Loading...
2006, 04-12 Permit App: 06001271 PoolProject Number: 06001271 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/12/2006 Page 1 of 2 Project Informations Permit Use: 16 x 32 POOL Contact: WAYNE WELLER Address: 14705 E BOONE C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: - Phone: (509) 921-2251 Group Name: Site Information: Project Name: Plat Key: Name: MISSION ADD District: Nort Parcel Number: 45084.0329 Block: SiteAddress: 9922 E NORA AVE Location:: CSV Lot: Owner: Name: WELLER, WAYNE B Address: 9922 E NORA AVE SPOKANE VALLEY, WA 99206 Zoning: UNKN Unknown Water District: Hold: ❑ Area: 12,143 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 4/12/2006 By: TMELBOU Landuse/Zoning/HE Conditions •Released By: ' Sewer Review Permits• Originally Released: 4/11/2006 By: KKENDAL Released By: - 9/3/04 Originally Released: 4/12/2006 By: amblake Operator: AMB Printed By: AMB Print Date: 4/12/2006 Project Number: 06001271 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/12/2006 Page 2 of 2 Swimming Pool Contractor: IMPERIAL POOLS Firm: MONARCH POOL & SPA SUPPLY Address: 3605 E CROWN ST Phone: (509) 489-5674 SPOKANE, WA 99207 Item Description SWIM POOL> 5000 GAL WSBCC SURCHARGE Units Unit Desc Fee Amount 1 SELECT $50.00 1 SELECT $4.50 Permit Total Fees: $54.50 Notes. Condition released (landscaping complete) on 2-3-06 by KEK. ONLY 7 LOTS MAY RECEIVE BLDG PERMITS PRIOR TO COMPLETION OF LANDSCAPING IN UNIVERSITY VIEW ESTATES AS PER PROMISORY LETTER DATED 12-12-05 FROM WCE. KEK Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Swimming Pool $54.50 $54.50 $0.00 $54.50 $54.50 $54.50 $0.00 $54.50 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: AMB Printed By: AMB Print Date: 4/12/2006 Project Number: 06001271 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/10/2006 Page 1 of 2 Project Information: Permit Use: 16 x 32 POOL Contact: WAYNE WELLER Address: 14705 E BOONE C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 921-2251 Group Name: S cj Project Name: Site Information: ��;; �l �1Lh Plat Key: Name: MI ADD 3;4(p LACI- eyei Parcel Number: 45084.0329 Block: Lot: SiteAddress: 9922 E NORA AVE Location:: CSV Zoning: UNKN Unknown Water District: District: Nort Owner: Name: WELLER, WAYNE B Address: 9922 E NORA AVE SPOKANE VALLEY, WA 99206 Hold: ❑ Area: 12,143 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Landuse/Zoning/HE Conditions Released By: -i .K Sewer Review Released By: - - - Permits: Swimming Pool Contractor: IMPERIAL POOLS Firm: MONARCH POOL & SPA SUPPLY Address: 3605 E CROWN ST Phone: (509) 489-5674 SPOKANE, WA 99207 Operator: AMB Printed By: AMB Print Date: 4/10/2006 Project Number: 06001271 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/10/2006 Page 2 of 2 Notes: ®_ . Condition released (landscaping complete) on 2-3-06 by KEK. ONLY 7 LOTS MAY RECEIVE BLDG PERMITS PRIOR TO COMPLETION OF LANDSCAPING IN UNIVERSITY VIEW ESTATES AS PER PROMISORY LETTER DATED 12-12-05 FROM WCE. KEK Payment Summary Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: AMB Printed By: AMB Print Date: 4/10/2006 spot -cane 11707 E Sprague Ave, Suite 106 �V Spokane Valley, WA 99206 eJ (509)688-0036 FAX: (509)688-0037 Community Development www.soolkanevaftev.ort,.co-T 0 APR p 7 2008 Residential Construction Neiv Crfltr*fo Permit Application o AdditionfRemoc/ o Other: PERNIITNLTBER 4 7 leek Bldg eck SITE ADDRESS a 2Y 2 Al olt'A- 5;#744,¢4.„Q/ l/llete ASSESSORS PARCEL NO: LEGAL DESCRIPTION: l tiilding owner Name: AJ$Yedr (, ctce e Address: F. 99,22_ /ikPa City Seidr4 w zip: 9926 6 Phone: 47;26 ' f/3 6 Fax: 95_Lo,E Contractor. Name: //neeYz,/& /aocV Address: /V7Z f= _gdc,�JL_ City. S,Dr/JAS Zip: 99ocd.6 "Cpntact Person`,. Name: f'n,.-' Q Phone: done: cid /02,91, S% Fax: Lic No: ,Z s,�PE G ,s om, Exp. Date: C Wi d - 6 6 City Business Lic No: Describe the scope of work in detail:OO Cost of Project: 277t157�e2'L /6 x 3� Sec// .�, We L, — _TM ,e901/wt. /.&kc It co Ce9 /7/00i,( e4° L cEzre<c /5‘26tc-90 dr 2Fc/T, **************The following MUST be complete: (write N/A if not applicable)********************** # OF STORIES: $ a/So a "^ Del 6S icru7- HEIGHT TO PEAK: MAIN FLOOR TO SQ. FTG: FINISHED BASEMENT SQ. FTG: # OF BEDROOMS: DISCLAIMER The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application - : _ proc- sed. DIMENSIONS: 2"u FLOOR S GARA CONSTR4YCTIOM TYPE: UNFIN BASEMENT SQ. FTG: DECK/COV. PATIO 5Q. FTG: HEAT SOURCE: TOTAL HABITABLE SPACE: IMPERVIOUS SURFACE AREA: 3D%D SLOPES ON PROPERTY: SEWER OR SEPTIC? Signature Date Method of Payment: (Fax dpermit applications will only be accepted with major bankcard) ❑ CashCheck ❑ Mastercard 0 VISA Bankcard #: ' ' Expires: VIN#: Authorized Signature: Atli REVISED B252DD5 A. -7—D6 ❑ Other agile cootz0galley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.100D ♦ Fac 509.921.1008 ♦ cityhal[@spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Pian, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ . Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor. Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and. in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" aftic access location [] 18' X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Fumace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information 128'-i 148'-11 7/8' i orECfEQME �� APR 11 20o6/ MOdMING HOUSE POOL 3 16'x38'POLL HOME PLANNI E. 9922 NORA E VLY WA Y DE DATE: •4'1 ROVE d -LC 2no 1/4' oo\ 20'-0 3/4" 3'-4" 3' { 16' 13' NOTE: THIS IS A NON DIVING POOL —NOTE— U1RDWAL SYSTEMS IS NOT .E FOR TIE f,(TIIifIR OIG SPEaFrAllows ILIJLISTRATED ON THIS DRAWING. THEY 91OIAD BE VERWIED Err THE LRIER ammuf/EllA ER TO 8E SUE THEY MEET N.SP.I AND A.I45J STANDARDS. VAft#16 - QO MIT DIVE N IMF SLIM 1 Al UND If prom SCAMS OR SLIDES ARE TO OE USED \[TH TIES£ POOLS PLEASE CONSULT PSE IMMtFAC'IIJRE'S alSXR4JCT1ONS AND THE NATIONAL SPA AND POOL W I0UIES wary STAOOARDS MDR TO 1.4STALLINC OMNG BOARD6 OR SLY)fS ON 11-1E33- POOLS. icer iNfaiNNUXIN CAICiR'. ILSF1 10l VM STUDS„ 11311E. NATIONAL SPA AMO POOL *KSIT LITE. 2111 EENNOMER 'KNEE, E, AtEXAIORU. VA 22314 (TAT) a38-008.3 AREA = 544.5 SQ. FT_ PERIMETER = 104'-1 1/2" CARDINAL SYSTEMS =I. I - 61 S (56) 36--033 3o9m10Lc moot A. O719 303-1316 rm. 017 4/54,D6 '3/16 =1 16' x 32' RECTANGLE °Ram SED IFLE "'"` SWIMT571 ALUMINUM COPING 14 GA. GALVANIZED STEEL WALL PANEL 2'-6" 4' THK. CONCRETE DECK, SLOPE 1/4" PER FT, AWAY FROM POOL. 3/8'4 A307 MB. --� (1) BOLT IN ALL HOLES OF INSIDE ROW(NEXT TO POOL) AS A MINIMUN USE 2nd SET OF HOLES TO ATTACH PLASTIC COMPONENTS (STEPS, SWIM OUT, ETC.) 2" BOTTOM MATERIAL 3'-6" 2"x 8"x 16" PATIO BLOCK AT EACH PANEL JOINT AND CORNER FOR LEVELING, AT CONTRACTORS OPTION SHORT ANGLE 1 1/2" x 1 1/2" x 24` 14 GA. GALVANIZED ANGLE CS606SA UNDISTURBED EARTH SHORT DECK BRACE ANGLE 2" x 2" x 31 1/2" 14 GA. GALVANIZED ANGLE CS700DS LONG DECK BRACE ANGLE 1 1/2" x 1 1/2" x 55 1/8' 14 GA. GALVANIZED ANGLE CS700DL CARDINAL CRIMP TURNBUCKLE ANGLE 3/4" x 1 1/4' x 3/4" x 25 1/4" 11 GA- GALVANIZED CHANNEL DRIVE STAKE 1 1/2" x 1 1/2" x 18" 14 GA. GALVANIZED ANGLE CS608DS 6" CONTINUOUS CONCRETE COLLAR BEARING PLATE 7 1/2' x 4 1/2" x 12" 14 GA. GALV. ANGLE CS607BP NOTE; BACKFILL TO BE SAND, GRAVEL OR OTHER NON EXPANSIVE MATERIAL STRUCTURAL P.E. REVIEW SEAL VOID WITHOUT SIGNATURE AND RAISED SEAL fNOT FOR -USE IN IN MASTER !BULK PERMIT APPLICATIONS) ii/741° ISSUE#: 26-3908 DATE: 04/06106 EXPIRATION DATE: 06119107 SEAL IS APPLICABLE FOR INSTALLATION ADDRESS ONLY: Wayne Weller East 9922 Nora Spokane Valley, WA 99206 STRUCTURALLY COMPLIANT WITH THE BOCA (1999); SBCCI (1999), NSPI-5 (1995) UBC (1997), AND NATIONALLY ACCEPTED IBC/IRC 120001 2003) CODES 42 5 FLANGE .° TLE ANCHOR SOCKET \ TOWWARDS THE PANEL FACE TO THE FRONT OF THE SLOT WHEN MOU Y 411111111\151. STRUCTURAL P.E. REVIEW SEAL VOID WITHOUT SIGNATURE AND RAISED SEAL (NOT FOR USE IN MASTER /BULK PERMIT APPLICATIONS) IJs ISSUER. 26-3908 1 DATE: 04/06106 EXPIRATION GATE: 06119107 SEAL IS APPLICABLE FOR INSTALLATION ADDRESS ONLY: Wayne Weller East 9922 Nora Spokane Valley, WA 99206 STRUCTURALLY COMPLIANT WITH THE BOCA (1999); SBCCI (1999), NSPI-5(1995) UBC (19971, AND NATIONALLY ACCEPTED IBCIIRC (200012003) CODES ( CARDINAL 260 5. RT. 81 SCFXM/CLL RA 9 . PA. SYSTEMS (717) 385-4733 (717) 385-1318 FAX. DATE 6-20-92 51 F. �2 =� TfiLE: LADDER JIG BOLT PATTERNS EXUMN: K.K. FILE H LE CS300LG WALL PANEL AND BRACE CALCULATIONS FOR 5" WIDE FLANGE, 42" HIGH STEEL WALL PANEL (Pages 1-13) Prepared for: CARDINAL POOL SYSTEMS, INC. 269 South Rt. 61 Schuylkill Haven, PA 17972 Prepared By: SCHAFER ENGINEERING ASSOCIATES 1885 State Street Schenectady, New York 12304 Phone: (518) 393-4767 Fax: (518) 393-3510 /jj 7 Void without gnature, raised seal anclor watermark. Not foriuse iR Master Peimit Appf tions. +,�i�, Epr...t 'S19.13 Issue No. � x iraCton date: For Installation AddresJOnry _Wayne'Weller, East 9922 Nora, Spokane Valley, WA Q: CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel Calculation Assumptions: a.) The panel ends provide minimal vertical stiffener reinforcement for the galvanized steel pool panels. Therefore, the critical case for calculating vertical stiffener strength occurs when a 4 foot panel is sandwiched between two 6 foot panels. b.) The concrete pour at the base of the wall (i.e., bond beam) provides 6 inches of vertical support to the panels, stiffeners and braces. c.) Refer to the last page for more Material/Installation Assumptions. Definition of Parameters: Assumed Soil Properties: (Sandy silt soil material) Wd (unit weight of dry soil) 105 Ib/ft3 IM, (unit weight of saturated soil) 135 Ib/ft3 4) (soils interior angle of friction) 30 degrees Ka (lateral active soil coefficient) = tan2 (45-0/2) 0.333 yd (equivalent active unit weight of dry soil) = Ke Wd 35 Ib/ft3 Y. (equivalent active unit weight of saturated soil) = KaWw 45 Ib/ft3 7w (unit weight of water) 62.4 Ib/ft3 p. (friction factor between soil and concrete) 0.45 Material Properties and Dimensions: Panels/Stiffeners/Channels E (modulus of elasticity) 29,000 k/in2 FY (minimum yield stress of cold -formed steel) 42,000 Ib/int Fb (allowable bending stress of cold -formed steel) 25,150 Ib/int Fb,pwro (allowable bending stress of cold -formed plate steel) 31,500 Ib/int Ft (allowable tensile stress of cold -formed steel) 25,150 Ib/int tp (thickness of panel, stiffener, and channel steel) 0.0785 in h (height of panel) 3.5 ft hp, (depth of water) 3.0 ft he (effective height of panel) 3.0 ft b< (maximum unstiffened 4 foot panel width) 4.0 ft be (maximum unstiffened 6 foot panel width) 3.0 ft R (maximum radius of panel) 15 ft 1.5 (effective height/length of stiffener = he) 3.0 ft d (nominal depth of stiffener) 5.0 in L. (maximum brace spacing) 8.0 ft Se,. (section_modulus of stiffener) 0.5973 in3 b= (maximum unsupported length between stiffeners) 10.0 ft Sa,. (section modulus of channel) 0.6464 in3 \ Voidiwithout signitture, raid seal and color wnnark. Not for�use n l ster Permit Applicatt5 s. Issue No!35-3836 Expiration Dale: 06/19/07 For Instal�ti6n/A''ddresL,6nt�:lNayrie,�Weger� ast 9922 Nora, Spokane Valley, WA Schafer Engineering Associates 1of 13 A307 Steel Bolts Ft Fy $ db CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel (tensile stress of the bolt) (shear stress of the bolt) (bolt spacing) (bolt diameter) Concrete Bond Beam F'0 (compressive strength of concrete) t (thickness of base pour) w. (width of base pour) y. (unit weight of concrete) am (moment arm) Angled Braces/Rods Fy Fa ra Aa La L, dr r, k (minimum yield stress of steel) (allowable axial stress) (radius of gyration of angle) (area of angle) (maximum length of angle) (maximum length of rod) (rod diameter) (radius of gyration of rod) (effective length factor) Analyses: 1. General Panel Configuration E0 Ea E0 E0 1. E.0 20,000 Ib/in2 10,000 Ib/in2 6 in 0.3750 in 2,500 Ib/in2 6 in 2.5 ft 145 Ib/ft3 See Calculations 36,000 Ib/in2 9th Ed. ASD pp. 3-16 From Spreadsheet From Spreadsheet 44 in 19 in 0.625 in 0.1563 in 1.0 W-07 PANEL 6'-0" PANEL W-0" PANEL la Co INFIC. ~ 50 35 WALL PANEL Voidiwithout signature, rai `ed seal and color watermaik. Not foriuse in Master Permit Applipatiops. Issue No125!3636 Expiration Date' 06/1x/07 m�rvlrir n / :�Wayr n For InstellatlopAddress OnIyne VVege7r��Et 9922 Nora, Spokane Valley, WA Schafer Engineering Associates 2 of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel 2. Loading Conditions: (Calculated per unit foot of wall.) A. Dry Backfill. Pool Full Total lateral dry soil load [Pd] _ Total lateral water load [Pw] = yd x h2 _ 2 2 35 x 3.5 = 214.38 lb/ft 2 ywxh.2 62.4 x 3.0 2 2 2 = 280.80 Ib/ft Total lateral load per unit length [P] = Pw - Pd = 280.80 — 214.38 = 66.43 Ib/ft p 66.43 Approximate distributed panel load [Pn.t] — h = = 18.98 Ib/ft2 3.5 B. Saturated Backfill, Pool Full L PSAILP 2 Total lateral saturated soil load [Ps] = y=xh2 _ 45 x 3.5 - 275.63 Ib/ft 2 2 Total lateral load per unit length [P] P. - ps = 280.80 — 275.6 = 5.18 Ib/ft p 5.18 Approxirrlate`distributed panel load [Pet] - - C.Void without signatuurre;rraisepal and r watermark. Not foci use in Pilaster sand Applications. Issue N& 25-3636 Egplratiion Datte 06/19/07 " For Installation Address Only[ Wayne Vfei East 9922 Nora, Spokane Valley, WA 3.5 = 1.48 Ib/ft2 Schafer Engineering Associates 3 of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel C. Dry Backfill, Pool Empty (See Material/Installation Assumptions) Total lateral dry soil load [Pd] =21438 Ib/ft Pd 214.38 Approximate distributed panel load [Pner] = _ = 61.25 Ib/ft2 h 3.5 3. Flat Plate Analysis: (4'-0" panel length governs as maximum spacing between vertical stiffeners occurs with this panel. See Calculation Assumption b.) Largest unsupported panel area: 3.0 ft x 4.0 ft Modify lateral soil load to determine actual load acting on panel parts by taking concrete bond beam into account. (Load Condition 2c governs and assumes overturning/sliding analysis requirements are met.) ydxh�2 35 x 3.02 P' =2 = 2 - 157.50 Ib/ft P' 157.50 Approximate distributed panel load [Pine] = - = 52.50 Ib/ft2 hea 3.0 P' Actual bending stress [fb] = h2+ ba z 2t, (hee t ) [fb] = 24,536.49 Ib/in2 2 2 52.50 x 3.0 x 4.0 2 x 0.0785x( 3.02+ 4.02) Fb 31,500 F.O.S. = fb 24,536.49 1.28 > 1.0 OK ,. _ Void without signature, raised seal and color wate Notfor� use in Maste ermit1Applicationsfl Issue No725-3636tulau / iration �D�ate:� 106/19/07n For Instdigor`/ad. esssOnly` °Pab keit , East..9922 Nora, Spokane Valley, WA `". r�. t Schafer Engineering Associates 4 of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel 4. Radial Panel Analysis: (Tensile hoop stress. Load Condition 2c governs and modified lateral distributed panel load [P'eet ] from Section 3 applies.) Feet R Actual Tensile Stress [ft] - tp 52.50 x 15 x (1/12) ft = = 835.99 Ib/int 0.0785 FL 25,150.00 F.O.S. = ft 835.99 30.08 > 1.0 OK 5. Bending along Vertical Axis at Vertical Stiffener:(See Calculation Assumption a.) 6' WIDE PANEL 6' 0" Ilir 1_ 3-0" 3'-0" VERTICLE 'Z' ORIENTATION P' BRACE BRACE POINT 6-0" POINT FLANGE tp-0 072 WEB FLANGE =1.125 Modified lateral soil (P') from Section 3 applies: (Load Condition 2c governs.) Maximum bending moment [Ms] = 9 t 3 (26 + be ) 2 x 157.50 x 3.0 10.0 3.0 Me =9 ( 2 2 ) = 394.04 ft -Ib Actual bending stress [fb] = M. 394.04 x 12 50.5 = 7,916.46 Ib/int 0.5973 Fe 25,150 F.O.S. ,= . — = a18 > 1.0 OK 1 fo 7,916.46 c Void without sigh/lute, raised seal and kolor watermark. Notifor�usein Mester PejrnirlApplications. Issue No 2 ExpirationiDate:' 06/19/07 - m•uJfi n r r r r� ForIn allot \A firessOn:r7- 2:ayi�We1e, East 9922 Nora, Spokane Wiley, WA Schafer Engineering Associates 5 of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel Bending in the Top Channel: (8'-0" panel length governs as maximum spacing between braces occurs with this panel.) BRACE POINT P'/3 PLAN FLANGE =1.25 BRACE POINT d= 5 0 0 CHANNEL X—SECTION WEB FLANGE=1.25 Modified lateral soil (P') from Section 3 applies: (Load Condition 2c governs.) p' 157.50 Load along the channel [Pt,] = _ — 52.50 Ib/ft2 3 3 52.50 x 8.0 2 Maximum bending moment [M.] = M. 420.00 x 12 fb - S°= - 0.646 Rap L`2 - - 420.00 ft -Ib 8 8 = 7,797.03 Ib/int Fb 25,150 F.O.S. = - = 3.23 > 1.0 OK fb 7,797.03 `, ry r Yr F • Void without signature, rail d seal and -color watermark. Not forluse in rooster PerfnitIApplicahora / uum t r Issue Nor2 3636 E piration D_ : i0.&t 9/07 For InsFallal'ron Addres's•Onty: yne•.1NN�errEast 9922 Nora, Spokane Valley, WA Schafer Engineering Associates 6 of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel • 7. Overtuming Analysis: (Moments taken about point A with concrete bond beam in place. Calculated per unit foot of wall. Load Condition 2c governs.) W_1 1' = (Wc/2)+d E Mresrst = MWck + Moon = Pb ami + Pc amt = Wd heewc ant + y tcwc amt = 105 x 3.0 x 2.5 x 1.67 + 145 x 0.5 x 2.5 x 1.67 = 1,614.58 ft -Ib E MOT = Med = Pd amt ydxh2 2 2 35 x 3.5 - x am2 3.5 2 3 = 250.10 ft -Ib E M - 1,614.58 F.O.S. _- - 6.46 > 1.5 0K EMor c',-.2,-... . 250.10 .. r.., w_ n , Vhqignatue''lied,seal and colo n fatermark. N Hfmuse)in Master Pe-. Applications Issue25-3636 ExpirationbateItb17 For Installaon Adre✓ss r1y.VJeyne WeifirlEast 9922 Nora, Spokane Valley, WA Schafer Engineering Associates 7 of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel 8. Sliding Analysis: (Concrete bond beam in place. Calculated per unit foot of wall. Load Condition 2c governs.) • E P.= = µ(Pb + Po) = µ(Wd hefiwc + yo tc wc) (Pb+ Pc )u = 0.45 x ( 105 x 3.0 x 2.5 + 145 x 0.5 x 2.5 ) = 435.94 E PsIId na = Pd — yd h2 2 35 x 3.5 2 2 = 214.38 Press, 435.94 F.O.S. = - = 2.03 > 1.5 OK E P:nmng 214.38 Void without signature,Araissi it seal and color watermark. Not forjus�e ineMaster Permit ARplicattlons. / i.. Issueup Nof 3638 Ekprirehon Da}}e: 1OSh 9/0 • Forinstellation Address OMy"WayneWppeller!East 9922 Nora, Spokane Valley, WA Schafer Engineering Associates 8of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel • 9. Brace (Angle Section) Analysis: (Assumes concrete bond beam in place and 81-0" panel length for maximum brace spacing.) ONG ANGLE 1 1/2" x 1 1/2" x 44 it GA_ GALVANIZED ANGLE LATERAL LOAD DIAGRAM ADJUSTABLE and STATIONARY AFRAME ASSEMBLY A.) Compression Analysis: (Load Condition 2a governs.) p 66.43 Max force at brace level [Pi] =3 L = 3 8.0 = 177.13 Ib p, P, 177.13 Axial Compression Force [P.] - _ - - 371.23 Ib cos A cos ( 61.5) 0.4772 pac 371.23 Actual axial stress [fa] = Aa 0.346 kLa 1.0x44 ra 0.2965 Fa F.O.S. = fa = 1,072.91' Ib/in2 - 148.4 Cc = 126.1 Fa = 6.781 6.781 1.0729 = 6.32>1.00K Void without signature, raised seal and color watermark. nn4m 1 it r . f 1 Not for use in. A'aster PenndfApplications./ Issue No2� 363�Expua)ion�Date. `06/,,,, A For Installation Addres`s'Only. Weyrle4Weller,. at 9922 Nora, Spokane Valley, WA G Schafer Engineering Associates 9 of 13 Schafer Engineering Associates 1885 State Street Schenectady, New York 12304 Phone: (518) 393-4767 Fax: (518) 3933510 Rev: 510300 User KW -0603799, Ver 5.1.3, 22-3un-1999, Wm32 (0) 1983-99 ENERCALC Title : Cardinal Pools Job # N/A Dsgnr: SEA Date: Description : Wide Flange, 42" High Wall Panel Scope: N/A Built -Up Section Properties Page 1 ects pools s03-998 cardinal .00ls 2003 Description Properties of Angle Calculation LGeneral Information Type... #1 Rectangular #2 Rectangular Summary Height Height 0.120 in Width 1.380 in Width 1.500 in 0.120 in X cg -0.690 in 0.000 in Y cg -0.750 in 0.000 in Total Area X cg Dist. Y cg Dist. 0.346 Int Ixx 0.08 in4 lyy 0.08 in4 0 36 in Edge Distances from CG... 0.39 in +X 0.419 in -X -1.081 in +Y 1.081 in -Y -0.419 in xx yy S left S right S top S bottom 0.466 in 0.466 in 0.069 in3 0.179 in3 0.069 in3 0.179 in3 ^� A s'l ^- Datum Center c( Gravnry 1 Center of Gravity 1,3`$XI•SX 1,3(gX1.0 X0,12 9 (I.S+ 1.3�) 7. —0,°4463 1 Z- 0,°15-1 x (4f1 -F- °:(D1k x cos (Lie) —0,041;143 10 of 13 Liz = 0,0 30‘-( Z_ 2� I I a'G?PUS 5u° CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel B.) Tension Analysis: (Load Condition 2c governs and modified lateral load [P'] from Section 3 applies.) 157.50 Max force at brace [P,] = 3 L. = 3 8.0 = 420.00 Ib p, p 420.00 Axial Tension Force [Pott] = cos 0 cos (61.5) 0.4772 Pte, 880.21 Actual axial stress [fal - = 0.346 = 2,543.96 Ib/int F.O.S. - Fa 21.600 = 8.49 > 1.0 OK fa 2.5440 Void without signature,, railed seal and color yatermark. Muu ♦. Notfor� use �p Malter Permit Aopli tions. nur r r , Issue N 125.3636 Expiratio'nlD�te: 06/19/07 For In Ilatiorak ss Only WayneV1(�M rlast 9922 Nora, Spokane Valley, WA V G ! = 880.21 Ib Schafer Engineering Associates 11 of 13 CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel 10. Brace (Threaded Rod Section) Analysis: (Assumes concrete bond beam in place and 8'-0" panel length for maximum brace spacing.) A.) Compression Analysis: (Load Condition 2a governs.) paw 371.23 Actual axial stress [fal = _ = 1,210.01 Ib/int A 0.3068 kLr 1x19 - 121.6 Cc= 126.1 rr 0.15625 Fa = 10.05 Fa 10.05 F.O.S. - fa 1.2100 8.31 > 1.0 OK B.) Tension Analysis: (Load Condition 2c governs and modified lateral load [P'] from Section 3 applies.) TURNBUCKLE 5/8"0 — 19" A307 THREADED ROD TURNBUCKLE and THREADED ROD AFRAME ASSEMBLY Actual axial tensile stress [ft] = Pa,a 880.21 - 2,869.04 A, 0.3068 Ft 21.6 F.O.S. =ft - 2.8690 7.53 > 1.0 OK Ib/int 11. Steel Bolt Analysis: A.) Check Bolt Shear: (Load Condition 2c governs and modified lateral load [P'] from . Section 3 applies. Refer to section 9b of brace analysis.) P. 880.21 Actual bolt shear stress [ff] - _ = 7,969.55 lb/int Ab 0.1104 F.O.S. = f. Fa 10,000 7,969.55 = 1.25 > 1.0 0K B.) Check Bolt Tension Stress: (Load Condition 2c governs and modified lateral distributed panel load [Pine] from Section 3 applies. Refer to Section 4 of radial panel analysis.) Maximum tensile force [T] = P'nat R = 52.50 x 15 = 787.50 Ib/in of panel depth Actual bolt tensile stress [ft] = Ft 20,000 F.O.S. _. ft 3,565.07 = 5.61 > 1.0 OK T S 787.50 x 6 x (1/12) Ab 0.1104 Void without signature, 'fat seal and color wdtermark. Not for�use'n Master Permit Applications. / noel Issue N?� 363.6�Expiretiori D�le� O6l19lQ7 Foi Instella , Aifdre"sstni wayneNllefier, Eist 9922 Nora, Spokane Valley, WA 6 G = 3,565.07 Ib Schafer Engineering Associates 12 of 13 1. CARDINAL POOL SYSTEMS 5" Wide Flange, 42" High Steel Wall Panel Material/Installation Assumptions Wall panel, brace and panel/brace fastener sizes, thickness, dimensional characteristics, material properties and strengths used in these calculations were provided by Cardinal Pool Systems, Inc. These calculations assume that these elements have uniform thicknesses, sizes, and material properties/strengths and that they are free of defects. These calculations cover only those elements identified herein and do not cover liners, ladders, steps, slides, decks, railings, etc. This pool system is intended to be installed only by factory trained and approved distributors/contractors. 2. Soil pressures used in these calculations constitute those soils which are in their active state and have a maximum equivalent fluid pressure equal to 35 #/f13 under non -saturated conditions and 45 #/ft3 under saturated conditions. See definition of parameters section for more soil type assumptions used in these calculations. These calculations do not consider the existence of expansive or adobe -type soils, high groundwater table conditions, or adjacent uncompacted soil fill conditions. If existing site soil conditions dictate a different or potentially higher equivalent fluid pressure than those used herein, the pool Purchaser/Installer shall contact a local Geotechnical (Soils) Engineer for additional guidance and direction prior to pool installation. 3. Wall panel backfill materials shall consist of clean porous soils, free of roots and debris, installed and carefully tamped to eliminate voids, in layers not exceeding 12" thick. In addition, backfill materials shall not exceed the same equivalent fluid pressure characteristics identified in Item 2 above. Lastly, backfilling operations behind the pool panels must be performed in conjunction with the pool filling operations. Although these calculations show that backfill material can be placed behind the pool panels when the pool is empty, these pool panels should not be considered capable of independently withstanding either the pool water's lateral forces or the lateral soil forces (from behind the pool panels). 4. The pool is designed to remain full of water at all times. The pool may be damaged if the water level is allowed to drop below the pooTkill ( apt 1 rawdown is noticed or if it becomes necessary to drain the pool, contact Cardinal Po Syste lncto It ajent immediately for instructions. Temporary shoring of the pool panels is highly recommended 5. These structural calculations shall be considered void if not complete (pages 1 - 13) and do not contain a raised P.E. review seal, signature, and color watermark on each page. 6. Pool system is not designed for earthquake or surcharge loading (i.e., neighboring structures, vehicles, trees, equipment, etc.). 7. Finished decks and/or grades shall be constructed in accordance with the pool manufacturer's guidelines and be sloped away from the pool copings at a rate of not less than 1/4" per foot. n fl S. Concrete bon -rt 'eh+Alfl h1tba" 2'-6" minimum. 2V1:OITOBAAO3 r1OtT039801 0J'1-1 V I 9. These calculations are in compliance with the following state and national codes: 1. 2000 Nationally accepted International Building Code (IBC) 2. 1999 Building Officials & Code Administrators (BOCA) 3. 1999 Standard Building Code (SBCCI) 4. 1997 Uniform Building Code (UBC) 10. Refer to the Pool Manufacture's Installation Manual for additional restrictions, requirements, guidelines, and recommendations. rtl ith� Void without signature, ra�ij seal and color watermark. .,,fr, Not for use in��laster Permit Applicatlgns. iss'ue.Noj26-3636 Expiration Date: \06/19/07 F.or.InsW'Is�troridtdresidep{Mar,Welrltesei ast 9922 Nora' Spokane Valley, WA Schafer Engineering Associates 13 of 13 JC:1‘,t.ror -I re te '1. ,9•1;;,.03:5; _";Jr.. ?;i1.,i1.;ii:.fzit;17., ,3c1••77.71F titv-3 .1.:11:nzq yyt 7•7ft .;:r1;:k”tr•ica: 1...; • -t; y ;t, 174, ,7ft;L:'p13if:),r: 51!** :3;1:"1:-,ti!tri!6;3 2iitLi ;i ;P&. / ft? -1 6; 01,1; tx •kliV,"; t7.717.172:7; '2:42! ti: 7f7.7-0.?2:2. ?77'.1 . '7.; •..:r:iip2 ;:-!!•;;!i: tt 7I; •C't•r .217•717r 77•2.e.fil --774:0;•fly2.0) .7,170;e7":11•2•;.:: ::7•77•7!) tr.t177-7'17:211:-, "!0;;;Vi'; FP -7 rryjnixerrr. 93,y; 2T6.c1,742tif.:1• eaii0? o fr, ; Ci3tC2 Lt2i! t; tt.:ct!"!tr: ILK; !tt;.? !;it tr.ty .1-yn ")?•115, ;i10,1'ortdt>i ',(i;;;C:.;)&irfv:1 r ,.l.. !":! ".2/i bri;3 tc•tet ,E t:: JC -t; ''ITIfd.) ;I: t}2Sa,,P,1. • (iti 17y!'11,14: /10:1":11,2 glnAZeii :r,!ct-jci! ittLIR it! Irt.,R • ,Ifik?•::LIT”r4 (=yr; iJid./.07,t3.2:.% • act ny,..ititz!il 5,7-5,)i7t tem 5!•113.1:4,4::!ttGiGttf: -taA!22t-Attn!!:i 121! tr:-E,,h;„ L-fr,li.CIV1/41t7.1ttriz7F;(:::-; t;i1.11er:ri 7r;..•• • ,;; ?„ ;„)el •:7 7'.77 ICO !KE;IE •..:,? . ..naoi.s.n,y-.. • kw:4 fLyik-unotcni; 7777•• '27;2 .. Ai tte!:!:titr:3 il;r...7,7,17 IP; •2;:ff 7.:i72.7171:; :A, • ,ivri•;.171 ;lb tf;'% 7: :Jett f? 8 'J.. .ictrey, .77127•70,-.31 .0;t •-• '.7'4777::2•V7t.r7C.777'. •.1:72 ':••‘r ?..fi?. • becc;. .(THla.PPII;PINa.SUBJECTIQL; TO FIELD INSPECTION CORRECTIONS r7r!r7.:::&:•.:,“;11 (r ir4 city:0 S?;it.11,10 1:777.79 t..12t• :77, LAlt -40.ifEi(P ;2.1" Si3iacarie 40Val7ey REVIEWED FOR CODE nOMPLIANICE •• ' SPOKANE \,ALLEY Jo.", 4" • '