Loading...
2008, 02-15 Permit App: 08000361 Pole BldgProject Number: 08000361 Inv: t Application Date: 2/15/2008 Page 1 of 2 THIS IS NOTA PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 X 30 POLE BLDG Contact: HAIGHT, LISA LYNE Address: 2708 S PINES RD C - S - Z: SPOKANE, WA 99202 Setbacks: Front Left: Right: Rear: Phone: (509) 928-7411 Group Name: Site Information: Project Name: Plat Key: 002392 Name: SKYVIEW ACRES ADD District: Soul Parcel Number: 45284.1101 SiteAddress: 2708 S PINES RD Location:: CSV Block: Lot: Owner: Name: HAIGHT, LISA LYNE Address: 2708 S PINES RD SPOKANE, WA 99202 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 16,132 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 2/11/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: • Permits: Originally Released: 2/15/2008 By: mpalaniuk Operator: JD Printed By: JD Print Date: 2/15/2008 Project Number: 08000361 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/15/2008 Contractor: ZIEGLER LUMBER COMPANY Address: 4220 N MARKET ST SPOKANE, WA 99207 Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Building Permit Page 2 of 2 Firm: ZIEGLER LUMBER COMPANY Phone: (509) 489-8760 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 720 $13,680.00 720 $13,680.00 Totals: 720 $13,680.00 720 $13,680.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $237.25 $59.31 $4.50 $301.06 Notes: t Payment Summar)," r Permit Type Building Permit Fee Amount $301.06 Invoice Amount $301.06 $301.06 $301.06 Amount Paid $0.00 Amount Owing $301.06 $0.00 $301.06 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 2/15/2008 Spokane Valley. Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org PERMIT NUMBER: (` PERMIT FEE: New Construction Ilil'Accessory Bldg U Addition/Remodel ❑ Deck Other: SITE ADDRESS: )los ri f//LP,a yOjq. ill ASSESSORS PARCEL NO: o&Xt V - Q92zZ LEGAL DESCRIPTION: -sir) /?C L/ 6/l Buildrn Owner . � � .�- - `� � � �. k; • i + .�. ,�.g r. .. ontractor• 7 : • -., - /j� Name: ii) , l t_/✓✓J Address: ow 6 (� / `w ' y.T-�/!'/�/ �// :r / z lawiU /�� H .tt rid, Art / C/ ,, Name: gob F LISa, Ste Kele er gob Address: A70gi cc 4 City: Spoke State: kii,f, Zipgeti--vv'' ����- City: O� n piState: VL, /A Zipggz/C Phone: ---7yg i—. v4se / Fax: -7effa' _ 4)C�._/..).‘ Phone: 7T/ I Fax: - ic Contra;t r LNo: : 1 .y 3//(0, xp Date: ;Contact..�f crson"'AS �'T ` - e r --'.6t.`:; �; ~{r' •. °�'- - .. -,F. CONNST7jION TYPE: ill Q.iA.Y City Business Lic. No. ILO h litivir Name: I I i Phone: 1 pi -7 %]7 i.IJ/t g19In / cat Describe the scope of work in detail: Cost of Project: $ 92_0w 64/ 11 u.f 2d pitlltedeltgig a„, bet ,e�ir�'�1r�tot -G SC - Bi r o y �C v/' e/ Proposed Use: Q' boG Q tel/ L qci_ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS:# , a4 x60Yi° OF STORIES: /VA TOTAL HABITABLE SPACE: , MAIN FLOOR TO SQ. FTG: 1 l n 2Nu FLOOR SQ. FTG: OA UNFIN BASEMENT SQ. FTG: NA IMPERVIOUS SURFACE AREA: , /- FINISHED BASEMENT/ SQ. FTG: Lik GARAGE SQ. FTO: 6 NA DECK/COV. PATIO SQ. FTG: r/A 30% SLOPES ON PROPERTY: ,J4 # OF BEDROOMS: A CONNST7jION TYPE: ill Q.iA.Y HEAT SOURCE: A SEWESEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can bl processed. SIGNATUR Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: c9/?% ❑ VISA VIN#: *Mane Valley® 11703 E Sprague Ave Suite B-3 1 Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall@spokanevalley.org Residential Plari Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans -' With details, roof plan, framing plans & details. O Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details O Roof framing plan and details ❑ Furnace and hot water heater location. O All header locations: type, size, and connections O Foundation plan O Insulation information Siokane . For City Use Only PLUS Project Number animaO_ (D I Project Address z_-7nck (-mac, 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevaltey.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. if for any reason we cannot meet this date, we will contact you with a revised target 'date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review i Submit complete, accurate plans and documents. Evn a time may be required Jin- re -submittals as project application reviewers work an multiple applications and it nrav be several clays before they can look at your new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can he changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. i Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should he contacted on or by the ten stet date, please feel free to contact us if you haven't heard from us by your target date. Staff nrav contact you before the target date if the initial review is complete. By following this procedure, you will sure time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your 1're-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it conies up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE —APPLICANT PINK — BUILDING FILE REV 9/07 PROJECT PLUS it: Address: Contact: INFORMATION PROJECT TRACKING LOG wit vtr. ~fid "td Date Out 4001141. y'f^'lvy'1=Y�:i1 Mi Date In Date Out rz ll��akfy's,1��°�y1 fE NOTES: =ME ■r111uau■ ■eill111n■ NESS 1111111.11 OMEN 4 3 a 1 PLANNING DEPT. APPROVED 4- BY: /Y1kla..4N t 3 I DATE: • 2-45/a 8 f - - t G°) 1 •. _.. t { L 1' 4-