Loading...
2004, 11-29 Permit: 04009204 Heat Pump" Sane ,��-Valley BUILDING DIVISION 11,'!17 E Sprague Avenue Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 11111 E PONDEROSA DR Project Number: 04009204 Inv: 1 issue Date: 11/29/2004 Permit Use: HEAT PUMP Parcel Number: 44042.2030 Subdivision: Block: Lot: Zoning: UNK Owner: NICOLSON, GERALD Address: 11111 E PONDEROSA DR SPOKANE., WA 99206 Building Inspector. Water Dist Applicant: STURMHEATINGINC 1112 N NELSON SPOKANE, WA 99202 Contact: STURM HEATING INC 1112 N NELSON SPOKANE. WA 99202 Setbacks -Front: Left: Group Name: Project Name: Phone: (509) 3254505 Phone: (509) 3254505 Right: Rear: Permits Mechanical Permit Contractor: ST6RM HEATING t,icense #: STURMI'210QF HEAT POMP OR A/C 0-3 TONS 1 $12.00 PROCESSINGFEE $35.00 Total Permit Fee: $47.00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Payment Summary Total Fees AmountPaid AmountO vine Tran Date Receipt # Pavment And $47.00 $47.00 $0.00 11/29/2004 5962 $47.00 Processed By: DOMPIER, DAWN PERMIT Printed By: MIKE TURBAK Page I of I NOTICE A Spokane Valley Development Permit belongs to the land owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the permit owner that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of cerLain`varts of :`.e construction at the permit owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when fortes and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. SUB SLAB/RADON SYSTEM/ PLUMBING - after rough -in with appropriate test and before covering. MECHANICAL - rough -in of piping (with test), before covering, metal chimneys before concealment, and final. PLUMBING - ROUGH IN -when supply and drain piping have been installed, before concealment and with appropriate test FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. INSULATION - prior to the installation of drywall. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit- Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a penmit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy, completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for'spedal inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and • Road cuts for utilities or driveways, City of Spokane Valley Mechanical, City of Spokane Valley Building Division Public Works 8695373 or State Department of Transportation 688-DO54 324-6000 Permits and inspections for electrical wiring, State Department • Permits and inspections for sewer connection, Spokane County of Labor and Industries 324-2640 Utilities Division 477-3604 Permits and inspections for on-site septic systems, Spokane • Fire Sprinkler and alar systems and private access road Regional Health District 324-1560 Inspection, Spokane Valley Fire District 928-1700 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance, 456-8000. FLOODPLAIN DEVELOPMENT. All Development within a designated floodplain located in the City of Spokane Valley jurisdiction shall comply with Article III of the Spokane Valley Uniform Development Code. PERMIT FEES, EXPIRATION AND REFUNDS All City of Spokane Valley permit fees shall be established by a City of Spokane Valley Resolution and may be found in Appendix B. Schedule C of the Spokane Valley Uniform Development Code. Copies of these documents can be obtained on the Citys website (www.spokanevalley.org) or within the City of Spokane Valley's Permit Center. All permits shall expire by limitation and be declared void K a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the peril issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. . REFERENCED CODES AND APPEALS All referenced construction codes are available for review at the City of Spokane Valley Permit Center. Compliance with construction codes is mandated in the City of Spokane Valley. Any questions, disagreements or disputes generated as a result of city staff decisions shall be directed to the City Building Official. If the issue remains unresolved, further appeal shall be in compliance with the City of Spokane Valley Uniform Development Code Section 120.39.8.