Loading...
2014, 06-25 Permit App: APR-2014-0048 ApproachSO'lane Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permitcenter(anspokanevallev.org APPROACH PERMIT APPLI PROJECT ADDRESS:\lR ` Q �l , t i'1 ; �/ �3� L� START DATE: � N( ,ASN ICIPATED COMPLETION DATE: BUILDING OWNER NAME: N\ �\ \LA k\ �,+t°. ��^t' C�` y- MAILING ADDRESS: \ "tS CIT\O't4. c\1.� CONTACT PERSON NAME: W\_. L. PHONE: STATE: ILA / 1Y� '3O"► `.-E -`� ZIP: 9\9.A,_,, CELL:31 G. f \ 1 c--4 c t(1 ewN\ -RX Cairn L` .-CcAc.:. c\--\-AfN apt x 30- DO MAILING ADDRESS: Vb.-5 0 CITY: �� it 1-44 STATE:, ��-) PHONE: v TQ \�_ CONTRACTOR LICENSE #: 0 ZIP: ()-k°1 a 'AX: c 3\ \ . QwWbL: CITY BUSINESS LICENSE #: 71 Residential Driveway • Existing Curb & Gutter • Culvert Installation O Other Conditions: PROJECT DESCRIPTION (Please Provide Site Sketch) O Commercial/Industrial Driveway Q Rural Road Section Q''' Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signat a �J DE -001: V-1 Date: Page 1 of 2 )1 Applicant Name: Project # RECEi-VED JUN: "2:5 2014 CSV PERMIT CENTER SUB #) / REV. #� =fly dtt 9 yu.lp P (?l`[v1ow. Phone : 51i/ Z Site Address/parcel number: 14' os f?1i t pk. I q& 35! " 3513 r\ 5' 10' 2% _ • PROJECTED TOP OF CURB ELEVATION 15' MIN. GENERAL NOTES 1. EXPANSION JOINT MATERIAL SHALL BE PLACED IN THE CENTER OF ALL DRIVEWAYS OVER 20' IN WIDTH. 2. EXPANSION JOINT REQUIRED IF POUR INCLUDES ADDITIONAL DRIVEWAY AREA. 3. PORTLAND CEMENT CONCRETE SHALL BE CLASS 3000, AIR ENTRAINED. 4, ALL EXTERNAL EDGES TO BE TROWELLED WITH 1/4" RADIUS EDGER. 5. SIDEWALK TO BE SCORED EVERY 5'. 3/8" EXPANSION JOINT TO BE INSTALLED AT LOCATIONS WHERE SIDEWALK INTERSECTS OTHER SIDEWALKS AND DRIVEWAYS. 6. THIS APPIJCATION IS FOR RESIDENTIAL USE ONLY. 7, MIN. 4" THICK COMPACTED CRUSHED SURFACING TOP COURSE LAYER UNDER DRIVE APPROACH. 8. APRON SHALL EXTEND TO SWALE BOTTOM AND BE SECURED TO DRIVE APPROACH WITH TWO 12" #4 REBAR. EMBEDDED 6". THROAT WIDTH DISTANCES TYPE MN. MAX. COMM. 30' 40' RES. 16' 30' 15' MIN. 4' j MIN, APRON DETAIL 6" PORTLAND CEMENT CONCRETE SECTION A—A 1.5/8" BELOW GUTTER FLOWLINE EXPIRES 9/a9 /2 o! 0 DEVELOPMENT SERVICES SENIOR ENGINEER APPROVED FOR PUBLICATION < 2 /o S�1'ofs"iNe... ane 4,lValley. DRIVEWAY APPROACH SWALE INLET STANDARD PLAN NO. R-111