Loading...
2015, 05-28 Permit App: APR-2015-0056 Approach1 Spokane j Valley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 nermitcenter@,spokanevallev.org Project # RECEIVED APPROACH PERMIT APPLICATION PROJECT ADDRESS: 9 2 3 L), 2„,,k START DATE: S— "' i —, s ANTICIPATED COMPLETION'DATE: BUILDING OWNER NAME: , _ J2-c( jel Y✓'0._l MAILING ADDRESS: 1,2 3 n pGC Y t. CITY: 5f,, STATE: (AAA CONTACT PERSON NAME: j- h PHONE:(S-Ov ` . I9- c9Ocf FAX: r1 MAILING ADDRESS: -2...40// I CITY 5 CONTRACTOR NAME: ZIP: STATE: CELL: PHONE: f— FAX: CONTRACTOR LICENSE #:gW�� i?L *EXPIRES: Residential Driveway ❑ Existing Curb & Gutter ❑ Culvert Installation ❑ Other Conditions: ZIP: MQp2 CELL: S (/J �U^ /S CITY BUSINESS LICENSE #: PROJECT DESCRIPTION (Please Provide Site Sketch) ❑ Commercial/Industrial Driveway ❑ Rural Road Section ❑ Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature ";- /*/" 1/ Date: -3� —C2 / DE -001: V-1 Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: Sidewalk ft wide ft from back of curb Streetside Swale I rainage Ditch IP rywell (show location on sketch) Other (please describe below) W z • I 0 Ci a; DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH C:I_iRB _" Lu z W O• I CC o_i EDGE OF ASPHALT CURB RETURN 4' - THROATWIDTHQFT-4•-4' VVI NG (SEE TABLE) WING IF CORNER LOT, DISTANCE FROM STREET NA.I.+I E STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH THROAT WIDTH nFT (SEE TABLE) STREET NAM E CURB RETURN n FT (SEE TABLE) 15' RADIUS RADIUS RETURN /--- NIF CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. DE -001: V-1 Page 2 of 2 Residential Approaches Commercial Approaches Distance from Curb/Radius Retum 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line Ca' r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE -001: V-1 Page 2 of 2