2015, 05-19 Permit: ROW-2015-0261 ROW City of Spokane Valley
QT1a� Community Development
11707 E. Sprague Ave., Suite 108
Spokane Valley, WA 99206
(509) 720-5240
permitcenter(c�spokanevalley.org
ROW-2015-0261 DE-ROW
PROJECT NAME: ISSUED: 05/19/2015
SITE ADDRESS: 12122 E PORTLAND AVE SPOKANE VALLEY EXPIRES:
PROJECT DESCRIPTION: FROM PHONE BOX ON HOUSE TO PED#1214 ACROSS ROAD-SDC WILL BORE ROAD
PARCEL: 45044.0510
APPLICANT: SPOKANE DITCH&CABLE OWNER: SPOKANE DITCH&CABLE
PO BOX 6219 SPOKANE,WA99217 PO BOX 6219
509-483-1272 SPOKANE,WA 99217
509-483-1272
GENERAL CONTRACTOR: SPOKANE DITCH&CABLE License: SPOKADC099LC
PO BOX 6219 Expires: 07/17/2015
SPOKANE,WA 99217
509-483-1272
FEES: Paid Due
Right of Way $110.00 $0.00
Totals : $110.00 $0.00
CONDITIONS
* Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100
feet of permitted work, as per RCW 19.122.033.
* For work blocking less than 50% of a local access street the contractor, at a minimum, is required to have Construction
Ahead signs placed ahead of the work zone. Note—if it turns out that the work blocks more than 50% of a local access
street then this permit is not valid and the contractor must submit a traffic control plan to the City for review/acceptance prior
to continuance of the work.All traffic control shall follow MUTCD standards.
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit
applicant, by definition, is the property owner or an authorized agent of the property owner. It is the
responsibility of the applicant/ permittee that the use described on the front of this permit complies with
applicable codes and that required inspections are requested. Failure to request inspections as listed
below and obtain the necessary approvals before progressing beyond the point where inspections are
required and may necessitate removal of certain parts of the construction are the applicant's/ permittee's
or property owner's expense.
Owner/Agent Date:
Staff Approval Date:
Printed by:Patrick Barclay on:05/19/2015 12:56 PM
Page 1 of 1