Loading...
2010, 08-18 Permit App: 10002508 GarageProject Number: 10002508 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 8/18/2010 Page 1 of 2 Permit Use: 1600 SQFT GARAGE Contact: BOND, DONALD L & RACHEL K Address: 10121 E NORA AVE C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 290-0753 Group Name: Site Information: Project Name: Plat Key: 001643 Name: MISSION HILLS SUB District: Nort Parcel Number: 45084.0305 Block: SiteAddress: 10121 E NORA AVE Location:: CSV Lot: Owner: Name: BOND, DONALD L & RACHEL K Address: 10121 E NORA AVE SPOKANE, WA 99206 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: ❑ Area: 10,145 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Driveway/Approach Originally Released: 8/17/2010 By: tmelbourn Released By: NOT REQUIRED Originally Released: 8/17/2010 By: TMELBOU Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 8/18/2010 By: tschmidt Operator: JD Printed By: jmm Print Date: 8/18/2010 Project Number: 10002508 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/18/2010 Contractor: OWNER Description Grp Type Notes GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Building Permit Page 2 of 2 Firm: OWNER Phone: (000) This Application: Sq Ft Valuation 1,600 $30,400.00 Totals: 1,600 $30,400.00 Units Unit Desc 1 1 1 SELECT SELECT SELECT Permit Total Fees: 000-0000 Total Project: Sq Ft Valuation 1,600 $30,400.00 1,600 $30,400.00 Fee Amount $451.85 $112.96 $4.50 $569.31 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $569.31 $569.31 $112.96 $456.35 $569.31 $569.31 $112.96 $456.35 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 8/18/2010 Spoka e� , Valleyy Community Development Residential Construction Permit Application 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER:1O.s 25228 PERMIT FEE: New Construction Accessory Bldg Li Addition/Remodel n Deck Other: SITE ADDRESS: iota‘ C NoRA SpaLI) t1kO&. 'Heat" ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: 11ONALt 60 OD Contractor: • Name: .001009L0 6444 Name: / Address: ( 0I D-1 E KORA- Address: / / \State: Zip: State g Zip: 19-014City: City: ekti P77" Phone: s ci ago _0753 Fax: Phone: ✓ Fax: DECK/COV. PATIO SQ. FTG: N/1 Contractor Lic No: Exp Date: Person TYPE: i. City Business Lic. No: Contact Name: /%/�� Phone: / ' Describe the scope of work in detail: Cost of Project: $ s2'/ Si 000 qO A 10 Shop Paroo"'s'e`d Ose. < ' S-i-orOFF ro&oQoekic lt.s ) I.0c90ci shop h01464.1'401 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: a0 / DIMENSIONS: 7� x 40 7 # OF STORIES: / TOTAL HABITABLE SPACE: /6,00 SF MAIN FLOOR TO SQ. FTG: 2(200 D K 2"D FLOOR SQ. FTG: NA UNFIN BASEMENT SQ. FTG: MAREA: IMPERVIOUS SURFACE / & o o FINISHED BASEMENT SQ. FTG: N/9- G GE SQ. FTG: Ain DECK/COV. PATIO SQ. FTG: N/1 30% SLOPES ON PROPERTY: /1/4/4 # OF BEDROOMS:NA-CONS�TRkTION TYPE: i. HEAT SOURCE: A' SEWER O S TIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: Q VISA VIN#: RFC:PINED CS'J PERMIT CENTER Atts (; 2019 !project ft RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable o Brace wall panel locations ❑ Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing o Room usage labels o Smoke detector locations ❑ Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection ❑ Truss or rafter size, spacing & connection o Sheathing size and type o Attic insulation/ air space baffle/ ventilation Ceiling o Joist size and spacing ❑ Size of ceiling gypsum wall board Wall o Height/ top plate/ stud size and spacing/ sole plate ❑ Siding/ exterior house wrap/ anchor bolts o Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing 0 Sheathing or concrete floor size/ insulation Foundation Wall o Concrete or Masonry unit width o Footing bottom to finished ground level depth o Earth to wood separation distance 0 Horizontal & vertical reinforcement if any Footing o Size - 0 Reinforcement if any Radon o Passive system with 6mil vapor barrier ❑ Active system with 6 mil vapor barrier Miscellaneous Construction Details O Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing •-❑ Stairway tread rise & run and nosing o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing scn0F1r\ Valley® • For City Use Only PLUS Project Number t( )C 2 Cf Project Address - If)1.7,I A1'n'v rk 11703 E Sprague Ave Suite B=3 ••Spokane Valley WA 99206-- •�' 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on-going commitment to customer .service, during° the` review process of your. project application, we are providing you with a TARGET DATE for the iriitial•technical application'review: If for;. any reason we cannot meet this date, we will contact with a ;ei iced target date. ' Ia:I:m Your application review TARGET DATE is. The TARGET DATE is the'date we estimate your. project application will have: had its'initial,technical review. It is not the date for approval or permit issuance.. .Tips for a Smoother-Proieet Application Review'. Submit complete, accurate plans and documents. - E.clra time may be'required for re -submittals as project'appliccition revieirer.S itoih oil midtiple,applicotions and mar be several deals hetol-e they egn'look at your new or revised 1/7/?),:I na/ion:.> • ' • i Designate'a specific contact person to,communicate with the City. ' . , , While the person designated as the applicant's conlaci person With die'Citr'?'cht he changed, one'indii'idural with the expertise fit. dealing with reviewer continents would be the best choice for thet entire review- process. I r c Call staff regarding the status of your project o l a tothe target date shown 'at the top of the -page... Although you .should be contacted on or hr the target date, please, feel five lo, concoct us 4V0U haven't heard f 0/77 us by roar target dute.•Staff nuts contact you before the target date if theinitial re%iew i.r complete. BhJollowing'tliis• procedure. you will save time and alio. reviewers to complete the work.» •tore expeditiously ' Steps in the Permit Process I. Counter Contplete...Your application ,has been accepted as counter complete..This mans all :-of the required documents, as indicated on your Pre -Application Checklist have -been submitted• or have been hppuoved,•.for deferred submittal. This does not prevent technical stul I Isom requesting additionafinfornla'tiori as•a result of their technical review" 2. Quality Check. "fhe next step in the process is a quality check. to nlakc.sure that the application iscreviewableand free from substantive Haws that would prevent technical staff from, completing the -technical revicwonce,it is'started.,. When this step is coniplete,,your application will he routed to thelappropriate staff and remain 'imtheir•revicw queue. until it conies up Ibr review. • 3. Technical Compliance. Once an application is adthinistratively.complete. it isputed to teehnical staff for complianee , • review. Depending on the type of project. technical staff may Mcludet multiple reviewers'. Wat .sholild be. contacted b);', phone. lax. email, or mail by your TARGET DATE once the initial technical cOnipliaiice revieW i-s,eoMplete, ' 4. Permit Issuance. When the technical compliance review of rhe app. ligation is complete: including .any subs-equent re-. submittals, each reviewer will approve their section of the applicatien and route it to the Permit Center,: When- all:sections • of the application are received, a Permit Specialist Will, procesS the•applica-tioh andtgontaet the.person specifiedlon -your' application for permit pick-up. InThrimition regarding fees and pre -construction meetings (it requircd)•will be pi-ovided by the Permit Specialist at that time. • WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 i 1 I .1 1 —- s, m50441.61 NOS- - I' PLANNING DEPT. APPROVED r • , !/ lE 'AJC �- v - DATE:iv 1