2011, 04-25 Permit App: 11001048 ShopProject Number: 11001048 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/28/2011 Page 1 of 2
Project Information:
Permit Use: 32 X 24 X12 - SHOP - STORAGE BUILDING Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Phone: (509) 926-0865
Group Name:
Project Name:
Site Information:
Plat Key:
Left: Right: Rear:
Name: Range
Parcel Number: 45063.3611
SiteAddress: 3402 N PARK RD
Location:: CSV
Block:
Lot:
District: Nort
Owner: Name: DAVIS, JACKIE M
Address: 3402 N PARK RD
SPOKANE VALLEY, WA 99212-150
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE
Area: 10,584 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Released By:
Originally Released: 4/28/2011 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 4/27/2011 By: tschmidt
Operator: jmm Printed By: jmm Print Date: 4/28/2011
Project Number: 11001048 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/28/2011 Page 2 of 2
Building Permit
Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME
Address: 7001 E 2ND AVE Phone: (509) 926-0865
SPOKANE, WA 99212
This Application: Total Project:
Description Grp llym Notes Sq Ft Valuation Sa Ft Valuation
POLE BDLG U-1 VB PLAN 768 $14,592.00 768 $14,592.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
RECORDING FEES
Contractor: OWNER
Notes:
Payment Summary:
Permit Type
Building Permit
Totals: 768 $14,592.00 768 $14,592.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
1 AMOUNT
Permit Total Fees:
Miscellaneous Fees Due
Fee Amount
$251.25
$78.31
$4.50
$62.00
$396.06
Firm: OWNER
Phone: (000) 000-0000
Fee Amount Invoice Amount
$396.06 $396.06
Amount Paid
$62.81
Amount Owing
$333.25
$396.06 $396.06 $62.81 $333.25
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 4/28/2011
Permit Center
Sj J 11707E Sprague Ave, Suite 106
Spokane Valley, WA 99206
41110.1"1�i�fley• (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction
Permit Application
PERMIT NUMBER:
PERMIT FEE:
❑ N nstruction
Add tion/Remodel
❑ Other:
(Accessory Bldg
❑ Deck
SITE ADDRESS:
3- dZ Xr'� . /f\1
j 2-66
ASSESSORS PARCEL NO: - Lt,7 06 3 - N:11 LEGAL DESCRIPTION:
Building Owner:
Name: p-Ifct Po ,5-7-- 7-44
Address: ®1 i . 2 0-1. -
City: S Po c_ State: met- Zip: $i 241_
Name: lc i t ,D
t...S
City Business Lic. No:
IMPERVIOUS SURFACE
AREA: 6::,_
Address: 3 Lib 2_ M,
eco i.
2s(,.
# OF BEDROOMS:
City: ; �, fAil`P, „
°0` �
HEAT SOUR `, R SEPTIC?
n
State:
Zip: ? Z
Phone: 2(51, — 2 1
Fax:
Contact Person
Name: Cricr or 0-0 (e -
Phone Z.G — Of
Describe the scope of work in detail:
Contractor:
Name: p-Ifct Po ,5-7-- 7-44
Address: ®1 i . 2 0-1. -
City: S Po c_ State: met- Zip: $i 241_
Phone: 1 Z G— U id 3 Fax: 1 LL -5 I t(
Contractor Lic No. Exp Date: 8/2_4/ 22 L
City Business Lic. No:
Cost of Project: $
Liv
Proposed Use:
Sib�A 6-� €SLsP
**************The**********************
following MUST be complete: (write N/A if not applicable)
HEIGHT TO PEAK: 16 .
DIMENSIONS:
y. LY
# OF STORIES: C I}
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2`'T° FLOOR SQ. FTG:
e----
UNFIN BASEMENT SQ. FTG:
-- -
IMPERVIOUS SURFACE
AREA: 6::,_
FINISHED BASEME
SQ. FTG:
GARAGE SQ. FTQ'
'9'& 90 oi'
DECK/COV. I 'ES ON
Ale, 0A/P-V Y:
# OF BEDROOMS:
ONSTRUCTION TYPE:
HEAT SOUR `, R SEPTIC?
n
The permitee verifies, acknowledges and agrees by their sighature that 1) If thi
dwelling is/will be served by potable water. 2) Ownership of this City of Spokani
signatory is the property owner or has permission to represent the property owne
in full compliance with the City of Spokane Valley Development Code. Reference
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a pi
local laws, codes or ordinances. 6) Plans or additional information may be requii
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash Check
Bankcard #:
1775t -A,0 --
Authorized
Signature:
REVISED 2/15/07
/4)441(7
oTCf 771W
DATE: (-1/ ?,-(s / ) !
0 Mastercard ❑ VISA
Expires: VIN#:
a dwelling, the
owner. 3) The
:tion is to be done
the City of
I federal, state or
Itly approved before
SIT1an�
jUalley
For City Use Only
PLUS Project Number ' J ,(
Project Address <'
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
_ f
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV 9/07
SPOKANE POST FRAME, INC.
Engineered Pole Buildings
shops
garages
storage buildings
cabins
kits -cost plus
7001 E. 2nd Ave
Spokane.WA 99212•
ROLFE WILL
Sales Manager - Owner
509-926-0865 • Fax 509-924-5161
or 1-866-926-0865
Visit us at
www.spokanepostframe.com
PLANNING DEPT,
Site Plan
BY:
DATE: `//v --Vii
lardy
I'Ir:irth `..
Show streets/alley
Show septic/sewer/drafnfleld
Show existing buildings
Show proposed building
Show setbacks - front, rear, sides.
Show lot size
7ONING CRITERIA - SPOKANE
JOB NAME ).t- -Da v1
s' 6240 -DSO-
ADDRESS 2'40 z N Pi tik Q
sRvorkie, VA- - y 1444,
LEGAL. DESCRIPTION
Tic- .4 14S1St 3. 3611
zr'
If closer than 5' to property line - need firewall and parapet
Out of rear 30' and closer than 5' - need waiver from neighbor
Cnn t cover more than 50% of rear 25'
( orner 101. building must be 20' from property line
`..0
minimum setback from front property line
Less than 8' from residence - need f irewall
Maximum square footage - l0f of lot area (Must be less than 3.000 sq. ft.)
Hay not subdivide lot so that building is more than 10% of residual lot area
Spunty
1 closer than 5' to property line - need firewall
10' from septic/drafnfleld
Less than 6' from residence - need firewall
5E14ERAL SETBACKS ARE 5 K WN BELOW. WILL NEED TO CHECK CODE BOOK
AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE
ALSO CHANGES WITH DIFFERENT ZONING.
minimum side yard setback
5 minimum rear yard setback
1• Inimum front and side street setback - 25' from -property line or 55' from
center of road - whichever Is greater
iv
125-90F0
1.11 e $y
/i-0ilLS.
zr
Jt