2012, 05-29 Permit: SW-12001433 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001433 05/29/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: CYCLOPS PIPE SERVICES, LLC. Project Name: GRANDVIEW ACRES Applicant: CYCLOPS PIPE SERVICES, LLC. Permit Type: SEWER Address: P.O. BOX 700 NINE MILE FALLS,WA 99026 Phone: 509-413-9529 Email: SITE INFORMATION: Site Address: 12124 E PORTLAND AVE Owner: KING, MARTY R&WENDY Parcel Number: 45044.0509 Address: 12124 E PORTLAND AVE SPOKANE VALLEY,WA 99206 Subdivision: GRANDVIEW ACRES Phone: FIRST ADDITION Assessor's Description: GRANDVIEW AC 1ST PT OF L3 B8 ELY 68.53FT Email: OF NLY 150FT Inspection Area: Water District: Irvin Fire District: Fire District 1 Water District#6 Zoning: Land Area:0.236 acres/10279 sgft CONTRACTOR INFORMATION: General Contractor CYCLOPS924K9 CYCLOPS PIPE SERVICES, LLC. P.O. BOX 700 NINE MILE FALLS,WA 99026 509-413-9529 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:05/29/2012 10:46:54 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001433 05/29/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:05/29/2012 10:46:54 Printed by: IIS APPPOOL\ASP.NET v4.0