Loading...
2008, 04-28 Permit App: 08001466 Residence Project Number: 08001466 Inv: 1 Application Date: 4/28/2008 Page 1 of 3 • THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: �.....:,. ,,. �.... VS=._ Permit Use: SFR W/ATT GAR Contact: HOMESTEAD CONSTRUCTION Address: 312 S FARR C-S-Z: SPOKANE WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)892-0454 Group Name: Project Name: Site Information Plat Key: Name: FLORA SPRINGS District: East Parcel Number: 55073.2406 Block: Lot: SiteAddress: 17510 E NORA LN Owner:Name: HOMESTEAD CONSTRUCTION Address: 312 S FARR Location::GRE SPOKANE WA 99206 Zoning: R-3 SF Res District Water District: Hold: Eli Area: 5,000 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information :� ,,. .. .. -. ., ,.:7P: . aff.z, <f Review Building Plan Review Released By Originally Released: 4/28/2008 By: tmelbourn Driveway/Approach Released By: Originally Released: 4/28/2008 By: jdavis Landuse/Zoning/HE Conditions Released By: Originally Released: 4/22/2008 By: cjjanssen Sewer Review Released By: Originally Released: 4/28/2008 By: jdavis Operator: JD Printed By: JD Print Date: 4/28/2008 Project Number: 08001466, by: 1 Application Date: 4/28/2008 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509)892-0454 SPOKANE,WA 99206 Building Characteristics Building Height 22 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 972 $92,330.28 972 $92,330.28 2ND FLOOR R-3 VB 841 $62,805.88 841 $62,805.88 COV DECK R-3 VB 149 $2,235.00 149 $2,235.00 DECK OPEN R-3 VB 80 $1,200.00 80 $1,200.00 GARAGE U-1 VB 460 $8,740.00 460 $8,740.00 Totals: 2,502 $167,311.16 2,502 $167,311.16 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,374.55 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $549.82 Permit Total Fees: $1,928.87 Mechanical Permit Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509)892-0454 SPOKANE,WA 99206 Item Description Units Unit Desc Fee Amount GAS WATER HEATER 1 NUMBER OF $10.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $12.00 VENTILATING FANS 4 NUMBER OF $40.00 Permit Total Fees: $62.00 Operator: JD Printed By: JD Print Date: 4/28/2008 Project Number: 08001466 Inv: 1 Application Date: 4/28/2008 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: HOMESTEAD CONSTRUCTION Finn: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509)892-0454 SPOKANE,WA 99206 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 2 NUMBER OF $12.00 SINKS 5 NUMBER OF $30.00 SHOWERS 1 NUMBER OF $6.00 TUBS 1 NUMBER OF $6.00 DISH WASHERS 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 FLOOR DRAINS 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $90.00 FLORA ESTATES-REFER TO ADE-19-06 FOR LOT WIDTH/FRONTAGE-MI-I FLORA ESTATES-SEE FILE ADE-19-06 FOR LOT FRINTAGE/WIDTH-MH Payment Summary: .: ...., Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,928.87 $1,928.87 $0.00 $1,928.87 Mechanical Permit $62.00 $62.00 $0.00 $62.00 Plumbing Permit $90.00 $90.00 $0.00 $90.00 $2,080.87 $2,080.87 $0.00 $2,080.87 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 4/28/2008 Permit Center SiiokPERMIT NUMBER: s '-e-- / `1 of 11703E Sprague Ave, Suite B-3 ane Spokane Valley,WA 99206 PERMIT FEE: jValley" (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction 7"New Construction ❑ Accessory Bldg Permit Application n Addition/Remodel n Deck n Other: SITE ADDRESS: V17 \`� . . \U;i \;....+ r• ASSESSORS PARCEL NO: LEGAL DESCRIPTION: �.,.,IN �. �,\\.3 \.. ., >; ^: ' Building Owner: Contractor:'` ' > Name: „._ „ Name: Address: Address: . \.- ' 0 c. City: StatState: Zip: State Zip,- City: \`.i. Phone: Fax: Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic. \ 14E'LSvc:N` v c,c. Name: C \_,,. .w 7:„.....c>,,.„,..., Phone: %*-:-)-\c L,L. Li. Describe the scope of work in detail: Cost of Project: $ \ \1/4:--)>`"``'� � -- `k.-• .... .\N.... C R c,�oc , --3ce. ast. Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE V �SPACE: MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: .c 7 2-- - i AREA: ,1. =.v ��P FINISHED BASEMENT .4- GARAGE SQ. FTG: C OV. PATIO QQ. FTG: 30% SLOPES ON SQ. FTG: °‘,L), O K 1,11 _. PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: EAT E: SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. SIGNATURE: DATE: CON , Method of Payment: ' 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: 13Y' _” REVISED 2/15/07 Project New projecta n ClyNPrevious pre-app meeting o ne Transmittal -Plan revisions 0 City of Spokane Valley Transmittal Date: .0,00V y Community Development Tuesday,April27y 2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 17510 E NORA LN Project Number: 08001466 Parcel Number: 55073.2406 Zoning: R-3 Water District: Fire District: FD 01 Applicant: HOMESTEAD CONSTRUCTION Owner: HOMESTEAD CONSTRUCTION 312SFARR 312SFARR SPOKANE WA 99206 SPOKANE WA 99206 (509) 892-0454 e-mail: e-mail: Contact: HOMESTEAD CONSTRUCTION Occupant: 312 S FARR SPOKANE WA 99206 e-mail: (509) 892-0454 e-mail: � nm ) Fr \, Contractor: HOMESTEAD CONSTRUCTION Arch/Engineer (' 312SFARRRD SPOKANE. WA 99206 (509) 892-0454 e-mail: ' - Project SFR W/ATT GAR Description: Building Landuse Engineer Utilities Health Fire Dist Assessor applicatior I SITE PLAN I PLANS C/ Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Only CITY OF PLUS Project Number i. it4 ( ,, ct Addresspoie . : ValleY®y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is ! 2S ( -'f-) LI. T The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 • t \Th 1/4•• ,616 PLANNING DEPT. APPROVED BY. ' • • 6 r • DATE• 4-181IO ri 7-1 - - -- - 6."-•-\ n CITY OF -2: LEY APR 2 T By-- PE- Permit Center Sf>51 11707 L:Center Ave.Suite 106 PERMIT NUMBER: Spokane Valley.WA 99206 (509)688-0036 FAX(509)6$$.0037 PERMIT FEE: Cormatnity Development www.snokanevallev.orq Mechanical Permit Application 0 Commercial [J Residential SITEA/DDRESS: \ ' \\N \. \.\1 ..P., \--s.:-a.• Bulldo Dormer Name: Phone: - Fax: Address: City: State: - Zip: CNtreeter Ns= Phone: Fax: Address: City: State: Zip: License No: City Bueleses L3 Napes ...I.. .. .•r mKy. ...ti•.wr.il •J K . hews DESCRIPTION OF WORK BOF UNITS X COST = TOTAL AMOUNT 1 FUEL BURNING APPLIANCE Bawl le or lees then 100.000 \ X ;12.00 is 2 FUEL BURNING APPLIANCE More then 100.000 . X 215.00 = 3 UNLISTED APPLIANCE(Additional Fee)` Eau&MO or Mees eon 400.000 X $50.00 = 4 UNLISTED APPLIANCE(Additional Fie) Mona Eon 400.000 X ;100.00 ■ , 5 USED APPLIANCE(WSEC min,AFt'E MEW Feud 104w Nee then 400.000 , X $50.00 = 9 USED APPLIANCE/WSEC min.AFUE'reline) Mortpten 400.000 • X $100.00 = 7 BOILER/REFRIGERATION 1=100M BTU X ;12.00 ■ O BOILER/REFRIGERATION 10I.500M BTU X $20.00 = 9 OOILER/REFRIGERATION c Olt•1.000M BTU X ;25.00 ■ 10 BOILER/REFRIGERATION 1.001-1.750M BTU X $35.00 = 11 BOILER/REFRIGERATION Mors ton 1.750M BTU X $60.00 = • 12 GAS LOG,GAS INSERT,GAS FIREPLACE X $10.00 = 13 RANGE X ;10.00 = 14 DRYER • X S10.00 = 15 FUEL BURNING WATER HEATER \ X $10.00 = IS MISC.FUcI.BURNING APPLIANCE _ X $10.00 ■ 17 GAS PIPING(each outlet) X $1.00 = 1I1 DUCT SYSTEMS X ;10.00 = 19 VENTILATING FANS X $10.00 = 20 NR HANDLER(DOES NOT iiludtluclIn0 ID cargos then 10.000 CFM X 812.00 ■ 21 NR HANDLER(DOES NOT Indudeduotlne) ' Owelrhn 10.000 CFM X . 1115.00 = 22 EVAPORATIVE COOLERS X $10.00 ■ 23 TYPE I H00DX • x.00 _ 24 TYPE II HOOD X $10.00 = 25 HEAT PUMP/AIR CONDITIONER " 04 TON X $12.00 = 21 •AIR CONDITIONER 3.15 TON X $20.00 = 27 NR CONDITIONER 10-30 TON X $26.00 ■ 24 'NR CONDITIONER , TON 1 X $35.00 a 29 AIR CONDITIONER Mori 1hM150 TON X X60.00 a 30 LPG STORAGE TANK. X $10.00 = 31 W000 OR PELLET STOVE/INSERT X 410.00 a 32 WOOD STOVE-FREE STANDINGX ;25.00 = 33 REPAIR&ADDITIONS X $15.00 = 34 VENTILATION SYSTEMS X ;12.00 = 30 VENTILATION MECHANICAL EXHAUST X $12.00 ■ 34 NCINERATOR-RESIDENCE X $19.00 = 37 INCINERATOR-COMMERCIAL X $22.00 = METHOD OF PAYMENT: • iybTOTAL OCASH O CHECK 0 VISA 0 Mc 1DO : PRocasswio ram $35.00 CARD R V-- TOTAL PERMIT FEE DUE: AUTHORIZED SIGNATURE: • Permit Center 11707 B Sprague Ave.Suits 106 Spolane Valley.WA 99206 PERMIT NUMBER: (309)683-0036 FAX(509)688.0037 0399111Eb' t www.anokanevallev.ora.eza PERMIT FEE: Plumbing Permit Application 0 Commercial [21 Residential • SPR ADD)RXSD \'\ \C '- N:1-5-.FN Name Phone: Fax: Address: - r r City: ._. State ZIP: tri '7 i jpZ ..' , w Name I Phone: Pax; Address I City: State: ZIP: Lease • wE7s No } , f• ,r-.t;.,��• fi,,i , .... . ,•Ciy Business license Na Name Phone: DESCRIPTION OP WORK SOF UNITS X COST ■ TOTAL AMOUNT 1 TOILETS WATER CLOSET.BIDETS X $8.00 ■ 2 URINALS X $8.00 ' S TUBS i X $8.00 ■ 1 4 SHOWERS(PER TRAP) BATH.STALL,ON-SITE BUILT \ X $0.00 ■ 5 MACSLAYS/BASINS.BAR.FLOOR.KITCHEN. • LAUNDRY.UTILITY.JANITOR PHOTO. 7 - X 38.00 ■ X-RAY.P000.PREP/CULINARY MEAT 0 DISHWASHER \ X $600 • 7 CLOTHES,WASHER \ X 3600' • $ GARBAGE DISPOSAL ' • X $0.00 • 9 WATER SOFTENER ' . X $0.00 ■ 10 ELECTRIC HOT WATER TANK • ' NOTE: IF cAS.BEE 1,IECHANICAL X $8.00 • 11 raNVERFLOW A t�,,,,FA.CASE.COIL.TRENCH.CONDENSATE , \ X $0.00 ■ 12 DRAINS 1 X $8.00 ■ 13 FOUNT DRINKING � X $600 . ■ • WATER PIPINGORAMI•W WASTE. NSTALLATION,ALTERATION.REPAIR, 14 VENT.PLUMBING.REVERy5IL REVERSALS X $600 ■ SEWAGE EJECTOR • GRINDER.SUMP PUMP X , $8.00 ■ 18 WATER USING DEVICE ICE AN/OR COFFEE MAKER.HOSE BIB, STEAMER ^ X $600 ■ -- PROOFER. T RJ SWAMP COOLER • 17 CROSS CONNECTION DEVICE , AND RPVACUUM F VA TDANKgV BO LERS X, $8.00 . . 18 INTERCEPTORS OI� HO SAND TANK. CHEMICAL HOLDING TANK X $0.00 '■ 19 MCN,GAS limrgrdet) NITROUS.OXYGEN X $600 • MISCELLANEOUS PLUMBING 20 FIXTURE , X $0.00 ■ 21 PRIVATE SEWAGE DISPOSAUSYS X $20.00 ■ INDUSTRIAL WASTE 22 MERG X $18.00 ■ MEMO OF PAYMENT: a31115TAL 0 CASH 0 CHECK PROCESSING FEE Q VISA 0 MASTERCARD 318.00 CS/d0 EXPIRES: • TOTAL PERMIT FEE DUE: . AUMOatIZED SIGNATURE: uvu>m