2012, 10-10 Permit: SW-12002362 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002362
Permit Issued Date:
10/10/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: EDGERTON
Permit Type: SEWER
Primary Contact: KALIN EXCAVATION
Applicant: KALIN EXCAVATION
Address: 9229 E WOOLARD RD
COLBERT, WA 99005
Phone: 509-954-9101
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
2325 N PARK RD
35124.0101
Subdivision: ASSESSORS PLAT #1
Assessor's Description: ASSESSORS 1 ALICE S67FT L1;N25FT OF L2
Inspection Area:
Zoning:
Owner:
Address:
Phone:
Email:
RAUGUST, LARRY
2325 N PARK RD
SPOKANE, WA 99212-1546
Water District: Orchard Fire District: Spokane Valley Fire
Avenue Irrigation District
#6
Land Area: 14536 Square Feet
CONTRACTOR INFORMATION:
General Contractor
KALINE*0431 B
KALIN EXCAVATION
9229 E WOOLARD RD
COLBERT, WA 99005
509-954-9101
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST
WORKING
O
INSTALLER OMPLY WITH ALL REQUIREMENTS OF THE WA STATEDEPT OF LABOR & INDUSTRIES, INCLUDDING E REQUIRES
THE
RELATED TO TRENCH SAFETY.
Printed by: IIS APPPOOL\ASP.NET v4.0
Date Printed: 10/10/2012 10:00:14
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002362 10/10/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/10/2012 10:00:14
Printed by: IIS APPPOOL\ASP.NET v4.0