HomeMy WebLinkAbout2009, 04-15 Permit App: 09000963 DeckSite Address: 1019 N PERRINE RD
Parcel Number: 4516t1204
Zoning: R-3 Water District: MODER
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509 0.0036
New project
Previous pre -app meeting 0
Plan revisions
Transmittal Date:
Wednesday, April 15, 2009
Applicant: HARPER, DUANE & MARIA
1019 N PERRINE RD
SPOKANE VALLEY, WA 99206
(509) 928-3980
e-mail:
Contact: HARPER, DU NE & M
1019 NPRINE RD
SPOKAVALLEY, WA
(509) • 8-3980
e-mail:
Contractor: 0
( ) -
Project Number: 09000963
er: HARPER, DUANE & MARIA
1019 N PERRINE RD
SPOKANE VALLEY, WA 99206
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project
Description: NEW 20 X 10 DECK
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
C
SITE PLA
PLAN
s
i
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
4,Valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
Spokane
Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
New Construction Accessory Bldg
Addition/Remodel 171 Deck
Other:
SITE ADDRESS: + 1 t q f) PEP- P' R-" i
ASSESSORS PARCEL NO: 115/ %61 , C Z.O 41 LEGAL DESCRIPTION: 11 / C7 i -#-V l j=Li) V4-Qf?J 5 /Y 0 1
Building Owner:
Name: b ) r ; 144_l2 P!
Address :/ 0 1 qi t E Rl >J
City: SRYA*)i- Vfr -EyState: _ Zip:��r�ci
Phone: „:2 - c3 �.D Fax:
Contact Person.
Name: Z. t )��Q- � � d Q -M Lfl-!?,f
Phone: 0/ g ��
Describe the scope of work in detail:
Contractor:.'
Name:
Address:
u
City:
State:
Zip:
Phone:
Fax:
Contractor Lic No: Exp Date:
City Business Lic. No:
Cost of Project: $ EYE)
• X bsn
Proposed Use:
**************The followin MUST be complete: (write N/A if not a **********************
pplicable)
HEIGHT TO PEAK:
g
DIMENSION 4..._#
OF STORIES;./�9--
TOTAL HABITABLE SPACE:
MAIN FLOOR TOS .
FTG:
/4
2IOUS FLOOR SQ. FTG:
4/4-
UNFIN BASEMENT SQ. FTG:
4`4/
IMPERVSURFACE
AREA:Xifr
FINISHED BASEM iN
SQ. FTG:�/
GARAGES . FTG:
/1)//�
CONSTR CTION TYPE:
balm o
DECK/COV. PATIO SQ. FTG:
V,-.070 Sc 7'
HEAT SOURCE:
/AL
30% SLOP S ON
TV: ii/4-
SEWER R SEPTIC?
# OF BEDROOMS: - „
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATUR
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
DATE: 11—/ '-" 0
❑ Mastercard ❑ VISA
Expires: VIN#:
PLANNING DEPT. APPROVED
BY: L6cti
Spokane
Val ley
Site Address: 1019 N PERRINE RD
Parcel Number: 45161.1204
Zoning: R-3
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
Previous pre -app meeting 0
Plan revisions fl
Transmittal Date:
Wednesday, April 15, 2009
Water District: MODERN
Project Number: 09000963
Applicant: HARPER, DUANE & MARIA
1019 N PERRINE RD
SPOKANE VALLEY, WA 99206
(509) 928-3980
e-mail:
Contact: HARPER, DUANE & MARIA
1019 N PERRINE RD
SPOKANE VALLEY, WA 99206
(509) 928-3980
e-mail:
Contractor: OWNER
( ) - 0
Owner: HARPER, DUANE & MARIA
1019 N PERRINE RD
SPOKANE VALLEY, WA 99206
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project
Description: NEW 20 X 10 DECK
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
C
SITE PLAN
J
Please send all plan review and project comments via e-mail to the
highlighted individuals.
ci„.F
Spokane
Valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
1
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
Spokane
jValley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: C�7
PERMIT FEE:
n New Construction n Accessory Bldg
.f1Addition/Remodel Deck
n Other:
SITE ADDRESS: t I.GI N PE* R-1 N
444) b
ASSESSORS PARCEL NO: /2 /& I , / 2_0 1 LEGAL DESCRIPTION: /i / v I-14) / at() 4e--2}_5 /', Q /
Building Owner:
1
Name: D Lt-!} 11.E r- �-; l4 jQ Pa P—
Address: % p/ `i M patep_i tj Ir
City: sit 1 auF: v&uEY State: Wim—, Zip:ITO
Phone: q ,z$- .3 Fax:
Contact Person II1J
Name: ..p 4.4-143F f? � � � ''� Q-1 � l fel 19 -Jr k.
Phone:
o/ 2 qg .-D
Describe the scope of work in detail:
Contractor:
DIMENSI%���
# OF STORIES,;r/ r�
TOTAL HABITABLE SPACE:
Name: � ( J.,
I
UNFIN BASEMENTJSQ. FTG:•
4'/
IMPERVIOUS SURFACE
AREA:& idy_
Address:
GARAGES . FTG:
/I� ,4-
DECK/COV. PATIO SQ. FTG:/
2 ScS
30% SLOP SON
= ' ' TY:�(%4-
City:
CONSTR CTIJ>ON TYPE:
�.vvz�
State:
Zip:
Phone:
Fax:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ 1, Dr,
QJ1/4,„ cD-0 X /i) sn
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: .
DIMENSI%���
# OF STORIES,;r/ r�
TOTAL HABITABLE SPACE:
MAIN FLOOR TO S .
FTG: iv/
2NU FLOOR Q. FTG:
%/�
UNFIN BASEMENTJSQ. FTG:•
4'/
IMPERVIOUS SURFACE
AREA:& idy_
FINISHED BASEM N
SQ. FTG: ,
GARAGES . FTG:
/I� ,4-
DECK/COV. PATIO SQ. FTG:/
2 ScS
30% SLOP SON
= ' ' TY:�(%4-
# OF BEDROOMS:
CONSTR CTIJ>ON TYPE:
�.vvz�
HEAT SOURCA/A
aSEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATUR
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE: Li--/ 7
❑ VISA
VIN#:
b
•
u.
c
:••
Th
a
DEDICATION
KNOW ALL MEN BY THESE PRESENTS that Robert P. Pielaet and Marino M. Pieloot, husband and wife, and
Vern Roberts,a stngle man,and Betty J. Roer
hn,o si giswanan, and Chanes J. Moore, a single man, have platted into lots,
(\
b ks and etrsefs fha IotM shown hereon to be known as "HIGHVIEW ACRES ADDITION, being a part of the
V � West 112 at Tract 46 of Opportunity In Section I6,I25N.,R.44EW M. in the County of Spokane and State of
Washington being more particularly described as follows:
y_ Commencing W the southwest corner of Tract 451 thence 5.89•4545'W., 326.95 feet along the South line of said
l Tract 46 to Me Point of Beginning fhence cantinuning along said South line of Tract 46, S.S9.45'45'W,261.52
feet,
the
Nor}h,25.00 feet 1 thence 5.89"45'45"W., 65.43 feet to a point on the West line of mold Tract 461
thence North,425.O0 feet along sold West It_ of Tract 461 manse N.S9•4545"E., 65.43 foot, throe North,
193.08 feet 1 thence N. 89-53'127E., 196.08 fee 1;'ban's South, 242.66 feet, tbencs N.BV4545'E.,65.44
feat; thence South , 400.00 fest to the Point of 8eginni ng.
The 5 foot wide utility easements are hereby reserved in the locations shown hereon.
The aforesaid individuals do hereby dedicate to Public use forever, the roads , as shown hereon.
A public water system, acceptable to County and State Health authorities will be made available for the plot and
Individual ...vice provided to each [at prior to the sale of to lot.
No more than one dwelling structure shall be plated on any lot, nor sholl any lot no further subdivided for the
purpose of creating additional lots or building sites without filing a ,.plot.
IN WITNESS WHEREOF , the aforesaid Individuals do hereby of their bonds this. AX day of�Li�,1971.
{_�aJP.f� nlYJi� `117- ,sett".
ROBERT PI LAST MARTHA M. PIELAET
CHARLES ,J. MOOR E. Qu,.,,,,,,,;,;.d• p [,vw
r.:z. ._ t •"">,,.-..-e- Q��_ � • �ir ,� n e-
VERN ROSERTS BETSY J. BES "T
LN
ACKNOWLEDGEMENT
STATE OF W INGTON'l SS
COUNTY OFT'eMArIF
On thie%".Lday of Slr7- 1971, before me personally appeared ISASELL DFSCHA Dwlo teethe power of attorney for Chocks 1. Moore's signature,knmm tame told
person who executed the within and foregoing Instrument and acknowledged the said instrument to be jhe free and
voluntary act ono deed of said person for the purposes and uses therein mentioned. Given under moM
seal the day and year loot above written. J�r
ter/ !/A/
Nola Ile d for the Sta o m -
ACKNOWLEDGEMEN
STATE OF WASHINGTON}SS
COUNTY OF SPOKANE
On this./Z day of jgept , 1971, before me personally appeared ROBERT P. PIELAET, MARTHA MPIELAET and
VERN ROBERTS, who has the power of attorney for BETTY J. ZINTS signature , known to me to be the persons
who executed the within and foregoing instrument and acknowledged the on. instrument 1 be the free and
voluntary act and deed of said persons nor the purposes and uses therstA mentioned. 6i n'under nand and
seal the day and year last above writtsn.
.%
NOM ubl,o m t7d ort ton uigtan
SURVEYOR'S CERTIFICATE
I, Willard D. Boatwright, a Registered Land Surveyor hereby certify that this plot represents a true copy of the official
records and survey made under my supervision in August, 1971, and that lot corners and monuments ban been set.
0. 90.77
HyY
Registered land Survey
nn,,
COUNTY
��ww•• ENGINEER
Examined and approved this.LLeday of_;!j27 `,1971.
S okane County Engineer
C MY ASSESSOR.
Examined and approved this 2.Z day of 1971.
`�'� tiluAxr �., �IAk� ,�
Spekana County A essor Deputy
COUNTY PLANNING COMMISSION
Examined and approved this27doy of 622' 1971.
✓��rfAe L �ktn6us,r�M•ny
Spokane County Planning Commisfion— Ctotrnon
COUNTY COMMISSIONERS
Examined and approved this -W day of > ,1971 .•
Spokane County Commissioners—Chairman
COUNTY TREASURER
I her by erilfy that the required taxes on the hereon platted land have been fully paid this Zlday
of , 1971.
H IGHViEW ACRES ADDITION 583941C
BEING A PART OF THE WEST V2 OF TRACT 46
OF OPPORTUNITY IN SECTION 16, T. 25 N., R.44 E.W. M.
SPOKANE COUNTY WASHINGTON
SEPTEMBER, 1971 SCALE:I%IOOt
LAND—MARK SURVEYORS
S. 726 LIBERTY DRIVE
LIBERTY LAKE, WASHINGTON
BEARING
IDISTANCE
NORTH
SOUTH I
EAST I WEST
S.89e45 1011.
261,52
1,083
261.518
NORTH
25.00
25.000
S. 89"45'45"W.
65.43
0.271
65.429
NORTH
425.00
425,000
N.89e45'45"E.
65.43
0.271
65.429
NORTH
193.08
193.080
N.S9"53'12"E.
196.08
0.388
196.080
SOUTH
242.66
242660
N.89°4545°E.
65,44
0.271
65.439
SOUTH
400.001
1400.000
TOTALS644.010
44.014
326948 326.947
TRACT
45
LEGEND
e Set Iron Pipe
• Found Pipe
Set Monument
,Sra y otic_
OCT29191} J•y9/n
vrta�. Las+P'iM+eo
j�'�O y4Pr�jria
gvr�iQy9
,es. s.
1 �L-.flT