2009, 03-26 Permit App: 09000654 Pole BldgProject Number: 09000654 Inv: I Application Date: 3/26/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: 24 X 30 POLE BLDG Contact: KALIN CONSTRUCTION Address: PO BOX 102 C - S - Z: COLBERT WA 99005 Setbacks: Front Left: Right: Rear: Phone: (509) 991-2278 Group Name: Project Name Site Information: .'vW. Plat Key: Name: Range District: Nort Parcel Number: 45073.2110 Block: Lot: SiteAddress: 2324 N PARK RD Owner: Name: EARLY, L M Address: PO BOX 11403 Location:: CSV SPOKANE, WA 99211-1403 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Hold: ❑ Area: 17,970 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review [Released By. , Originally Released: 3/19/2009 By: tmelbourn Driveway/Approach f Released By: T Originally Released: 3/26/2009 By: jdavis Septic Sys Review Released B Originally Released: 3/26/2009 By: pwarne Landuse/Zoning/HE Conditions Released By: Approved with conditions relative to airport hazard overlay zone. Originally Released: 3/24/2009 By: LBARLOW Operator: JD Printed By: JD Print Date: 3/26/2009 Project Number: 09000654 Inv: I Application Date: 3/26/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit PermLtS:..x�a.....V,. Building Permit - --- - - - -- Contractor: KALIN CONSTRUCTION Firm: KALIN CONSTRUCTION Address: PO BOX 102 Phone: (509) 991-2278 COLBERT WA 99005 Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT This Application: Scl Ft Valuation 720 $13,680.00 Totals: 720 $13,680.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Total Project: Scl Ft Valuation 720 $13,680.00 720 $13,680.00 Fee Amount $237.25 $4.50 $94.90 $336.65 Notes,_, bldg to go in the same spot as the old one. - no additonal sewage generated. Pursuant to SVMC 19.110.030.E.3 a title notice is required as a condition of the issuance of the building permit. The city will prepare and record the notice. The applicant is responsible to pay the Spokane County recording fee of $42.00. The fee must be provided to the city prior to building permit issuance. The fee may provided at the time that building permit fees are paid. Direct questions to the project planner, L Barlow. Notice is herein provided that this property is located within the Airport Hazard Overlay Zone of the COSV and is subject to restriction on height and use pursuant to SVMC 19.110.030 Airport Hazard Overlay Zone as it may be amended from time to time. Driveway paving is not required since the driveway is existing and no modifications are proposed. PaymentSummary «,,�. ,-;�..�. . .^..a ., .. •,,,.�,m.,:, Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $336.65 $336.65 $94.90 $241.75 $336.65 $336.65 $94.90 $241.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 3/26/2009 Sp6kane� Valley Site Address: 2324 N PARK RD Parcel Number: 45073.2110 Zoning: R-2 Fire District: FD 01 Applicant: KALIN CONSTRUCTION PO BOX 102 COLBERT WA 99005 (509) 991-2278 e-mail: Contact: KALIN CONSTRUCTION PO BOX 102 COLBERT WA 99005 (509) 991-2278 e-mail: Contractor: KALIN CONSTRUCTION PO BOX 102 COLBERT WA 99005 (509) 991-2278 Project Transnu*ttal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting Plan revisions F] Transmittal Date: Wednesday, March 18, 2009 Project Number: 09000654 Water District: ORCHARD AVENUE Owner: EARLY, L M PO BOX 11403 SPOKANE, WA 99211-1403 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Ofc�,,a RV -C Adder Project 24 X 30 POLE BLDG Description: I 'ed low ti,"R ��� Dili Lt �9J/1 �CG1%c. ,fir � � � -c, Please send all plan review and project commentso� v'tf e6,-mai(to la cbi" highlighted individuals. c). vD = Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLA PLAN �(t, Y"T f A e Cly a I 'ed low ti,"R ��� Dili Lt �9J/1 �CG1%c. ,fir � � � -c, Please send all plan review and project commentso� v'tf e6,-mai(to la cbi" highlighted individuals. c). vD = 00 Spokane ,,,;oo4fVa11ey4' Community Development Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www. spokanevalley. org PERMIT NUMBER: PERMIT FEE: Residential Construction ❑ New Construction Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: N ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: DIMENSIONS: Name: C Lvx TOTAL HABITABLE SPACE: Address:- V4 P City: Q V v Stater Zip: Ca/,� Phone: Fax: Contact Person Name: Phone: — -2 Z % Describe the scope of work in detail: Proposed Use: Contractor: Name: i Address: c9 ve-_,_ City: C -.C/ L-0 State: �, 4 Zip: (�A j Phone: —7 7-7 Fax. Contractor Lic No: UL Exp Date: (—J - Zz_ 2007 City Business Lic. No: r Cost of Project: $ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TOP AK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: I q -Z 1,:3o)</ 0 J Eich MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGEy�Q. TG- J DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: G PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. c� SIGNATURE: DATE: •— /01 C/ Method of Payment. ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard ISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location & sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑ Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑ Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations 0 Handrail / Guard height & spacing Site Address: 2324 N PARK RD Parcel Number. 45073.2110 Zoning: R-2 Fire District: FD 01 Applicant: KALIN CONSTRUCTION PO BOX 102 COLBERT WA 99005 (509) 991-2278 e-mail: Contact: KALIN CONSTRUCTION PO BOX 102 COLBERT WA 99005 (509) 991-2278 e-mail: Contractor: KALIN CONSTRUCTION PO BOX 102 COLBERT WA 99005 (509) 991-2278 Project 24 X 30 POLE BLDG Description: Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Precious pre -app meeting E] Plan rezisions ❑ Transmittal Date: Wednesday, March 18, 2009 Project Number. 09000654 Water District: ORCHARD AVENUE Owner. EARLY, L M PO BOX 11403 SPOKANE, WA 99211-1403 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. Spokar►�~ jUalley° For City Use Only PLUS Project Number Project Address i te. 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is�`�_ TG' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 f I I F-------------- t CIP �v ZQ eo E a, t t ZCr P r K pro po, eQ- PLANNING DEPT. APPr " .:r