2010, 05-24 Permit App: 10001442 Pole BldgProject Number: 10001442 Inv: I Application Date: 5/24/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: 30 X 40 POLE BLDG Contact: QUALITY STEEL BLDGS
Address: 361 SANDY SHORES RD
C - S - Z: NEWPORT, WA. 99156
Setbacks: Front Left: Right: Rear: Phone: (509) 468-1606
Group Name:
Site Information: Project Name
Plat Key: 000716 Name: ELECTRIC RAILWAY SUBURBAN HOME ADD District: Nort
Parcel Number: 45072.1106
SiteAddress: 2718 N PARK RD
Location:: CSV
Block: Lot:
Owner: Name: STROH, MAXX C
Address: 2718 N PARK RD
SPOKANE, WA 99212
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE
Area: 12,972 Sq Ft Width: 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review Information: X NEW,
Review
Building Plan Review Released By:
Originally Released: 5/19/2010 By: tmelbourn
Driveway/Approach Released By:
IS REQUIRED
Originally Released: 5/24/2010 By: LBARLOW
Landuse/Zoning/HE Conditions Released`By:
approved with condition to hardpave the driveway
Originally Released: 5/24/2010 By: lbarlow
Permits:...w:r =Wh - um -W r ,,, q._.-3: x�..
Operator: JD Printed By: jmm Print Date: 5/24/2010
Project Number: 10001442 Inv: 1 Application Date: 5/24/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: QUALITY STEEL BUILDINGS INC
Address: 361 SANDY SHORES RD
NEWPORT WA 99156
Building Permit
Firm: QUALITY STEEL BUILDINGS INC
Phone: (509) 468-1606
Disclaimer.
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 5/24/2010
This Application:
Total Project:
Description Grp Tyne
Notes Sq Ft Valuation
Sg Ft Valuation
POLE BDLG U-1 VB
1,200 $22,800.00
1,200 $22,800.00
Totals: 1,200 $22,800.00
1,200 $22,800.00
Item Description
Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE
1 SELECT
$363.25
ACCESSORY PLANS REVIEW
1 SELECT
$90.81
WSBCC SURCHARGE
1 SELECT
$4.50
Permit Total Fees:
$458.56
Notesa.
APPROACH PERMIT IS REQUIRED
The driveway shall be hardpaved from the right-of-way up to the garage entrance. The
contractor
(Nathan - Quality Steel Bldgs) was notified
of this requirement by phone on May 21, 2010. Discussed
again with Murial on 5/24/10.
Payment Summary • _ e'
Permit Type Fee Amount Invoice Amount Amount Paid
Amount Owing
Building Permit
$458.56 $458.56 $90.81
$367.75
$458.56 $458.56 $90.81
$367.75
Disclaimer.
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 5/24/2010
Permit Center PERMIT NUMBER:
Spol�ane 11703 E Sprague Ave, Suite B-3
1�A11 Spokane Valley, WA 99206 PERMIT FEE:
'II0k*Valley- (509)688-0036 FAX: (509)688-0037
www spokanevalley ori
Community Development
Residential Construction xx New Construction XX Accessory Bldg
Permit Application F-1Addition/Remodel ❑Deck ❑Other:
SITE ADDRESS: 2718 N PARK RD
ASSESSORS PARCEL NO: 45072.1106
LEGAL DESCRIPTION: ELEC RY SUB HM CAMPBELL W138FT L4 B11
Building Owner:
Name: STROH, MAXX C
Address: SAME
City: SPOKANE State: WA Zip: 99212
Phone: 509-474-1825 Fax:
Contact Person
Name: NATHAN ROBINSON
Phone: 509-468-1606
Describe the scope of work in detail:
30x40x12'2"
Proposed Use:
SHOP
Contractor:
Name: Quality Steel Buildings,
Inc.
Address: 361 SANDY
SHORES RD
City: NEWPORT State: WA Zip: 99156
Phone: 509-468-1606 Fax:
Contractor Lic No: Exp Date: 2/10
QUALIB081 C7
City Business Lic. No:
601370591 11 71
Cost of Project: $
fnll..Anrr MTTCT ho cmmplete• (write N/A if not applicable)**********************
••----------- lllV1V 11V
HEIGHT TO PEAK:
17
11111 ++vvs ..ice �-----
DIMENSIONS:
30x40,K1 Z-
# OF STORIES:
1
NONE HABITABLE SPACE:
2 NU FLOOR SQ. FTG:
N/A
UNFIN BASEMENT SQ. FTG:
N/A
IMPERVIOUS SURFACE
AREA: NONE
MAIN FLOOR TO SQ.
FTG:
N/A
FTG:
GARAGE Sp.
1200 0
CONSTRUCTION TYPE:
DECK/COV. PATIO SQ. FTG:
N/A
HEAT SOURCE: NONE
30% SLOPES ON
P TY: NO
tEWE!RVRSEPTIC?
FINISHED BASEMENT
SQ. FTG: N/A
# OF BEDROOMS:
N/A
POLE
....-,;-- -4: „ � rlleicllinn the
The permitee verifies, acknowledges and agrees by their signature that: i) 1T tns permit 1z' lur 00"OLIu111.,,, - -
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance ith the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Pilermit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes CFQrdinances. 6 ns or additional information may be required to be submi ted, and subsequently approved before
this application can be p
SIGNATURE: _.DATE: lO �o
Method of Payment:
❑ Cash C ❑ Check
Bankcard #:
Authorized Signature:
❑ Mastercard XX VISIt
Expires: VIN#• This document originally contained
confidential credit card information which
and the original document destroyed
AN 652014-030
Effective 10-28-07 pursuant to 505 D
Page 1 of 1
C-Mncnments and Settings\mbrown.QSBINC\My Documents\permits\Residential Building Permit App valley.doc
Logi ,5we--Ox) ti
9)6r�fmx)
�AnCk -S L '
7D, k z.;e_
1
PLANNING DEPT. APPROVED
w
r
.� F�'-rQ
n o
c�
�4e-fm Ac)c) )5�, w+ ,-s
Oe_s-or*i 6v 020 5no�
QUALITY STEEL BUILDINGS, INC.
361 SANDY SHORES RD.
NEWPORT WA. 99156
2. 11
361 SANDY SHORES RD.
NEWPORT WA. 99156
For City Use Only
PLUS Project Number
CITY OF Project Address
OKane
Val ley 50
11703 E Sprague Ave Suite B-3 ♦Spokane Valley WA 99206
4;o* 9.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenterCspokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiect Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us ifyou haven't heardfrom us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07