2010, 07-26 Permit App: 10002237 Deck, Project Number: 10001137 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Date: 7/26/2010 Page 1 of 2
Permit Use: INSTALL DECK AT THE BACK OF HOME Contact: WOODS, RONALD L & CAROLYN S
Address: 11410 E PONDEROSA DR
C - S - Z: SPOKANE VALLEY, WA 99206-9486
Setbacks: Front Left: Right Rear: Phone: (509) 228-9160
Group Name:
Site Information:
Project Name:
Plat Key: 003264 Name: SP -0042-78 District: Sout
Parcel Number: 44042.9076
Block: Lot:
SiteAddress: 11410 E PONDEROSA DR
Location:: CSV
Owner: Name: WOODS, RONALD L & CAROLYN
Address: 11410 E PONDEROSA DR
SPOKANE VALLEY, WA 99206-948
Zoning: R-2 SF Res Suburban District
Water District: 101 SPO CO WATER DIST#3B Hold: ❑
Area: .60 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 7/23/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By: -
Originally Released: 7/23/2010 By: Ibarlow
Permits: ,
Operator: jmm Printed By: jmm
Print Date: 7/26/2010
, Project Number: 10002237 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/26/2010 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation Su Ft Valuation
DECK OPEN R-3 VB PLAN 144 $2,160.00 144 $2,160.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 144 $2,160.00 144 $2,160.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$83.25
$4.50
$33.30
Permit Total Fees: $121.05
Notes:
Stop Order posted.
Stop work posted 11:00 a.m.
NO HOME PROFESSION PERMIT REQUIRED
Issued home occupation Affidavit of Exemption 10/29/2007 - Carolyn S. Woods, "JCRS Enterprises"
(mjP)
SP -1129-97 - BUILDING PERMITS ARE REQUIRED TO BE REVIEWED BY STORMWATER -
SEE MEMO IN PLAT FILE JAS
Payment Summon:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$121.05 $121.05 $33.30 $87.75
$121.05 $121.05
$33.30 $87.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 7/26/2010
Permit Center• __
^Icm o f 1 i 703 ESpra�u'ect ve, Suite B`-3
®���� [Spolca Valley`;.WA_�9206
ValleI. (509J688.003?EFAX"(509)68'-0037
\tr. r
CS www.spokaneyalley.org
Community Develotpment Jtt.
Residential,Constrnd cc New Construction �ccessory Bldg
n
Permit Applicatio` Addition/Remodel vj Deck
I1 Submittal # Other:
PERMITNUMBER/0 /Pc; 3-7
PERMIT FEE:
SITE ADDRESS: //4/O C. PONDER05/4 .bR.
ASSESSORS PARCEL NO: 41%O `ea. 9074 LEGAL DESCRIPTION: D 9-a4/ -'ri TRC e P 5P7S-Dyd
73t/.VG A Prw of SNPL -Tr-£D
nnier aP .V id-oV h rg 78o8,23do6/c
Building Owner:
ntractor: S £C F F/fnl / LY
Name:RUNALD /, $ CARozVW S. ///000 5
Na e:
Address/f4/ 0 2 . POA/ 6 ERo SA Po boy /11/9/0
Ad ss:
City:,. pOkBNf VA -441Y State: ill/9Zip: 9,07040City:
State: Zip:
Phone: Fax:
0107,9 - 97/00
Phone: Fax:
DECK/COV. PATIO SQ. FTG:
a9'X /o' oK/#V.sq n-
Contractor is No: Exp Date:
Contact Person
CONSTRUCTION TYPE:
N/A
City Business 'c. No:
6/9-ROLyN
Name: LJOObS
Phone: c72a8 — 9 7(07
Describe the scope of work in detail:
Cost of Project: $ 300.
o�
/NSTA/-.c DFCX 3r /TGK DF Ha
Proposed Use: ENCoy OvrSIDi
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
W /A-
DIMENSIONS:
N/A.
# OF STORIES:
N/A
TOTAL HABITABLE SPACE:
N /9
MAIN FLOOR TO SQ.
FTG: it///
2N0 FLOOR SQ. FTG:
N/4
UNFIN BASEMENT SQ. FTG:
N/A
IMPERVIOUS SURFACE
AREA: 411/4
FINISHED BASEry ENT
SQ. FTG: AIM
GARAGE SQ. FTG:
NM
DECK/COV. PATIO SQ. FTG:
a9'X /o' oK/#V.sq n-
30% SLOPES ON
PROPERTY: /t///9
# OF BEDROOMS:
/Yin
CONSTRUCTION TYPE:
N/A
HEAT SOURCE:
A1/49-
SEWER OR ,SEPTIC?
A1/15//5/
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:L�Q/1-z-G 4 iii DATE: %/fib/ U
Method of Payment:
El Cash 0 Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
❑ Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
O Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
01Deka-
Floor plantside-viewhdimensionnst
DAloor Joistrdecking"directionTsizetand pspacing_e:
S tiirway.treadf'rise &-run-and- o ing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location'
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
gt!F„ ootings/'post/ and -beam -size -and -locations
andrail'/-Gua`rd-heig"ISt'&=spacing
*Wane
Va!iey«
For City Use Only
PLUS Project Number. /d—
Project,Address: i(Y/o ?, ck-tztIC
11703 E Sprague Ave•Suite 8-3 • Spokane Vattey`WA 99206 • ,
:509.688; 0036 ♦ Fax: 509.688.0037, f permrtcenter@spokanevalley.org
As• part of our' 'on-going commitment: to customer .ser'icc'during the ,review. process' of<'youriproject:
application, we are providing you with a TARGET DATE for' the initial technical: application review.', If for.
any reason we cannot meet this date,•we willcontact you with a ret'isec/target.date� ;,"..
Your application `review .TARGET DATE is
The TARGET. DATE.is'the date'. we estimate your project application will have had: its' initiate`:technical_
review: It is not the date for,approval or permit issuance.:. '
.:Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents. . - .
Extra tune nuts be t:equireel /0/ ie.-.duhnnar11 Las p1ojeci application reviewers . it
nun' be ,several duns before then (0??' look at satin/7611' or,ret;is_ed in/orination.
Designate a specitie contact person to communicate with the City.'
7Nlrile the person desigliared as ihe.applicant'1 contact person with the Cui can•bechai/g>ed,:oneiindivirlual''trlth.the
t tperti.lt for dealing with revierer comments would be the best c•haice jiii ,lie'entire i eview ppcess. :
Call staff regarding the status of your project only after the target date sliotgn at the top of -the page..` '
Although you sliorld he contacted on or by the target date, please% d( jive to contact 1/5•il.vo/ hal,en'('lreattisire) us ,
by )-our target date Staff MQP contact VUa hc/o re the, target date if the ihitial 161 new i5' complete..Bi jo(louing this'
pocedure. 10il.tvill save timernu/ allow fhe reviewers to c'omlilete't//e work inose ctpedrtiously.
..
Steps in the Permit Process
I. Counter Complete. Your application has been accepted, as countei- complete., Thisimeansalt.ot',the'requird
e
documents, as indicated on your Pie -Application Checklist hat,c.been'submitted„or hase`•been •approved `hos deferred
submittal. This does not prevent technical staff froth requesting additionail-information as a'result of their technical review.
•
2. Quality Check. The next step in the process is a quality check to make *sime that the application is reviewableand free
from substantive naw s that would prevent technical staff frocompleting the teclutical'resiew;once iris started.;•When
this step is complete, your application •will be routed to the appropriatestatf;'and :remairi.inTheir review',queue'until it
cones up for review.
3. Technical Compliance. Once an application is administratively complete; it isrouted to technical staff tor: compliance
review. Depending, the type of projectrteclinical staff may include multiple reviewers.:you-should' htcimtacted by
phone, fax, email, or mail by your TARGET -DATE once the initial technietil compliance review is complete. , ..
4. Permit Issuance. When the technical conlpliance'ieview of the application, is complete, including any'subsequent re -
submittals. each reviewer will approve their section of the application and route it to the Permit Center. -When all sections .
of the application are received, a Permit Specialist will.process'tlie,application aitd eontact'the person -specified on yotir,
application for permit pick-up. Information regarding fees and 'pre -construction Meetings (if;required) will be provided by
the Permit Specialist at that time. . ..
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
MP P ROS P1 A-1-€9 /Do'
FRoin HoUSEY0 73 -11e -k
PRoPEP rY k NE.
<;try w
/5tAte,z,
PLANNING DEPT. APPROVED
By•
1
- gX
1101;s:_g • • • •
. \,‘
. \
I. .
, • •
-cott/A-t.v bte,e• . • ••• •
iY) r /c) g5
/ ci • y
.11 r. C: .1)
2
611,196" E
athiAtie
• ,qppRoyJm/n-V
4eri FRam GfiA?16-£
PRoP ER ry nvc
RECEIVED
CSV PERMIT CENTER
JUL 23 2010
proiect #_(c)_...:-— •
I St ibmitta! #
• ; I