Loading...
2015, 04-30 Permit: SW-15000406 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000406 Permit Issued Date: 04/30/2015 Expiration Date: 04/30/2016 Project Description: SEWER Project Name: ORCHARD AVE Primary Contact: LARRY MILLER EXCAVATING Phone: 509-218-3335 Applicant: LARRY MILLER EXCAVATING Address: 7117 E RUTTER AVE SPOKANE, WA 99212 Phone: 509-218-3335 Email: SITE INFORMATION: Site Address: Parcel Number: 3310 N PARK RD 45063.4409 Assessor's Description: ORCHARD AVE ADD PT OF B94-95 EXC N8FT OF L4 & EXC BEG 8FT S OF NWCOR L4 TH 8FT E PAR TO NL TH ON CURVE TO LEFT TO PT ON WL 6FT S OF POB TH N TO POB IN L4 B95 N15FT OF L5 B95 N57FT OF S142FT OF B94 E Inspection Area: : (509)-477-3675 Owner: ALLEN, RICHARD E Address: 3310 N PARK RD SPOKANE VALLEY, WA 99212 Phone: Email: Water District: Orchard Avenue Irrigation Fire District: Spokane Valley Fire District #6 Zoning: Land Area: 9077.84 Square Feet CONTRACTOR INFORMATION: LARRYME878NT, Exp. 08/30/2015 LARRY MILLER EXCAVATING INC 7117 E RUTTER AVE SPOKANE, WA 99212 509-926-1200 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $27.12 $125.00 $152.12 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Public Transit Benefit Area SVRP Aquifer Boundary: Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate? (use of private well) from DOE prior to permit issuance. Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire Date Printed: 04/30/2015 14:43:07 Project Coordinator: Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -15000406 Permit Issued Date: 04/30/2015 Expiration Date: 04/30/2016 CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/30/2015 14:43:07 Project Coordinator: Susan Clark