s■■ ■■_ ■ Pro ec # i. - r� mem 1■■ ■■ MOM 11■■ , �� ■■■ 1 ■■■■■■ 11■■� ■■■ ■■■■■ 1■�N_�■ Ca:■■■■■ 11Saral UM= :::::: i