Loading...
2013, 01-25 Permit: SW-13000037 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -13000037 Permit Issued Date: 01/25/2013 Expiration Date: 01/26/2013 Project Description: Project Name: Permit Type: SEWER CONNECTION SKYVIEW SEWER SEWER Primary Contact: VIETZKE EXCAVATING CO Applicant: Address: Phone: Email: VIETZKE EXCAVATING CO 2011 S CRAIG RD AIRWAY HEIGHTS, WA 99001 509-244-9607 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: Zoning. 2908 S PINES RD 45284.1224 SKYVIEW ACRES SKYVIEW AC L24 B12 Owner: Address: Phone: Email: ZAPPY NORTHWEST, LLC 741 R 0 RANCH RD LIBERTY HILL, TX 78642 Water District: Spokane Fire District: Spokane Valley Fire County Water District #3 Land Area: 14997 Square Feet CONTRACTOR INFORMATION: General Contractor VIETZEC121MA VIETZKE EXCAVATING CO 2011 S CRAIG RD AIRWAY HEIGHTS, WA 99001 509-244-9607 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit $125.00 $125.00 Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Pnnted: 01/25/2013 105629 Printed by: IIS APP POOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -13000037 01/25/2013 Expiration Date: 01/26/2013 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed' 01/25/2013 10:56:29 Printed by. IIS APPPOOL\SmartGovProdApp