Loading...
2008, 05-20 Permit App: 08001859 Lean ToProject Number: 08001859 Inv: I Application Date: 5/20/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: 12 X 36 LEAN TO Contact: QUALITY STEEL BLDGS Address: 7810 N MARKET ST C - S - Z: SPOKANE, WA. 99217 Setbacks: Front Left: Right: Rear: Phone: (509)468-1606 Group Name: Site Information: Project Name: Plat Key: 002093 Name: PONDRA PINES ADD District: Sout Parcel Number: 45324.1221 Block: Lot: SiteAddress: 4209 S PONDRA DR Owner: Name: SCHULTZ FAMILY TRUST Address: 4209 S PONDRA DR Location:: CSV SPOKANE, WA 99206-8616 Zoning: R-1 SF Res Estate District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: .00 Acres Width: 224 Depth: 160 Right Of Way (ft): 50 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released $y. Originally Released: 5/19/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 5/19/2008 By: mpalaniuk Permits: _.r. Operator: JD Printed By: JD Print Date: 5/20/2008 Project Number: 08001859 Inv: I Application Date: 5/20/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: QUALITY STEEL BUILDINGS INC Address: 7810 N MARKET ST SPOKANE, WA 99207 Building Permit Firm: QUALITY STEEL BUILDINGS INC Phone: (509) 468-1606 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $213.56 $213.56 $0.00 $213.56 $213.56 $213.56 $0.00 $213.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 5/20/2008 This Application: Total Project: Description Grp Type Notes Sg Ft Valuation Sa Ft Valuation POLE BDLG U-1 VB 432 $8,208.00 432 $8,208.00 Totals: 432 $8,208.00 432 $8,208.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SEEECT $167.25 ACCESSORY PLANS REVIEW I SELECT $41.81 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $213.56 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $213.56 $213.56 $0.00 $213.56 $213.56 $213.56 $0.00 $213.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 5/20/2008 AS 03A0kiddV 09 s not_rc Nr:7 4.1221 r Yloi)c5e tilLa\ 8 A • parcizA 53:29 , TH£ ON-SITE SrWAC• . ♦;EVkESENTED BY Tlff t;gAWiN� , g Lt7T TO GE CON<T£�!ED AS M SPOKANE COUNTY HEALTH DISTRICT ENVIRONMENTAL 7ZI-d THDIVISqION APPL.lI FINAL INSPECTION FOR SEWAGE SYSTEM AT O r (numerical address or lot and block inplat or section, township,, and range and road) Please fill out in heavy dark line (felt-tip pen or equal) with.a straight edge. Plan is to include outline of structure (if available) as its position occurs on the prop- erty. Identify by measurement actual location of septic tank, drainfield lines, drywell, or other on-site sewage facilities, property lines closest to drainfield, on-site well (when applicable), driveway, and road frontage. Septic tank access must be referenced to a known fixed surface structure. NORTH Sew a system designed far � bedrooms osiy. FINAL INSPECTION MADE BY COMMENTS: 1/83 s C/y'D Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newproject ❑ Previouspre-app meeting ❑ Plan revisions 0 Transmittal Date: Friday, May 16, 2008 Site Address: 4209 S PONDRA DR Project Number: 08001859 Parcel Number: 45324.1221 Zoning: R-1 Water District: SPO CO WATER DIST#36 Fire District: FD 01 Applicant: QUALITY STEEL BLDGS 7810 N MARKET ST SPOKANE, WA. 99217 (509) 468-1606 e-mail: INFO@QSBINC.COM Contact: QUALITY STEEL BLDGS 7810 N MARKET ST SPOKANE, WA. 99217 (509) 468-1606 e-mail: INFO(a)QSBINC.COM Owner. SCHULTZ FAMILY TRUST 4209 S PONDRA DR SPOKANE, WA 99206-8616 e-mail: Occupant: e-mail: Contractor. QUALITY STEEL BUILDINGS INC Arch /Engineer: 7810 N MARKET ST SPOKANE, WA 99207 (509) 468-1606 e-mail: Project 12 X 36 LEAN TO Description: Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Only V l' OF Project Number 1 SPLUSCITpokane Project Address Valley„;oO, 11703 E Sprague Ave Suite B-3 1 Spokane Valley WA 99206 509.688.0036 1 Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org ” As part of our on-going commitment to customer service during the. review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application' will have had its initial technical review. It is not the date for approval or permit issuance. . Tips for a Smoother Project Application Review .� Submit complete, accurate plans and documents. Extra time na,1; be required fur re -submittals as project application reviewers work on multiple applications and it niap be several daps before thev can look at.vour new or revised information. ' Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the eapertisefor dealing with reviewer comments would be the best choice.for the entire review process. i Call staff regarding the status of your project only after the target date shown at the top of the page. Although von should be contacted on or by the target date, please fieel free to contact its if lvou haven't heard f'oa its by roar target date. Stajf auv contact you before the target date if the initial review is complete. By following this procedure. You will save tone and allow the reviewers to complete the work more expeditiously.. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff firom requesting additional information as a result of their technical review. . 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. " 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You ,should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your 'application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9/07 PURLIN SIZES AND SPACING sl sl SIMPS❑N J❑IST HANGER USE 2' X 6' DF -L #2 @ 2' 0' D.C., 8' BAYS 72- d NAIL @ 10" D.C. USE 2' X 6' DF -L #2 @ 2' 0' O.C., 10; BAYS 2" X 6" ❑R 2" X 8" PURLIN USE 2' X 8' DF -L #2 @ 2' 0' D.C., 12BAYS / X 6" FULL WIDTH PURLIN CONNECTION METHOD PURLINS WILL BE HUNG FROM LEAN TO RAFTERS WITH STANDARD SIMPSON JOIST HANGERS OR EQUAL. NOTES FOR LEAN TO CONNECTION DETAIL S1 MANUFACTURED TRUSS NOTCH POSTS 1-1/2' EACH SIDE TO PROVIDE TRUSS SEAT, S2 TRUSS SUPPORT POST, SEE POST/FOOTING SCHEDULE, S3 1 - 3/4' DIA. MACHINE BOLT S4 2' X 6' X 24' DF -L CONNECTION BLOCK. PROVIDE BLOCK EACH SIDE OF POST. SS TYP. PURLIN. SEE CHART AT LEFT FOR SIZES, S6 2' X 6' OR 2' X 8' EAVE GIRT S7 2' X 6' DF -L GIRTS @ 24' O.C.. TYPICAL 8', 10' OR 12' BAYS S8 6' X 6' FULL SIZE LEAN TO POST S9 6 - 16ci NAILS IN BLOCK & 4 - 16d NAILS IN RAFTER 10 LEAN-TO RAFTERS - SEE CHART & SECTION A -A NOTES FOR LEAN TO GIRTS GIRTS ARE NOT REQUIRED FOR SUPPORT OF POSTS. BUILDING LEAN TO'S MAY BE OPEN OR ENCLOSED USE 2' X 6' DF -L #2 GIRTS @ 2' 0' O.C. FOR 8' BAYS USE 2' X 6' DF -L #2 GIRTS @ 2' 0' O.C. FOR 10' BAYS USE 2' X 6' DF -L #2 GIRTS @ 2' 0' O.C. FOR 12' BAYS ,O 0' 1V LEAN-TO ADDITION TO POST FRAME BUILDING CONTINUOUS ROOF SLOPE L r1 N.T.S. NOTES FOR FOOTING DETAIL aS1 TREATED POSTS AS SIZED PER SCHEDULE 2 VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING �3 UNDISTURBED SOIL FOOTING DETAIL N.T.S. BUILDING SPECIFICATIONS: GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2006), AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 30 OR 40 PSF LIVE LOAD, 85 & 90 MPH WIND SPEED, EXPOSURE B AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 30 OR 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LL = 0 PSF CEILING DL = 1 PSF * ROOF DL. ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. * MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER ACCORDING TO IBC TABLE 1804.2. LESSER SOIL CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-05. WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L #2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9.1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF IBC 2003. ALL NAILS INTO PRESERVATIVELY TREATED WOOD SHALL BE HOT -DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR BUILDINGS SHALL BE AS NOTED ON THE PLANS. ALL POST MATERIALS SHALL BE HEM -FIR #2 OR BETTER, FULL DIMENSION AND GRADED BY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM i0 ASTM A307. METAL PANELS MAY BE DELTA RIB STYLE, GALVANIZED OR PAINTED, 29 GAUGE THICKNESS, ASTM A653 STRUCTURAL QUALITY (SQ), Fy = 80.0 ksi. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL TO WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED, GASKETED 1" OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. PURLIN CONNECTION METHOD NOTES FOR LEAN TO CONNECTION DETAIL S1 MANUFACTURED TRUSS NOTCH POSTS 1-1/2' EACH SIDE TO PROVIDE TRUSS SEAT. S2 TRUSS SUPPORT POST, SEE POST/FOOTING SCHEDULE. S3 3/4' DIA. MACHINE BOLT - NOT REQ'D ON ENDWALLS S4 2' X 6' X 24' DF -L CONNECTION BLOCK. PROVIDE BLOCK EACH SIDE OF POST. SS TYP. PURLIN. SEE CHART AT LEFT FOR SIZES, S6 2' X 6' OR 2' X 8' EAVE GIRT S7 2' X 6' DF -L GIRTS @ 24' O.C.. TYPICAL 8', 10' OR 12' BAYS Se 6' X 6' FULL SIZE LEAN TO POST (SD 16d NAILS 10 LEAN-TO RAFTERS - SEE CHART & SECTION A -A PURLINS WILL 13E HUNG FROM LEAN TO RAFTERS WITH STANDARD SIMPSON JOIST HANGERS OR EQUAL. NOTEi PURLINS TO BE SPACED @ 16' O.C. UPPER HALF OF LEAN-TO SPAN TO RESIST SNOW DRIFT LOAD LEAN-TO ADDITION TO POST FRAME BUILDING STEP DOWN LEAN-TO ROOF N.T.S. ry w 3- w F - Q' W 8 1/2" 2" X 8', 2" X 10" OR 2" X 12' VERTICAL MEMBERS — SEE CHART SECTION A - A STANDARD RAFTER DETAILS 'Z'T""DS❑N J❑IST HANGER a W W z W H - n w 6" OR 2' X 8" PURLIN NAIL @ 10' D.C. A o , I_ A IV u!. �" 11c VERTICAL MEMBERS — SEE CHART SECTION A - A BOX BEAM DETAILS 6d NAIL @ 10" D.C. 6d NAIL @ 10" D.C. 2" X LAMINATED TO ENDWALL RAFTER WHERE 20 REWD - SEE CHAR E" ENDWALL RA SECTION A - A STANDARD ENDWALL RAFTER DETAILS n FTERn - SEE Cn HART V.Loi (G$, /Pre THE us �.. ..' -j OF .,. T416r 1.. !uti/ �C COPY�Cic�N pK Tp 11EPOC+t corrr.!:aHr vauno,a O rc n=waao ea euc tt 4k - Am RIF �y F1.8 EXPIRES 12 29 O9 RAFTERSECTION A SPAN BAY SPACE LIVE LOAD PSF RAFTER SECTION SIZE OR COMBINATION ENDWALL RAFTER SECTION SIZE OR COMBINATION B' 0' 8' 0' 30 2 - 2' X 8' 2' X 8' e' 0' 10, ol 30 2 - 2' X 8' 2' X 8' 30 2 - 2' X 10' 2' X 10' 81-9-1 81 0' 40 2 - 2' X 8' 2' X 8' 8' 0110, ol 40 2 - 2' X 10' 2' X 10' 40 2 - 2' X 10' 2' X 10' i' 8' 0' 30 2 - 2' X 10' 2' X 10' 30 2 - 2' X 10' 2' X 10' 01 01 IP, ' 30 2 - 2' X 12' 2' X 12' 10, 0' 8' 0' 40 2 - 2' X 10' 2' X 10' 40 2 - 2' X 12' 2' X 12' I' 40 2 - 2' X 8' & 2 - 2' X 6' BOX 2' X 12' & 2' X 8' P-1 8' 0' 30 2 - 2' X 12' 2' X 12' ' 30 2 - 2' X 6' & 2 - 2' X 6' BOX 2' X 12' & 2' X 6' 1 • 2 - 2' X 10' & 2 - 2' X 6' BOX 2' X 12' & 2' X 8' 8'0' 2-2'X8'&2-2'X6'BOX 2'X12'&2'X8' ' 0.' 40 2 - 2' X 10' & 2 - 2' X 6' BOX 2' X 12' & 2' X 8' • 40 2 - 2' X 10' & 2 - 2' X 6' BOX 2 - 2' X 12' 8' 0' 30 2 - 2' X 10' & 2 - 2' X 6' BOX 2' X 12' & 2' X 10' 30 2 - 2' X 10' & 2 - 2' X 6' BOX 2' X 12' & 2' X 10' ' 30 2 - 2' X 12' & 2 - 2' X 6' BOX 2 - 2' X 12' ' 8' 0 2 - 2' X 10' & 2 - 2' X 6' BOX 2 - 2' X 12' ' 40 2 - 2' X 12' & 2 - 2' X 6' BOX 2 - 2' X 12' DF -L #1 ' 40 2-2'X12'&2-2'X6' BOX DF -L#1 2 - 2' X 12' DF -L #1 8' 0' 30 2 - 2' X 12' DF -L S. STRUCT. 2' X 12' DF -L S, STRUCT. -n' 30 2 - 2' X 12' & 2 - 2' X 6' BOX 2 - 2' X 12' ' ow, n, 30 2-2'X12'&2-2'X6' BOX DF -L#1 2 - 2' X 12' DF -L S,S. 8' 0' 40 2 - 2' X 12' & 2 - 2' X 6' BOX 2 - 2' X 12' DF -L #1 2 - 2' X 12' & 2 - 2' X 6' BOX DF -L S.S 2 - 2' X 12' DF -L S.S. L40 40 4-2'X12'&2-2'X6'13OXDF-LS.S2 - 2' X 12' DF -L S.S. ry w 3- w F - Q' W 8 1/2" 2" X 8', 2" X 10" OR 2" X 12' VERTICAL MEMBERS — SEE CHART SECTION A - A STANDARD RAFTER DETAILS 'Z'T""DS❑N J❑IST HANGER a W W z W H - n w 6" OR 2' X 8" PURLIN NAIL @ 10' D.C. A o , I_ A IV u!. �" 11c VERTICAL MEMBERS — SEE CHART SECTION A - A BOX BEAM DETAILS 6d NAIL @ 10" D.C. 6d NAIL @ 10" D.C. 2" X LAMINATED TO ENDWALL RAFTER WHERE 20 REWD - SEE CHAR E" ENDWALL RA SECTION A - A STANDARD ENDWALL RAFTER DETAILS n FTERn - SEE Cn HART V.Loi (G$, /Pre THE us �.. ..' -j OF .,. T416r 1.. !uti/ �C COPY�Cic�N pK Tp 11EPOC+t corrr.!:aHr vauno,a O rc n=waao ea euc tt 4k - Am RIF �y F1.8 EXPIRES 12 29 O9 ,,. - • �. PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS. FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS , Li CITY COPY THIS BUILDING SUBJECT, - -, TO FIELD INSPECTION CORRECTIONS. • � • � MPLIANCE , R!A EED FOR CODE -- SPOKANEVALLEY BUI / NG D ISION 0