Loading...
2012, 04-02 Permit: SW-12001032 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12-001032 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: *ACME EXCAVATING & SEWER BORING CO. Applicant: *ACME EXCAVATING & SEWER BORING CO. Permit Type: SEWER Address: 6808 S. LINKE RD. GREENACRES, WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION: Site Address: 14923 E OLYMPIC AVE Owner: BAKER, DALE M & ROBERTA L Parcel Number: 46354.3503 Address: 14923 E OLYMPIC AVE SPOKANE, WA 99216 Subdivision: SUMMERFIELD EAST Phone: THIRD ADDITION Assessor's Description: SUMMERFIELD EAST 3RD ADD LT 3 BLK 15 Email: Inspection Area: Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Zoning: Land Area: 0.23 acres / 10017 sqft CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT & SEWER BORING CO 6808 S LINKE RD GREENACRES, WA 99016 509-228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Possible Floodzone On Site CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/02/2012 08:40:44 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12-001032 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/02/2012 08:40:44 Printed by: 113 APPPOOL\ASP.NET v4.0