Loading...
2005, 12-21 Permit: 05004699 ROWSOlane j�1alley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 4621 N PROGRESS RD Parcel Number: 45021.0617 Subdivision: Block: Lot: Zoning: AGR Owner: BLOCKER, R. R. & L Address: 4621 N PROGRESS RD SPOKANE VALLEY, WA 99216 Building Inspector: Water Dist: Project Number: 05004699 Inv: 1 Issue Date: 12/21/2005 Permit Use: ROAD OBSTRUCTION FOR INSTALLATION CABLE/CONDUIT/POLE Applicant: AVISTA UTILITIES 1411 E MISSION MSC -60 SPOKANE WA 99220 Contact: AVISTA UTILITIES 1411 E MISSION MSC -60 SPOKANE WA 99220 Phone: (509) 495-2244 Phone: (509) 495-2244 Setbacks - Front: Left: Right: Rear: Jurisdiction:: AVISTA UTILITIES Group Name: Project Name: Permits Right of Way Contractor: UNKNOWN License #: UNKNOWN OBSTRUCTION / INSPECTION 1 $70.00 FOR RIGHT OF WAY INSPECTIONS CALL (509) 869-5373 ENGINEERING Total Permit Fee: $70.00 Payment Summary Total Fees AmountPaid AmountOwing $70.00 $0.00 $70.00 Tran Date 12/21/2005 Processed By: JANSSEN, CHRISTINA Printed By: Main, Jodi L Page 1 of 1 Receipt # Payment Amt 3849 $0.00 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on-site septic systems. Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley Health Distnct 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456.8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date "\i„, *lane jUalley Call 24 hours before inspection required Phone 509.688-0195 Fax 509.688-0037 DEPARTMENT OF PUBLIC WORKS c Anticipated start date 12-19-05 Permit # Account # ROW CONSTRUCTION PERMIT LOCATION OF PROPERTY- N. 4621 Progress Rd (Address/Parcel #, if available) Applicant Name Avista Utilities Fax 534-2463 Address 1411 E. Mission Ave. Spokane, Wa. 99202 — Ann MSC 60 Phone 509-495-2244 Contractor's Name Address Phone Contractor's Reg.# Expires PROJECT DESCRIPTION (Provide site sketch or plan as necessary for clarity) Sewer Connection Curb & Gutter Cable/Conduit/Pole Water Installation/Repair Pavement Cut x Driveway Gas Installation/Repair Sidewalk Repair/Construction Other Dimensions Bond/insurance certification must be on file with the City. Bond # SPECIAL INSTRUCTIONS) Pole being replaced, no0 asphalt cut locate around pole w/ red paint. Job # 49117096 Loc tckt# 5414948 Permittee Signature_AKC Approved Date I hereby authorize the City of Spokane Valley to charge the fee for this permit to my credit card. Card # Expiration Date Name of Holder Signature Fees Paid$ 25.00 (Application) (Inspection) In addition to the permit application fee of $16.00 (utility) or $25.00 (construction), inspection on each permit will be billed to the permittee at a rate of $50.00 per hour with a $25.00 (1/2 hour) minimum. Permittee signature constitutes an agreement to these terms and provisions. Date !nit Work completed satisfactorily (Signed) Date Permit not valid until One -Call Notification Ticket # entered here PERMIT MUST BE KEPT ON SITE