2010, 08-18 Permit App: 10002508 GarageProject Number: 10002508 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Date: 8/18/2010 Page 1 of 2
Permit Use: 1600 SQFT GARAGE Contact: BOND, DONALD L & RACHEL K
Address: 10121 E NORA AVE
C - S - Z: SPOKANE, WA 99206
Setbacks: Front Left: Right: Rear: Phone: (509) 290-0753
Group Name:
Site Information: Project Name:
Plat Key: 001643 Name: MISSION HILLS SUB District: Nort
Parcel Number: 45084.0305 Block:
SiteAddress: 10121 E NORA AVE
Location:: CSV
Lot:
Owner: Name: BOND, DONALD L & RACHEL K
Address: 10121 E NORA AVE
SPOKANE, WA 99206
Zoning: R-3 SF Res District
Water District: 011 MODERN Hold: ❑
Area: 10,145 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Driveway/Approach
Originally Released: 8/17/2010 By: tmelbourn
Released By:
NOT REQUIRED
Originally Released: 8/17/2010 By: TMELBOU
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 8/18/2010 By: tschmidt
Operator: JD Printed By: jmm
Print Date: 8/18/2010
Project Number: 10002508 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/18/2010
Contractor: OWNER
Description Grp Type Notes
GAR WOOD U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit
Page 2 of 2
Firm: OWNER
Phone: (000)
This Application:
Sq Ft Valuation
1,600 $30,400.00
Totals: 1,600 $30,400.00
Units Unit Desc
1
1
1
SELECT
SELECT
SELECT
Permit Total Fees:
000-0000
Total Project:
Sq Ft Valuation
1,600 $30,400.00
1,600 $30,400.00
Fee Amount
$451.85
$112.96
$4.50
$569.31
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $569.31 $569.31 $112.96 $456.35
$569.31 $569.31
$112.96 $456.35
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 8/18/2010
Spoka e�
, Valleyy
Community Development
Residential Construction
Permit Application
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:1O.s 25228
PERMIT FEE:
New Construction Accessory Bldg
Li Addition/Remodel n Deck
Other:
SITE ADDRESS:
iota‘ C NoRA SpaLI) t1kO&. 'Heat"
ASSESSORS PARCEL NO:
LEGAL DESCRIPTION:
Building Owner: 11ONALt 60 OD
Contractor: •
Name: .001009L0 6444
Name: /
Address: ( 0I D-1 E KORA-
Address: /
/ \State: Zip:
State g Zip: 19-014City:
City: ekti P77"
Phone: s
ci ago _0753 Fax:
Phone: ✓ Fax:
DECK/COV. PATIO SQ. FTG:
N/1
Contractor Lic No: Exp Date:
Person
TYPE:
i.
City Business Lic. No:
Contact
Name: /%/��
Phone: / '
Describe the scope of work in detail:
Cost of Project: $ s2'/ Si 000
qO A 10 Shop
Paroo"'s'e`d Ose. < ' S-i-orOFF ro&oQoekic lt.s ) I.0c90ci shop h01464.1'401
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: a0 /
DIMENSIONS: 7� x 40
7
# OF STORIES: /
TOTAL HABITABLE SPACE:
/6,00 SF
MAIN FLOOR TO SQ.
FTG: 2(200 D K
2"D FLOOR SQ. FTG:
NA
UNFIN BASEMENT SQ. FTG:
MAREA:
IMPERVIOUS SURFACE
/ & o o
FINISHED BASEMENT
SQ. FTG: N/9-
G GE SQ. FTG:
Ain
DECK/COV. PATIO SQ. FTG:
N/1
30% SLOPES ON
PROPERTY: /1/4/4
# OF BEDROOMS:NA-CONS�TRkTION
TYPE:
i.
HEAT SOURCE: A'
SEWER O S TIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE: Q
VISA
VIN#:
RFC:PINED
CS'J PERMIT CENTER
Atts (; 2019
!project ft
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing ❑ Window and door location and sizes
o Header, beam or concrete lintel sizes ❑ Window well locations if applicable
o Brace wall panel locations
❑ Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
o Room usage labels
o Smoke detector locations
❑ Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection ❑ Truss or rafter size, spacing & connection
o Sheathing size and type o Attic insulation/ air space baffle/ ventilation
Ceiling
o Joist size and spacing ❑ Size of ceiling gypsum wall board
Wall
o Height/ top plate/ stud size and spacing/ sole plate ❑ Siding/ exterior house wrap/ anchor bolts
o Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing 0 Sheathing or concrete floor size/ insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance 0 Horizontal & vertical reinforcement if any
Footing
o Size - 0 Reinforcement if any
Radon
o Passive system with 6mil vapor barrier ❑ Active system with 6 mil vapor barrier
Miscellaneous Construction Details
O Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
•-❑ Stairway tread rise & run and nosing
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
scn0F1r\
Valley®
•
For City Use Only
PLUS Project Number t( )C 2 Cf
Project Address -
If)1.7,I A1'n'v rk
11703 E Sprague Ave Suite B=3 ••Spokane Valley WA 99206-- •�'
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer .service, during° the` review process of your. project
application, we are providing you with a TARGET DATE for the iriitial•technical application'review: If for;.
any reason we cannot meet this date, we will contact with a ;ei iced target date. '
Ia:I:m
Your application review TARGET DATE is.
The TARGET DATE is the'date we estimate your. project application will have: had its'initial,technical
review. It is not the date for approval or permit issuance..
.Tips for a Smoother-Proieet Application Review'.
Submit complete, accurate plans and documents. -
E.clra time may be'required for re -submittals as project'appliccition revieirer.S itoih oil midtiple,applicotions and
mar be several deals hetol-e they egn'look at your new or revised 1/7/?),:I na/ion:.> • '
•
i Designate'a specific contact person to,communicate with the City. ' . , ,
While the person designated as the applicant's conlaci person With die'Citr'?'cht he changed, one'indii'idural with the
expertise fit. dealing with reviewer continents would be the best choice for thet entire review- process.
I r c
Call staff regarding the status of your project o l a tothe target date shown 'at the top of the -page...
Although you .should be contacted on or hr the target date, please, feel five lo, concoct us 4V0U haven't heard f 0/77 us
by roar target dute.•Staff nuts contact you before the target date if theinitial re%iew i.r complete. BhJollowing'tliis•
procedure. you will save time and alio. reviewers to complete the work.» •tore expeditiously '
Steps in the Permit Process
I. Counter Contplete...Your application ,has been accepted as counter complete..This mans all :-of the required
documents, as indicated on your Pre -Application Checklist have -been submitted• or have been hppuoved,•.for deferred
submittal. This does not prevent technical stul I Isom requesting additionafinfornla'tiori as•a result of their technical review"
2. Quality Check. "fhe next step in the process is a quality check. to nlakc.sure that the application iscreviewableand free
from substantive Haws that would prevent technical staff from, completing the -technical revicwonce,it is'started.,. When
this step is coniplete,,your application will he routed to thelappropriate staff and remain 'imtheir•revicw queue. until it
conies up Ibr review.
•
3. Technical Compliance. Once an application is adthinistratively.complete. it isputed to teehnical staff for complianee , •
review. Depending on the type of project. technical staff may Mcludet multiple reviewers'. Wat .sholild be. contacted b);',
phone. lax. email, or mail by your TARGET DATE once the initial technical cOnipliaiice revieW i-s,eoMplete, '
4. Permit Issuance. When the technical compliance review of rhe app. ligation is complete: including .any subs-equent re-.
submittals, each reviewer will approve their section of the applicatien and route it to the Permit Center,: When- all:sections •
of the application are received, a Permit Specialist Will, procesS the•applica-tioh andtgontaet the.person specifiedlon -your'
application for permit pick-up. InThrimition regarding fees and pre -construction meetings (it requircd)•will be pi-ovided by
the Permit Specialist at that time. •
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
i
1
I
.1
1 —- s,
m50441.61
NOS- -
I'
PLANNING DEPT. APPROVED
r • ,
!/ lE 'AJC �- v
- DATE:iv
1