Loading...
2012, 02-23 Permit App: BLD-2012-0017 Pole BldgSpokane Valleyw Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.orq RESIDENTIAL CONSTRUCTION PERMI NEW CONSTRUCTION C] DECK SITE ADDRESS: SZ 5— ASSESSORS ASSESSORS PARCEL NO.: fl ADDITION/REMODEL 0 OTHER Pry e_ss LEGAL DESCRIPTIO • (Staff UseROnly) PERMIT NUMBER: �le r 1 Z PERMIT FEE: APPLICATION CCESSORY BUILDING BUILDING OWNER NAME: l RECEIVES ---1 CSV PEHMIT CENTER 1 FEB 2 3 201 -IL- NAME: cc k YlnOI r, 5 Name_ � JUiinllttdj ;t. ADDRESS: - S JV , ?crag; c_53�` • CITY: V e; ; A„ 1+- PHONE: c .. y - 753'l STATE: L}Pr Zip: 0i 9037 FAX: CELL: y 5 3 - 7,2 / y CONTACT NAME: PHONE: f*j('—*—(——; R ea, A, f CONTRACTOR NAME: FAX: CELL: S7 - y 9S -) $g$ MAILING ADDRESS: I 3 0 y 6 ra.� CITY: Spokane ()cif ed STATE: i'uA ZIP: 9.92oq0 PHONE: ''75— /gg8 FAX: CELL: t/7.. —/ g g CONTRACTOR LICENSE No.: g E 07)- Cci-955D EXPIRES: Jig t/// CITY BUSINESS LICENSE NO.: 600,2 ys(c)a y DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: pole S+oraye ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: /618 ",- - Dimensions: VO X 30 No. of Stories: / Total Habitable Space: .--6- Main Floor SQ FT: Main / ,7Q 0 Upper Floor SQ FT: Pf Unfinished Basement SQ FT: .(� Finished Basement SQ FT: -0 Deck/Covered Patio SQ FT: Impervious Surface Area: /;00 30% Slopes on Property: _, No. of Bedrooms: Construction Type: pos-} Heat Source: . ewer or Septic: „pi TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature G---5. Date: ,„--,773 -/2— Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK ST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing ❑ Window and door location and sizes o Header, beam or concrete lintel sizes ❑ Window well locations if applicable o Brace wall panel locations o Room usage labels o Water heater and furnace locations ❑ Smoke detector locations o Exhaust fan locations ❑ Attic and crawl space access locations o Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details O Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location ❑ Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane Valleyffi Residential Driveway PAVING WAIVER Community Development — Planning Division 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720.5026 ♦ Fax: 509.688.0037 • planning@spokanevallev.org Spokane Valley Municipal Code (SVMC) Section 19.40.020.8; "All residential driveway and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use,. PART I — OWNER INFORMATION OWNER NAME: T N... Ly j L, Mu Aft i) PARCEL #: I/5/ yy, at f !2/i ADDRESS: 1C/, .525 ?re* 7,1L45, 2,i( CITY:Sr v b .. V 4 //4. 7 STATE(A) ZIP: f ----- //�� PHONE:g2 V-755.11 FAX: _ CELL: ' l-._ G 1.._ j VF E...o EMAIL CSV PF i.'It 1- r';-rvr PART II —DETAILS OF PAVING WAIVER _ FEB 2 3 2612 arr1. Do you have an existing garage for parking daily use vehicles? ❑ YE$�� r� �----_ 2. Is the proposed detached structure used for storage only? ®'YES r---- 3. Do you plan on using the detached structure to park vehicles? OYES ❑ NO If yes, then what type of vehicles? Z a -Kf 5\,.,,y) .L�w�J ►rtc f..4 4.,,1..-4,sK.,... .Pt„ 4. Do you plan to conduct a business from proposed detached structure? ❑ YES ONO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME5z»» owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. 1 further agree to report any change in these conditions to the Spokane Valley Community Development Department, Planning Division, within 30 days. Owner Signature Date PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS GRANTED AT S A.) Pr D C re ss 1e , , SAID ADDRESS FOR PERMIT #: j(D DO / 7 /_44z,tizz2, Planriil}E Division Staff Signature Date Created 6/27/11 Page 1 of 1 WAMBEKE ENGINEERING 2913 East 61st Court Daniel Wambeke, P. E. Spokane, WA 99223 Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com STRUCTURAL DESIGN DRAWINGS FOR 40' X 30' X 10'0" POST FRAME BUILDING FOR DICK MORRIS SPOKANE VALLEY, WASHINGTON JOB NO. BB-BRENT PREPARED FOR BUNKER STEEL BUILDINGS, INC. rREcEv:D ICSV PERMIT CENTER Project # 1Z012— Name SPOKANE, WASHINGTON February 21, 2012 ouumittci F Designer of Small Structures, Post Frame Buildings, Foundations, Light Gauge Steel Framing and Grain Storage Systems 1 td' ' TREATED POST LP.22 .60 RETENTION GRADE IT CONCRETE USE IN THIS ORDER 1.CENTRAL PREMIX 533-0208 2. SPOKANE ROCK PROD 244-5421 3. INTERSTATE 292-8600 4. TONERS 292-2360 d D � 1 2 Q a c 0 N c R E T E SEE BELOW POST FOOTING SCHEDULE d LOCATION POST SIZE DIAMETER DEPTH YDS. PER TOTAL 6JJ �? i !SII oktkt r 5 Lx L 11.. -a-5 PAGE 2 Not -r. sc le 5 a.� Roll; „Q : a9 GA. S}«c , fiver 77, osg4 34# Fejt RooFTNG, A S.rp ENIG ,Dq 6A. Sita Fas}gr•eD ��a .4=4 L' St '14 Pre ,rec TrUSS Sec Cy^csine,v.rirc tCsr cJAr�� We bbi ch.. -1-a ,L �x C1 PVriin3 Y.+, 0 r io Co"cro4c Fi•.r Top c(^orN 4b post: 1 Boli + Cy- Ib S I.,3a 45 4,. es c3oi+-. .-I Nr 1 St,ni.J Bloc,k fo Pos4; 24bat -ti4 &o14 i^:s et...0k. u';rL i L. k� ; (1. --?.) 1 a .x 10p. P s 1 PP„5i: Lrc Tr.ozi-j R.„41 .4. R r+i Q.:, Base.(7oarc r io Co"cro4c Fi•.r v s.0 t\j' • c>.(Z Li 2 ;`,„ , ' —rt t ,..s*T .1., , 1/4 r 2.„,tL TRk • 10 ,,, ^•••• •••>. t. *.• 4, lot r • C • ,. t 4 ; t t', e..4 Li Sec THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS CITY COPY • 3 PLANNING DEPT. APPROVED By. 764 Tha 444 * 7MJT U.) Lc. SDt an—'! A CO ,r2( TifEL j LA_ LEIF - Sew e (2- 4 WoAe 0 YV-t. Zczt- Ce-CL B TREATED POST 16d GALV NAILS '11 2'. X 6° 'GIRT (FLAT) TYPICAL: GIRT CONNECTION NOTES FOR FLOOR PLAN INTERIOR FRAME WOOD POSTS, SEE . POST SCHEDULE THIS 'SHEET C) GABLE WALL POSTS - 6' X 6' TYPICAL:' DOOR POSTS..- 4' X 6' TYPICAL FOOTING DIMENSIONS, B = 1'-8'1 D = 3'-0' MAXIMUM POST SPACING 12' 0'. PURLINS @ 24'. O.C., BEARING OR JOIST HANGERS (TYPICAL) 0 b •0 O 5•' i 0 W 1 V) X Nu t NcU ' SPANS 12' TO 60' DOUBLE TRUSSES DOUBLE_TRUSSES SINGLE TRUSS 4 EACH GIRT co PLAN VIEW NTS. -6 --5 PURLIN CONNECTION, METHODS: A), PURLINS MAY BE HUNG OFF THE. TRUSS TOP CHORD FACES W/ STD. SIMPSON JOIST HANGERS OR EQUAL. PURLINS MAY' BE BUTTED AND NAILED W/C2) 16d NAILS INTO EACH PURLIN. PURLINS MAY BE LAPPED AND NAILED W/(3) 16dNAILS, ON CONNECTION METHODS "B° AND 'C", TOENAIL BACK SIDE SF PURLIN W/ CD 1601 NAIL 'INTO EACH TOP CHORD MEMBER. NOTES FOR CONNECTION DETAIL S1 MANUFACTURED TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER 0 PURLIN SUPPORT STRUT 2' X 6' X FULL NDEPTH OF TPAIL PURLINS W/(3)CHORD / 3))D16d UNA PURLIN. PURLIN CD NAIL STRUT TO TOP CHORD W/(3) 16c1 pier Hap N4ECTI!N S3 NAILS EACH SIDE. . S NOTES FOR SECTION A -A S1 TYPICAL PURLIN, SEE FLOOR PLAN FOR SIZE co TRUSS DESIGN BY OTHERS 0 2' X 6' @ 24' O.C., 10' BAYS 2' X 6' @ 24' O,C., 12' BAYS DF -L #2 GIRTS FLAT @ 24' O, C. S4 CONCRETE. FOOTING, SEE SCHEDULE SSEXTEND POST TO TOP OF PURLIN 'ROOF FASTENED TO PURLINS WITH 1 1/2' LONG WOODFAST TEKS, WALLS FASTENED TO GIRTS WITH 1' LONG WOODFAST TEKS. SEE. FOOTING DETAIL BO BUILDING SECTION A -A N.T.S. 121'N/ a Si1 11®1 1�1����� 1 �I 111 20' 0' MAXIMUM 1 • .SINGLE OVERHEAD DDDR• OPTION FRONT ELE'VATIO.N 1 1 N.T.S. NOTES FOR FRONT ELEVATION S1 HALF TRUSS DESIGN BY TRUSS MANUFACTURER SUPPORT PURLINS @'END TRUSS W/2'.X 6' 0 TREATED 2° X 6' BOTTOM GIRT S2 2'.X 10° HEADER S3 2' X 6' GIRTS @ 24'' D.C,, 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' O;C., 12' BAYS, DF -L #2 0 2' X 8' FACIA BOARDS 0 TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2° X 6° BOTTOM GIRT OR TREATED 2' X 10° BOTTOM GIRT S4 MANUFACTURED TRUSS - NAIL TO EACH SIDE OF POST WITH 4 - 16d NAILS ON TOP NAILING BLOCK 0 WOOD POST, SEE POST/FOOTING SCHEDULE.' 0 4 - 10d NAILS SOLID BLOCKING AT CONNECTION POINTS, _ TYP. PURLIN, SEE FLOOR PLAN FOR SIZE' S9 2' X 6' OR 2' X 8' EAVE GIRT 10 KNEE BRACE, IF REQ'D. SEE POST SCHEDULE AND DETAIL 2 11 2' X 6' X 24' OR 2' X 8' X 24' BLOCK. 10 1 - 3/4' 0 MACHINE BOLT THRU TRUSS T. CHORD I - 3/4' 0 MACHINE BOLT THRU KNEE BRACE 1 - 3/4' 0 MACHINE BOLT THRU BOLTING BLOCK 2 - 3/4' 0 M. BOLT @ BOLTING BLOCK - 24' & 30' 3 -.3/4' 0 M. BOLT @ BOLTING BLOCK - 36' & 40' 4 - 3/4' 0 M. BOLT @ BOLTING BLOCK - 50' 5 - 3/4' 0 M. BOLT @ BOLTING BLOCK - 60' 0 4 - 16d NAILS DETAIL 1 TRUSS CONNECTION, PURLIN COLUMN SUPPORT N.T.S. SINGLE SLIDING DOOR OPTION_` . OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR DETAIL 2- KNEEBRACE Sl TRUSS TOP CHORD, DESIGN BY OTHERS S2 TRUSS BOTTOM CHORD, DESIGN BY OTHERS S3 2° X 6' DF -L #2 EACH SIDE S4 WOOD POST, SEE POST/FOOTING SCHEDULE. - S5 4 - 16d GAL V. NAILS, EACH SIDE 1). KNEE BRACE REQUIRED WHERE SHOWN ON POST/FOOTING SCHEDULE,- BRACE NOT REQUIRED AT GABLE END TRUSSES, 2). ALTERNATE KNEE BRACE/POST AND TRUSS/POST CONNECTION = USE 3/4'0 THRU BOLTS, EACH LOCATION. KNEE BRACE N.T.S. BUILDING SPECIFICATIONS: ' GENERAL - ALL. BUILDING STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS MAND PLANS TO THE �ARE 09 E INTENDED FOR USE RINA30 PSF LIVE LOAD, 085 MPH WIND SPEED, LL EXPOSURE B AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL= 30 0PPSF SF OOFINGF Ap LOAD = 5 PSF PSF° CEI° ROOF 01 ALLOWS FOR MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. - * MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF. MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER PER IBC . TABLE 1806.2. LESSER SOIL CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. - CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH f'c = 2,000 pal, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION WOOD - STRUCTURAL CONFORM DF -L EELGRADING MOISTURE BE BY SHALL CONFORM TO ACI 318-08. WEIGHT. NAILING SHALL CONFORM TO TABLE 23091FASTN NG SCOR HEDULE & OTHER APPROPRIATE SECTIONS OFCHAPTER 23 OOR F THE IBCAlt. NAILS INTO PRESATIVOLD TREATED WOOD SHALL TO THEE REQUIREMENTSZINC COATED OF AWPA STANDARDS?C-16, C-22ED STEEL , C-23, C-24 & C-28. NE BRONZE. RPOSTSTFORESti STEEL. CCA TREATED WO OR BUILDINGSADINGRULES. A W RE SHALL BEHSIMPSON OR APPROVED MATERIALS EQUAL. ALL BOLTS HEM -FIR SHALL CONFORM TOEASTMUA307MENSION AND GRADED BY WWPA METAHARDWARE METALPANELS PANELS MAY BE DELTA RIB TOLPURLINSAW THOOR PLATED'NGASKETEDD1U1/2"1LONG ASTM FASTENERS. QUALITY PANELS F HALL BE= 80.0 kst. ROOFST PANELS SHALL T FASTENED FASTENED TO GIRTS WITH PLATED, BASKETED 1" OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. PLYWOOD OR OTHER ALTERNATE ROOFING LEO 0N6 .C.APPLICATIONSW - BUILDING NAILS. FINISH COVERING FORETED SHEETED ROOF MAYOBE COMPOSITIONXROO NG OVER 30# FELT, RATEDRSHEETING, NAILED 6" 0. C. W# OR tIL OR 29 GAUGE METAL ROOFING OVER 15# FELT. BUILDING MAY BE SIDED WITH 7/16" O.S.B. BOARD, 1/2" C -DX PLYWOOD, 15/32" T-111 PLYWOOD SIDING OR HARDI-PLANK. LAP SIDING MAY BE INTAL. STEEL STAPES 0 SRAP 0. CD 0 WALL PANELHEETING. EDGES &H ETING SHALL ATE FRAMING. FASTENED TO GIRTS WITHOMP Bd, NAILS 0 B6"A K C., ORI 1/2" ELONG X 16 SOIL COMPACTION ALL- BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. - TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IN THE STATE OF WASHINGTON. TRUSS LOADING: TOP CHORD LIVE LOAD = 30 PSF' - TOP CHORD DEAD LOAD = 5 PSF BOTTOM CHORD DEAD LOAD = 1 PSF ' 1601 NAILS 6", 8 OR 10" POST OJ DOUBLE OVERHEAD DOOR OPTION' OPTIONAL FRONT ELEVATION 12 ALTERNATE TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES NOTES FOR TRUSS WEB BRACING: - TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER THE METHOD OF TRUSS WEB. BRACING SHOWN ABOVE FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER 10d NAILS @ 6' O.C, Lp BRACE L BRACE • NAILING PATTERN FOR POST LAMINATIONS NOTE: 2" X 6"LAMINATE. MUST BE A TREATED MEMBER AND MUST EXTEND TO THE BOTTOM OF THE FOOTING. LAMINATE MAY BE SPLICED ABOVE MID HEIGHT OF COLUMN NOTES FOR FOOTING DETAIL TREATED POSTS AS SIZED PER SCHEDULE VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING Q UNDISTURBED SOIL_ 3068 MANDOOR OPTION j OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR OPTIONAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY TRUSS MANUFACTURER. S2 2' X 10' HEADER UP TO 12' 0' DOORS 2' X 12' HEADER UP TO 20' 0' DOORS S3 2' X 6' HEADER S4 4' X 6' DOOR POST = 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST.- 16' & 18' WALL HEIGHT W/ 2' X 8' FACER. S6 2' X 4° WINDOW JAMB FOOTING DETAIL N.T.S. - 1601 NAILS GABLE END TRUSS ° ° BOLT'ING.BLOCK 2' X 6° X 18' BOLTING BLOCK DETAIL 3 TYP, GABLE END TRUSS CONNECTION . USE BOLTING BL ALL CORNER COLUMN GIRCKS T 8 --1601 NAILS CORNER POST 1601 NAILS OPENING POST/FOOTING SCHEDULE 12' - 24' SPANS, 30 PSF LIVE LOAD 1 KNEE BRACE POST COLUMN FOOTING SPACING "H" WXD "B" DIA. REQUIRED CONCRETE VOLUME,Y03 NO NO NO ' NO _NO NO _ -..-NO NO NO NO NO NO NO NO NO NO NO YES 10'4" 8'A" 6" X 6" . 21" 3'4" 10'0" 10'4" 6" X 6" 21" 3''-0" 1014" 12'4" 6" X 6" . 21" 3'4" . 10'4" 14'4" 6" X 6" W/2' X 6" 22" 3'4"' • 10'-0" -16'•O" 6" X 8" 22" 3'4" _10'4" 18'4" 6" X 8" W/2" X 6" 22"_ 3'4' 1074" 20'•0" i9 -56P7777--777 -'22' 3 3" 10'41" 22'-0" 6" X 10" WZ' X 6" 22"3.8' 10'4" 21'4" 6" X 10" W/2" X 6" 22 . 44' 12-0" 8'-0" 6" X 6" 24: % 44" 12-0" 10'4" 6" X 6" 24.1.,34' 12-0" 1214" 6" X 6" WIZ' X 6" 24' 3'4" 12-0" 14-0" 6"X6"WIZ' X6" 24'1 3"O" 12-0" 16'4" 6" X 8" WIZ' X 6" 24' 3'4" 12-0" 18'4' 6" X 8" W/T' X 6" 24" 3'•2" _ 12'4' 20'4" 6" X 10" W/2" X 6" 24" 3'.6" _12'•O" 22"O" 6" X 10" W/2" X 6" 24' 3"9" 12"O" -24.0' 6" X 12" W/2"X 6" 24:- 4'-1" 0.27 0.27 0.27 0.30- 0.30 0.30 -0.32...--. 0.36 0.38 0.36 0.36 0.36 0.36= 0.36 0.37 0.41 15.44 -0.48 POST/FOOTING SCHEDULE 30' SPANS, 30 PSF LIVE LOAD 12'4' -14.0; POST COLUMN - FOOTING KNEE BRACE CONCRETE SPACING "If' WXD . "B" DIA. '1" REQUIRED' VOLUME, YD3 10"O" 10'-0" 8'-0" 10'•0" 6" X 6" 24" 3'4" NO 0.35 6" X 6" 24 3'4" NO - .. 0.36_ 0.36 10'4" 1T•0" 6" X 6" W/T' X 6" 24" 3'4" NO 10'4" 10,;x,. 10'4' 14'4" 16,44' 16'•0" 6" X 6" W/T' X 6"- 6" X66 el; X6"W/2"X6--24- 24" 24,E 24" 3'4-' 3,;0.- 8'-O" 33'-T' .-NO NO 0.36_ 0.36_ -6.5E- -NQ NO_ le-o" .20'-0" 6" X 10" 0.37 10'4" -70'•0,.- 2T-0" '-24'4' 6" X 10" W/2" X 6" 6„ X 12" - -----W-7-3'-10" 24' 3'4" 140_ NO _ 0.4;1-. -0.46 124" 8'4' 6" X 6" 26" 3'-0" 3'4' 3'4" 3'-0" _ NO - NO NO NO 0.41 124" 10'4' 6" X 6" 26" 0.41 .0.41 41 124" 12'4' 6" X 6" W/2" X 6" 26" . 26" 12-0" 14'-0" 6" X 8" 12-0" 16'4" 6" X 8" W/2" X 6" 26" 3'-0" NO 10 -7940 ' ' NO _0.41 0._41_ 0.46 .48 0.46-- 12-0" 18'4" 6" X 10" 26" 26" 3'-0" 3'3" 3'-0" 31-8" 12-0" 20'4' 6" X 10" W/2" X 6" 12-0" 12-0" 12-0" 22'-0" 24'4' 6" X712" • 6" X 12" W/2" X 6" 27' 2T' --.-YES 0.60 POST/FOOTING SCHEDULE 36' SPANS, 30 PSF LIVE LOAD KNEE BRACE POST COLUMN FOOTING SPACING WXD "B" DIA. '1" REQUIRED CONCRETE VOLUME, YD3 10'4' 10'$' 10'3 10'O"V 10"o" 10.;6,._' 10'•0" _ 10'4' 8'4" 10'-0" 12'•0' 14.0" 16'•0" 18'4" 20'4' 22'4' 2a,4" 6" X 6" 6" X 6" 61X6"W/7'X61 6"X6"W/2" X 6" 6"X88 6" X 8"W_/2_" X _6" __ 6"X10" - 6"X10"W/2"X 6" 6"X10"W/2" X6" 26" 26" -26"- 26" - 26" 26" 26" - 26" 26" 3'4" 3.-0" 3.4' 3'-0" 3'4" 3.•a:" 3'3" 3,4, NO ' NO NO NO NO NO NO NOYES 0.41 0.41 0.41 _ 0.41. ' 0.41 0.00 0.41 0.42 0.60 BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS AS i�� REPLACES 1' X 4' OR 2' X 4' WEB MEMBER BRACING BRACING TO REPLACE 'RAT -RUN' WEB Od NAILS 2 6' ac, X 10" _ X 6' TRUSS WEB MEMBER TRUSS WEB MEMBER •: SECTION B -B SECTION B -B AT INTERIOR TRUSSES AT GABLE END TRUSS S1 - S3 ea �. TYPICAL TRUSS BOTTOM CHORD BRACING N.T.S. NOTES FOR TRUSS BOTTOM CHORD BRACING SS GABLE, END TRUSS S2 DOUBLE INTERIOR TRUSSES S3 GABLE END POST S4 2° X 4' BOTTOM CHORD BRACING 2 10' 0' O,C. S5 NAILS 3TO BOT TOM ' BLOCK ICHORD BRACE • SHEATHING' REQUIRMENTS THE • ROOFFLSTEEL' WING2INIMUM GAUGEROOF GRANDIRIBRAGM III, 36'REQUIREMENTS R EQUIVALENT • FIELD SCREWS' 4110 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) m EAVE AND RIDGE PURLIN SCREWS' 414 xl 1/2' AT BOTH SIDES OF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED' ▪ ENDWALL STEEL' 29 GAUGE GRAND -RIB 111, 36' WIDTH OR EQUIVALENT • FIELD SCREWS, 410 x 1 1/2' 9 9' O.C. (NEXT TO HIGH RIB) NI BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS' 814 x 1 1/2' 9 BOTH SIDES OF EACH MAJOR RIB.' DIAPHRAGM SCREWS DIAPHRAGM SCREWS 9 ENDWALL BASE GIRT ACROSS ENDWALL DOOR HEADERS & GAGE. END TRUSS TOP CHORD, • EAVE & RIDGE PURLINS ON ROOF • DIAPHRAGM SCREWS; TYPICAL SCREW PATTERN, EXCEPT AS NOTED ABOVE STEEL SHEETING SCREW PATTERNS' N.T.S NOTE:` THESE PLANS DO NOT ADDRESS•. OPEN' (CANOPY) BUILDINGS. OTHER VARIATIONS. FROM THE PLANS (ROOF PITCH, LARGER OPENINGS, MULTIPLE BUILDINGS, ETC. WILL. REQUIRE ACTION BY THE ENGINEER. II 12-0" 814" 6" X 6" 28" 3'-0" 0.48 8" 3'-0" 0.48 124' -Tier 12'4' -14.0; 6"X 6".W/T' X 6"'- 6" X 8 ._-_�. -'-'28" 28"..-&----01r-NO-- 3'•O". -.._-NO -'-0.48 - 0.46 ._ 12.0"'-- 12-0" -16'4' 18'-0" 6" X 8" W12" X 6"- 6" X 10" -- 28" 28" 3'4" 3'-0" NO NO - 0.48 - �•' ii ....---"--' 12-0" "' 20'4" "-X'-- 6" X 10" W/2" X 6" 30" 3'.-..__ 3'-2" NO 0.68 12-0" 22'4" 6" X 12" 30" 3'-6" NO 0.64 12-0" 24-0" 6" X 12" W/2" X 6" 30" 3'-9" NO . 0.69 POST/FOOTING SCHEDULE40' SPANS, 30 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "H" . W X D "3" DIA. "1" . REQUIRED VOLUME, YD3 10'4' 8'4' 6" X 6" 2T 3'4' NO 0.44 10'4" 10'4' 6" X 6" 27" 3'•O" - NO 0.444 10'4" 1T-0" 6" X.6" W/2" X 6" 27' _ 3'4' NO 0.44 _ 14'3'' 6"X6"W%2"X6"- -2T' 3'4'NO 0.44_ _40,41" 10'4" 16"O"' 6;X0" 27" 3'4' YES 0.44 ---- 10'41" -16'-- 16'-0" 6" -. - 6" X 8" WIT' X 6" � 27" 3'-0" - NO � 0•'1'1 10'4' 18'4' 6" X 8" W/2" X 6" 27" 3'-0" - NO 0.7147- .44 10'•O" 10'4" 2014" 6" X 10" W/2" X 6" 27" 3'-0" NO 0•'14 10'-0" 22'-0" PR -Wilier X 6" 28" 3'•2" NO 10'4" 24'-0" 6" X 12" 28" 3'4" YES 0.66 , 124;, 8'4" 6" X 6" 30" 3'4' NO 0.66 . 12-0" 10'4" 6" X 6" 30" 3'4' - NO 0.66 12-0" _.._•170 `- 1Z-0" -14•0 6" X 6" W/2" X 6" Cr X8"= -C- ,. 30" 3G„ 3'4" 3'4" NO 0.66 v.oa 1'iO -15.6i-7- 12-0" 16'-0" 6" X 8" W/T' X 6" 30" 3'4" NO • 0.66 _ 124_'. _124", 17-01 - -12.0" - _ 18'4" 20'4' 22'4" 6" X 10" 6" X T6 -97C /2" R19 6" X 12" • 30" -'30"-.. 30" 3'-0" 3'-2" .-1-49- _3'-8"- NO •_0.66 NO -.._0.68_ - Np 0.61 12.0- 24.0" s9 3 -c 12" W/2" X 6" -'30" - - . NO - - 0.67 POST/FOOTING SCHEDULE 48' TO 6T SPANS, POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING 10'4" 10'4" 10'4" 10'•0"' 10'4' _10'4" - 10'-0'' 10'4' 124" 124"` 124' 12.0' 124' _ 124" 124- 12.0" 12.0'_ 8'-0" 10'4" 1T-0" 14,4,. 16'4'' 18'4" 20'4' ft -cif 24'4' 8'•0" 12' O 14'•0 16'4" 18'4" 20'•0 224'' 244" WXD 6" X 6" 6" X 6" 6" X 6" W/Z' X 6" 6"X6" 6"X8"Wit X6"" 6"X8" W/Z'X6" 6"X10"W12"X6" 6"X12"WWII; 6" X 6" 6"X6"W12'X6" 6"X 6" N112" X 6"y 61X8"W/2'X6" 6"X8" W/T'X6" 6"X10"W/2"X6'' 6"X10"W/2"X 6" 6"X12'W/2'X6': 6"X12"W/2"X61 "B" DIA. 30" 30" 30" 30" 30" 30" 30" 30" 32" _33" 33" 33" 33" 3.4" 3'4" 3,4" 3'-0" 3'4" _P.19* 3'•2" 3.4., 3,4' 3,4 3'4" 3'4_' REQUIRED NO NO No 115-- NO NO NES- _ .. NO NO NO• NO NO NO NO NO N0 NO VOLUME, YD3 0.66 0.66 0.66_ 0.66 0.66 0.66 0.66 _ -0.68 - 0.68 0.66 _0.66 0.66 0.66 0.66 . _ 0.66 0.66'• : 0.70 0.77 33" 3'4" 3'•6" POST/FOOTING SCHEDULE 64' TO 60' SPANS, 30 PSF LIVE LOAD POST COLUMN • FOOTING KNEE BRACE SPACING WXD . "B" DIA. '1" REQUIRED. CONCRETE VOLUME, YD3 10'4" 10'4' 10'4' 10'4' 10'3" _ 10'4" 10'-0" 10'41" 8'4" 10'4' 12.4 14'4' 16'6'-0" 18'4" 20'4" 22-0" 24'•O" 6"X6" 6"X 6" 6" X 6"W/2" X 6" 6" X 8" 61X6"W17'X6" 6" X 10" 6"X10"W/2"X 6" 6"X10"VV%2" X 6" 6" X 12" 33" 33" 33" 33" 33" 3'4" 3,-0" 3,4,r NO NO NO NO P NO YES NO ' YES 33" 33" 33" 33" 3.47 3.4' 3,4' 3'-0" 3'4" 124" 12.0 124" 120" 12-0" _12-0"_ 123" 124''- - 12.0" -• 8'4" 10'4' 12'-0" 140'' 16'4" 18'4" 20'4' 22,3"_ 24'4" 6" X 6" 6"X 6''W/2X6 6"X6" WIZ'X6' X8"W17'X6" 6" X 8" WIZ' X 6" 6"X10"W/2"X61 6"XWar X6" 6" X12"W/2"X6" 6"X12'W12''X 6" 36" 36" 36" 36" 36" 36" 36" 36" 36" 3'4" 3,-0" _ 3'4" 11:59- 3,-0" 3'4" 3'0" 3,•2" 3.4" NO NO NO V16 - NO YES NO _ YES NO 0.66 0.66 0.66 0.66 0,66 0.66 0.66 0.66 0.70 0.79 0.79 0,79 0.79 _ 0.79 0.79 0.79 0.83 -- 0.88 NOTE: 1. THE NEXT LARGER SIZE POST MAY BE SUBSTITUTED FOR POSTS WITH 2" X 6" LAMINATIONS. 2. ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR #2 TREATED POSTS UP TO 16'-0" WALL HEIGHT. ABOVE 16' WALL HEIGHT, ENDWALL POSTS SHALL BE 6" X 8" ROUGH CUT HEM -FIR #2 POSTS. 3. FOOTINGS FOR ENDWALL POSTS SHALL BE A MINIMUM OF 20"0 X 3'-0" DEEP FOR WALL HEIGHTS TO 16'-0". ABOVE 16' WALL HEIGHT, FOOTINGS SHALL BE 24"0 X 3'-4" DEEP. 4. ABOVE FOOTING DESIGNS. ARE FOR POST FRAME BUILDINGS WITH CONCRETE FLOORS (CONSTRAINED POSTS). IF BUILDINGS WILL NOT HAVE CONCRETE FLOORS, INCREASE FOOTING DIAMETER X 2" & FOOT NG . DEPTH X 4". OVERHEAD DOOR OPENING SLIDING DOOR OPENING Suomi iifm'e r viii %ilii ata e/iiia% r �-'ir/ ' % ///% �\i///'�%-,� ,j% SPLIT SLIDER DOOR OPTION OPTIONAL FRONT ELEVATION TYPICAL SIDE ELEVATION N.T.S._ NOTES FOR SIDE ELEVATION Sl 2' X 8' HEADER S2 2' X 10' HEADER FOR 10' & 12' SLI D ING S 2° X 8' HEADER FOR 8' g• SMALLER SLIDING NRDOORS ®S',SPOKAN WAMBEKE 1: DATE DESCRIPTION. OF CHANGE PROJECT N0.