Loading...
2011, 04-25 Permit App: 11001048 ShopProject Number: 11001048 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/28/2011 Page 1 of 2 Project Information: Permit Use: 32 X 24 X12 - SHOP - STORAGE BUILDING Contact: SPOKANE POST FRAME Address: 7001 E 2ND C - S - Z: SPOKANE, WA 99212 Setbacks: Front Phone: (509) 926-0865 Group Name: Project Name: Site Information: Plat Key: Left: Right: Rear: Name: Range Parcel Number: 45063.3611 SiteAddress: 3402 N PARK RD Location:: CSV Block: Lot: District: Nort Owner: Name: DAVIS, JACKIE M Address: 3402 N PARK RD SPOKANE VALLEY, WA 99212-150 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Area: 10,584 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 4/28/2011 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 4/27/2011 By: tschmidt Operator: jmm Printed By: jmm Print Date: 4/28/2011 Project Number: 11001048 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/28/2011 Page 2 of 2 Building Permit Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME Address: 7001 E 2ND AVE Phone: (509) 926-0865 SPOKANE, WA 99212 This Application: Total Project: Description Grp llym Notes Sq Ft Valuation Sa Ft Valuation POLE BDLG U-1 VB PLAN 768 $14,592.00 768 $14,592.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE RECORDING FEES Contractor: OWNER Notes: Payment Summary: Permit Type Building Permit Totals: 768 $14,592.00 768 $14,592.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT 1 AMOUNT Permit Total Fees: Miscellaneous Fees Due Fee Amount $251.25 $78.31 $4.50 $62.00 $396.06 Firm: OWNER Phone: (000) 000-0000 Fee Amount Invoice Amount $396.06 $396.06 Amount Paid $62.81 Amount Owing $333.25 $396.06 $396.06 $62.81 $333.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 4/28/2011 Permit Center Sj J 11707E Sprague Ave, Suite 106 Spokane Valley, WA 99206 41110.1"1�i�fley• (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction Permit Application PERMIT NUMBER: PERMIT FEE: ❑ N nstruction Add tion/Remodel ❑ Other: (Accessory Bldg ❑ Deck SITE ADDRESS: 3- dZ Xr'� . /f\1 j 2-66 ASSESSORS PARCEL NO: - Lt,7 06 3 - N:11 LEGAL DESCRIPTION: Building Owner: Name: p-Ifct Po ,5-7-- 7-44 Address: ®1 i . 2 0-1. - City: S Po c_ State: met- Zip: $i 241_ Name: lc i t ,D t...S City Business Lic. No: IMPERVIOUS SURFACE AREA: 6::,_ Address: 3 Lib 2_ M, eco i. 2s(,. # OF BEDROOMS: City: ; �, fAil`P, „ °0` � HEAT SOUR `, R SEPTIC? n State: Zip: ? Z Phone: 2(51, — 2 1 Fax: Contact Person Name: Cricr or 0-0 (e - Phone Z.G — Of Describe the scope of work in detail: Contractor: Name: p-Ifct Po ,5-7-- 7-44 Address: ®1 i . 2 0-1. - City: S Po c_ State: met- Zip: $i 241_ Phone: 1 Z G— U id 3 Fax: 1 LL -5 I t( Contractor Lic No. Exp Date: 8/2_4/ 22 L City Business Lic. No: Cost of Project: $ Liv Proposed Use: Sib�A 6-� €SLsP **************The********************** following MUST be complete: (write N/A if not applicable) HEIGHT TO PEAK: 16 . DIMENSIONS: y. LY # OF STORIES: C I} TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2`'T° FLOOR SQ. FTG: e---- UNFIN BASEMENT SQ. FTG: -- - IMPERVIOUS SURFACE AREA: 6::,_ FINISHED BASEME SQ. FTG: GARAGE SQ. FTQ' '9'& 90 oi' DECK/COV. I 'ES ON Ale, 0A/P-V Y: # OF BEDROOMS: ONSTRUCTION TYPE: HEAT SOUR `, R SEPTIC? n The permitee verifies, acknowledges and agrees by their sighature that 1) If thi dwelling is/will be served by potable water. 2) Ownership of this City of Spokani signatory is the property owner or has permission to represent the property owne in full compliance with the City of Spokane Valley Development Code. Reference Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a pi local laws, codes or ordinances. 6) Plans or additional information may be requii this application can be processed. SIGNATURE: Method of Payment: 0 Cash Check Bankcard #: 1775t -A,0 -- Authorized Signature: REVISED 2/15/07 /4)441(7 oTCf 771W DATE: (-1/ ?,-(s / ) ! 0 Mastercard ❑ VISA Expires: VIN#: a dwelling, the owner. 3) The :tion is to be done the City of I federal, state or Itly approved before SIT1an� jUalley For City Use Only PLUS Project Number ' J ,( Project Address <' 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. _ f Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 SPOKANE POST FRAME, INC. Engineered Pole Buildings shops garages storage buildings cabins kits -cost plus 7001 E. 2nd Ave Spokane.WA 99212• ROLFE WILL Sales Manager - Owner 509-926-0865 • Fax 509-924-5161 or 1-866-926-0865 Visit us at www.spokanepostframe.com PLANNING DEPT, Site Plan BY: DATE: `//v --Vii lardy I'Ir:irth `.. Show streets/alley Show septic/sewer/drafnfleld Show existing buildings Show proposed building Show setbacks - front, rear, sides. Show lot size 7ONING CRITERIA - SPOKANE JOB NAME ).t- -Da v1 s' 6240 -DSO- ADDRESS 2'40 z N Pi tik Q sRvorkie, VA- - y 1444, LEGAL. DESCRIPTION Tic- .4 14S1St 3. 3611 zr' If closer than 5' to property line - need firewall and parapet Out of rear 30' and closer than 5' - need waiver from neighbor Cnn t cover more than 50% of rear 25' ( orner 101. building must be 20' from property line `..0 minimum setback from front property line Less than 8' from residence - need f irewall Maximum square footage - l0f of lot area (Must be less than 3.000 sq. ft.) Hay not subdivide lot so that building is more than 10% of residual lot area Spunty 1 closer than 5' to property line - need firewall 10' from septic/drafnfleld Less than 6' from residence - need firewall 5E14ERAL SETBACKS ARE 5 K WN BELOW. WILL NEED TO CHECK CODE BOOK AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE ALSO CHANGES WITH DIFFERENT ZONING. minimum side yard setback 5 minimum rear yard setback 1• Inimum front and side street setback - 25' from -property line or 55' from center of road - whichever Is greater iv 125-90F0 1.11 e $y /i-0ilLS. zr Jt