2012, 10-11 Permit: SW-12002378 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002378
Permit Issued Date:
10/11/2012
Expiration Date:
Project Description: SEWER CONNECTION
Primary Contact:
H & R COMPLETE
Project Name: W PONDEROSA I
Applicant: -
H & R COMPLETE
Permit Type: SEWER
Address:
PO BOX 749
NEWMAN LAKE-, WA 99025
Phone:
509-218-8336
Email:
SITE INFORMATION:
Site Address: 10924 E PONDEROSA DR Owner: BRADSHAW, ROBERT R & DIXIE P
Parcel Number: 44042.2403 Address: 10924 E PONDEROSA DR
SPOKANE, WA 99206-9106
Subdivision: Valley Vista Estates Phone:
Assessor's Description: VALLEY VISTA ESTATES LT 3 BLK 1 Email:
Inspection Area:
Water District: Spokane Fire District: Fire District 8
County Water District #3
Zoning: Land Area: 29113.8 Square Feet
CONTRACTOR INFORMATION:
General Contractor
HRCOMI'972DD
H & R COMPLETE
PO BOX 749
NEWMAN LAKE-, WA 99025
509-218-8336
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 10/11/2012 12:22:24 Printed by: IIS APPPOOLWSPAET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002378 10/11/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE,
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Dale Printed: 10/11/2012 12:22:24 Printed by: IIS APPPOOLWSP.NET v4.0