Loading...
2008, 07-21 Permit App: 08002775 Residence Project Number: 08002775 Inv: 1 Application Date: 7/21/2008 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: HOMESTEAD CONST Address: 312 S FARR C-S-Z: SPOKANE,WA 99206- Setbacks:Front 25 Left: 7 Right: 7 Rear: 35 Phone: (509)892-0454 Group Name: Project Name: Site Information: Plat Key: Name: Range District: East Parcel Number: 55073.2215 Block: Lot: SiteAddress: 17511 E NORA LN Owner:Name: HOMESTEAD CONST Address: 312 S FARR Location::CSV SPOKANE,WA 99206- Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 5,000 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information• ;,,. -_ ,. Review Building Plan Review Released By: Originally Released: 7/21/2008 By: tmelbourn Driveway/Approach Released By: NO ROW DRIVEWAY APPROACH REQUIRED Originally Released: 7/21/2008 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Originally Released: 7/18/2008 By: cjjanssen Sewer Review Released By: Originally Released: 7/17/2008 By: jdavis Operator: JD Printed By: jmm Print Date: 7/21/2008 Project Number: 08002775 Inv: 1 Application Date: 7/21/2008 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit ermits: .,, Building Permit Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509)892-0454 SPOKANE,WA 99206 Building Characteristics Building Height 22 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Sn Ft Valuation 1&2 FAMILY R-3 VB 1,215 $115,412.85 1,215 $115,412.85 BASEMENT F R-3 VB 379 $7,580.00 379 $7,580.00 BASEMENT U R-3 VB 509 $7,635.00 509 $7,635.00 GARAGE U-1 VB 428 $8,132.00 428 $8,132.00 Totals: 2,531 $138,759.85 2,531 $138,759.85 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,212.5 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $484.86 Permit Total Fees: $1,701.51 Mechanical Permit Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509)892-0454 SPOKANE,WA 99206 Item Description Units Unit Desc Fee Amount GAS WATER HEATER 1 NUMBER OF $10.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $12.00 VENTILATING FANS 4 NUMBER OF $40.00 Permit Total Fees: $62.00 Operator: JD Printed By: jmm Print Date: 7/21/2008 Project Number: 08002775 Inv: 1 Application Date: 7/21/2008 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: HOMESTEAD CONSTRUCTION Firm: HOMESTEAD CONSTRUCTION Address: 312 S FARR RD Phone: (509)892-0454 SPOKANE,WA 99206 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 3 NUMBER OF $18.00 SINKS 4 NUMBER OF $24.00 SHOWERS 1 NUMBER OF $6.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 FLOOR DRAINS 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $96.00 Notes -.. �.... � ......,, __ � �. . �....... �� ....... FLORA ESTATES-REFER TO ADE-19-06 FOR LOT WIDTH/FRONTAGE-MH FLORA ESTATES-SEE FILE ADE-19-06 FOR LOT FRINTAGE/WIDTH-MH Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,701.51 $1,701.51 $0.00 $1,701.51 Mechanical Permit $62.00 $62.00 $0.00 $62.00 Plumbing Permit $96.00 $96.00 $0.00 $96.00 $1,859.51 $1,859.51 $0.00 $1,859.51 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 7/21/2008 Permit Center PERMIT NUMBER ��,' 71 crrrSov 11703 E Sprague Ave, Suite B-3 pokane Spokane Valley,WA 99206 PERMIT FEE: Valley. (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction [7 New Construction ❑ Accessory Bldg Permit Application nAddition/Remodel ❑ Deck n Other: SITE ADDRESS: . \1S\\ V)0 .Q\ ASSESSORS PARCEL NO: SS 0-\ , 11\S LEGAL DESCRIPTION: \..., \\ j\-" t. Building Owner: Contractor: ` ' Name: Name: ` \ b • Address: ` • \ Address: J, '"\'7.. o C c �d City: s. State> Zip:< , City: State: Zip: �� Phone: Fax: Phone: Fax: Contractor Lic No: Exp Date: \. .. .k.‘„e 5L-'S0.,('‘O C. Contact Person City Business Lic.No: Name: Q._\.,c-. 5....,o.,c..,,�c- f) O l Phone: ' �'Z,- \��cQ D0)�6 )41 Describe the scope of work in detail: Cost of Project: $ V/At!/ GI iff fillib 4-6. ,Th 'vx.' -„ d.is c>\,\,„ ... ,� -6Qs(9,.,.., A6V-4"-- Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. - 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: i 2� AREA: \'\,.c s ` C 7 1..5vo FINISHED BASEMENT _, GA GE SFT DECK/COV. PATJO . FTG: 30% SLOPES ON SQ. FTG: '�1� 0 Qy ` PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE. SEWERSSR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: U\'' DATE: \ \�' 0‘ Method of Payment: ,. 0 Cash 0 Check 0 Mastercard 0 VISA F j 71(1? Bankcard Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 New project Li 001..9\ftrai, Project Precious pre-app meeting ne • Plan recisions Transmittal City of Spokane Valley Transmittal Date: Community Development Friday,July 18,2008 4400000 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 17511 E NORA LN Project Number: 08002775 Parcel Number: 55073.2215 Zoning: R-3 Water District: CONSOLIDATED ID#19 Fire District: FD 01 Applicant: HOMESTEAD CONST Owner: HOMESTEAD CONST 312SFARR 312SFARR SPOKANE, WA 99206- SPOKANE, WA 99206- (509) 892-0454 e-mail: e-mail: Contact HOMESTEAD CONST Occupant: I r" i (( i,= (; r 312 S FARR , - ` , SPOKANE. WA 99206- e-mail: (509) 892-0454 JUL 1 u 2C^9 e-mail: Contractor: HOMESTEAD CONSTRUCTION Arch/Engineer: 10 111 Li 312SFARRRD SPOKANE, WA 99206 (509) 892-0454 e-mail: Project SFR W/ATT GAR Description: Building Landuse Engineer Utilities Health Fire Dist Assessor application site plan \ plans Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Only ; ocumber /SCITY OFokane - 40000 a11e ° y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is ( if ,�; I 0 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REv 9/07 � ate,.,.. "! n n!Rm'r UPI. APPROVED ,k� . DATE I 1 `a [o8 Permit Center 11707 B Sprague Ave. Suite 106 Spolome Valley, WA 99206 (309)683.0036 FAX (309)688-0037 Community Development wvAv spokanevinev.onr PERMIT NUMBER PERMIT FEE: Plumbing Permit Application ❑ Commercial Etj Residential sus ADDRESS: ` \--Ns /l cNc Q sindli4OW114Nal DESORPTION OF WORK 0 OP UNITS X COST ■ TOTAL AMOUNT : Phone: Fax: TOILETS WATER CLOSET. BIDETS Address: •� Lit •.•. 86,E City: State Zip: 2 URINALS J. • A .:,1 - f •- .. : :'..,.,1', q b,r �}rk' .:•. .}. ..rrt:.'. �Ipt_a h.;....j.., `'-,Ye E1pP • 9J�7A,v, i --, .. . Name: I Phone: Fax: i► X116.00 AEdrae: • 1 City : State: DP: BATH. STALL. ON -RITE BUILT License No }mist, 1 i BusmesLicese No: 6 (PACS ...-L.,:lei+..rry ".rl-n•iF ,.�.:,.., .�e!'..' .. -,_ ,frµlIY1�Mt',tf1'.i��r�nJ �drK :.�c.•.•C ,,. t.�•! rIt..'iL� „'4rk yr-.��ifr;.'CaW i'''0.:',. ; !•: Name: DISHWAJHER Phone: \ X 11600 ■ 7 CLCT}ES) ASHER k AUTHORIZED SIGNATURE: asv:sm vuaa DESORPTION OF WORK 0 OP UNITS X COST ■ TOTAL AMOUNT 1 TOILETS WATER CLOSET. BIDETS X 86,E ■ 2 URINALS X =0.00 ■ B TUBA i► X116.00 ■ 4 SHOWERS (PER TRAP) BATH. STALL. ON -RITE BUILT X I WOO ■ 6 (PACS BAR. FLOOR. KITCHEN. LAUNDRY. LALIIDRY. UTILITY. JANITOR. PHOTO. X-RAY. FOOD. PREP/CUUNARY MEAT A • -• `� X 8600 ■ 0 DISHWAJHER \ X 11600 ■ 7 CLCT}ES) ASHER k X K00 6 GARBAGE DISPOSAL' X 86.00 ■ 6 WATER SOFTENER • . ' X 85.00 ■ 10 ELECTRIC HOT WATER TANK NOTE: IF (AS. SEE MECHANICAL X 86.00 ■ 11AREA. CASE. COIL TRENCH. CONDENSATE \ X 86.00 ■ 12 �ERFLOW I X 86.00 ■ . 13 FOUNTP NS. DRN CINO I X 86.00 ■ • 14 WATER PMM1GI)RAW-MIWASTE. VENT. PLUMBING. REVERSALX NSTALLATION.ALTERATION.REPAIR. 86.00 . ■ 15 SEWAGE EJECTOR • GRINDER SUMP PUMP X 86.00 ■ 15 WATER USING DEVICE ICE AN/OR COFFEE MAKER. HOSE BIB. STEAMER PROOFER CARBONATO SWAMP COOLER X 86.00 ■ 17 15 CROSS CONNECTION DEVICE AND R P VACUUM . EA TCKER. VALVE. BOILERS X 16.00 ■ INTERCEPTORS . GR�ASE TR/1P. SAND TRI1P: CHEMICAL HOLDING TANK 86.00 • n 16 MEDICAL GAS (per outlet) NITROUS. OXYGEN X 86.00 ■ 20 S PLUMBING FIXTURE X 86.00 ■ 21 PRIVATE SEWAGE DISPOSAAIYS 820.00 ■22 BASTE ' 815.00 ;Jr ■ • • METHOD OF PAYMENT:AL G CASH . • (2•IEcK - 0 VISA Q MASTERCARD FEE $35.00 s36.00 . Car& EXPIRES: • TOTAL PURR PEE DUE: AUTHORIZED SIGNATURE: asv:sm vuaa > Permit Center 11707 E Sprague Ave,Suite 106 Spokane Valley,WA 99206 PERMIT NUMBER: (509)633-0036 FAX(509)632-0037 PERMIT FEE: Community Development www.snokanevallev.ora Mechanical Permit Application - 0 Commercial 6 Residential SITE ADDRESS: . . V\S\\ \..?J c A • Bdldbi°Viser N \ :. • . ,,:...,.• ,�..:.-: Name: "...I..: Phone: Fax: c, iZ.r, Address: City: State: - p: Coatractor Narne: Phase: fax: ._ Address: City: State: Zip: LIMON No: City Business Lia t, Name: __ DESCRIPTION OP WORK 0O UNITE X COST = TOTAL AMOUNT 1 FUEL BURNING APPLIANCE Easel to or lees Ikon 100.000 \ - X $12.00 ■ 2 FUEL BURNING APPLIANCE Mtln then 100.000X ;15.00 in 3 UNLISTED APPLIANCE(Additional Fee) Emil b Or Hee ten 400.000 , X , $50.00 = , 4 UNLISTED APPLIANCE(Additional Fee) More Son 400,000 X ;100.00 a 5 USED APPLIANCE(WSEC inks.AFUE iutlna) ` EWO bar Na Stat 400.000 , X $50.00 ■ 6 USED APPLIANCE(WSEC mks.AFUE ild nes) ` 14:1,9,199 400X00 • X 3100.00 ■ 7 BOILER/REFRIGERATION 1-100M BTU X ;12.00 a • BOILER/REFRIGERATION 101.000M ETU X $20.00 a 0 BOILER/REFRIGERATION r 601 aJ.000M BTU X ;25.00 ■ 10 BOILER/REFRIGERATION 1.001-1, 5OM ETU X $35.00 = 11 BOILER/REFRIGERATION .- More than 1.750!BTU X $60.00 = . 12 GAS LOG,GAS INSERT,.GAS FIREPLACE 4 X ;10.00 a - 13 RANGE X 310.00 = 14 DRYER • • X tio.00 = 15 FUEL BURNING WA[ER NEATER • • . 1 X 610.00 ■ 19 I MISC.Full.BURNING APPLIANCE X 310.00 = 17 GAS PIPING outlet) X $1.00 , _ 111 DUCT SYSTEMS _ X $10.00 a 19 VENTILATING FANS liC X $10.00 ■ 20 AIR HANDLER(DOES NOT badios ton 10.000CP111 X $12.00 is 21 AIR HANDLER(DOES NOT Indudi duane) tbOMerthen 10.000 CPM X . $16.00 = 22 EVAPORATIVE COOLERS ' X 110.00 I. 23 TYPE IHOOD X • >F60.00 a 24 TYPE II HOOD X ;10.00 ■ 26 HEAT PUMP/AIR CONDITIONER . • •04 TON X $12.00 = 24 •AIR CONDITIONER 8-15 TON X ;20.00 ■ V AIRODNDmONER ' 18J0TON X , $25.00 a 2d • CONDITIONER ' >000TON 1 X• � $35.00 = . 20 AIR CONDITIONER When 10 TON .X $60.00 `_ 30 LPG STORAGE TANK. • 1 X $10.00 = 31 WOOD OR PELLET STOVEANSERT • X $10.00 a 32 WOOD STOVE-FREE STANDING X $25.00 ■ 33 REPAIR&ADDITIONS X 315.00 = 34 _ VENTILATION SYSTEMS X $12.00 Is 35 VENTILATION MECHANICAL EXHAUST X ;12.00 = 36 INCINERATOR-RESIDENCE • X ;10.00 = 37 INCINERATOR-COMMERCIAL ' X x.00 = METHOD OF PAYMENT: AL EXAM CHECK Oman OMC EXPM PRQCURN Fa :36.00 CARD t V TOTAL PERWT FEE DUE: AUTHORIZED SIGNATURE: • ems=woos -