2012, 12-17 Permit App: BLD-2012-2278 Storage Bldgpo'C ne'
Valley
femvt Cenjiiik
11707 E Sue Ave, Suite 106
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
Community Development WWII,' spokanevalley.ore corn
•
,Residential Construction
Permit Application
411 PERMIT NUMBER:
PERMIT FEE:
Project # 6(d—i a- z7g
o New Construction
o Addition/Re-nodel
o Other:
AccVbfy'Bldg,
Sftegki 2012
SITE ADDRESS coal t NOTA
LSV PEHWIi
I Ltig I tri
ASSESSORS PARCEL NO: 9.6.3..o Lo
LEGAL DESCRIPTION.
Building owner
Name. L;4
_ \-tLGfe i
Address: 7-,,,21 t `,1l) jLq (N{AGL+
City: SrA—�'J6.a. [149Zip: / P,4 C
Phone: - 912-94:/L1] 7 Fax:
�W'
_Contractor., ; _ • , '`._;;
Name* ,(,}`)kpy Sled R1Lk1lois In
Address: P. D • Box 1A2537
Name:
c �t &u - !'7t.4N1Le/. A �,1
S
Phone: gCy- 9153-6h S — ` bq- 443-
91 b2
_Contractor., ; _ • , '`._;;
Name* ,(,}`)kpy Sled R1Lk1lois In
Address: P. D • Box 1A2537
City:he Zip: 972.1 fl 8
Phone: y(03 —SI 82.Fax:+W O —t01 q3
Lic No: Bu144S8 I9&VQp 6: 1 1 O 1
01
City Business Lic No: (oo2+S 13b S
FINISHED BASEMENT
SQ. FTG:
Describe the_scope of work in detail:
Pos+ - Oviaat Sitarc.- ons 5"-1'r -
Cost of Project:
**************The followinE MUST be : (write N/A if not a licable)****************
complete
HEIGHT TO PEAK r
1
DIMENSIONS:3o)pe}
PP
# OF STORIES: /
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PRO RTY:
# OF BEDROOMS:
fIRfI AIMFD
COTRUCTION TYPE:
AS1
HEAT SOURCE:
WE - SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property, owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
Signature
Method of
0 Cash
. Bankcard #:
Date -/'?
ayrnent: (Faxed permit applications will only be accepted with major bankcard)
❑ Check 0 Mastercard ❑ VISA
Expires: VIN#:
Authorized Signature:
REVISED 8/25/2005
0 Other
1S6e
Valley
•
ea
11707 E Sprague Ave Suite 106 1 Spokane Valley WA 99206
509.921.1000 1 Fax: 509.921.1008 / cityhall@spokanevalley.org
Residential Plan Submittal Minimums
Completed=Building & Mechanical application with: Accurate address, Parcel
. _.Number and/or, Legal Description, description of work,'owrler and contractor
• information, signature, and date. 'i ; •
-
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans •
• , ", With details, roof plan, framing plans & details.
'._:❑ Shovthe height of.any proposed buildings or accessorystructures.
-t.❑- Floor plan for-dach floor; i. Dimension to scale (minimum 1/8") andlabei.each-
c 3 Rbetri (incISdih q.foot8ge of house and garage.on plans) Show each" ...
t ,1 I •T,t i ? j levo brig:hp1;10U rid square footage of any additions.
Alkbrac®d-itall panel types: show locations and details of installation, including
d -
engineered design.
O Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping._
•_ t , 4
❑ Smoke detector locations
o 22" X 30" attic access location
18" X 24" crawl space access:
❑ One-hour separation detail: between house and garage
❑ Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
❑ Fumace and hot water heater location.
❑ All header locations: type, size, and connections
❑ Foundation plan
❑ Insulation information
•
Spokane
jValley�
•
Target Date sheet
For City Use Only
PLUS Project Pi (CC —7._x717 - 22 78
Project Address
Ci721 E &Joc
11703 E Sprague Ave Suite B-3 1 Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
1-2- IL
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Y Submit complete, accurate plans and documents.
Extra time may he required for re -submittals as project application reviewers work on multiple applications and it may he
several days before they can look at your new or revised information.
Y Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can he changed, one individual whir the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
Si. Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should he contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substanti'e flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical. compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Pemut Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
ROMMUMMEN
UMIIIIMMEMM
ME
■■
ME
■■
MM
■■
ME
■■
ii
ii
ii
ii
■■
::
MS
ME
ii
i■ ■■■■■■■■■■■■■
ii■
Mill
■i■
ii■
MEi
■i
■■■■■i■■■■
■■■■i■i iii■■■■■■
■■■■■■■s ■■■■■■■■
■■■i■■■■
■■iii■■■
moommomm
=mum=
thIlL
Mill UM 4bIr&MMi MEW■
■i■■■ 3° ■■ w ° ' ■■■
■■■■■ i■■■■ z , c o ■■
■■■■■ ■ ■ ■■■
■■■■■ ■■■■■
■■■■■■■■■■ ■■■■■
■n■■■■■s■■ ■■_ ■
Pro ec # i. - r� mem
1■■ ■■ MOM
11■■ , �� ■■■ 1 ■■■■■■
11■■� ■■■ ■■■■■
1■�N_�■ Ca:■■■■■
11Saral UM=
::::::
i