2010, 08-24 Permit App: 10002557 AdditionProject Number: 10002557 Inv: 1
Application Date: 8/24/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information: MI. M,
Permit Use: RESIDENCE ADDITION Contact: HAMLIN CONST & REMODELING INC
Address: 603E 19TH
C - S - Z: SPOKANE WA 99206
Setbacks: Front Left: Right: Rear: Phone: (509) 951-1885
Group Name:
Project Name.
Site Information: . .� m �:;;� ,�: �
District: Sout
plat Kev: 000000 Name: Range
Parcel Number: 45213.9169 Block:
SiteAddress: 1219 S PIERCE RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 007 MODEL
Area: .36 Acres Width: 0
Nbr of Bldgs: 2 Nbr of Dwellings: 1
Review Information: .:
Review
Lot:
Owner: Name: ROSENBERG, MIKE
Address: 1219 S PIERCE RD
SPOKANE VALLEY, WA 99206
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Building Plan Review I Released By: I
Originally Released: 8/24/2010 By: JAGRISSO
Landuse/Zoning/HE Conditions Released By:
Originally Released: 8/19/2010 By: mharnois
Permits: 4_. 4P .. ,
Operator: jmm Printed By: JD Print Date: 8/24/2010
Project Number: 10002557 Inv: 1
Application Date: 8/24/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: HAMLIN CONST &
Address: 603 E 19TH AVE
SPOKANE, WA 99203
Description Grp Type Notes
RES ADD R-3 VB
Building Permit
Firm: HAMLIN CONST & REMODELING
Phone: (509) 624-5179
This Application:
SQ Ft Valuation
320 $31,664.00
Totals: 320 $31,664.00
Item Description Units Unit Desc
RESIDENTIAL PERMIT FEE 1 SELECT
WSBCC SURCHARGE 1 SELECT
SF PLNS RVW < 7999 SQ FT 1 SELECT
Notes:
Total Project:
Sq Ft Valuation
320 $31,664.00
320 $31,664.00
Fee Amount
$461.95
$4.50
$184.78
Permit Total Fees: $651.23
Payment Summary'
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $651.23 $651.23 $184.78 $466.45
$651.23 $651.23 $184.78 $466.45
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and rinds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 8/24/2010
(Staff Use Only)
S"T'okane
PERMIT NUMBER'
Valley PERMIT FEE'
..;0oO
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter(cspokanevalley.or4
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ADDITION/ REMODEL ❑ ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS /419 A
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION.
....:■ mtu#% nuilUCn WARAC-
NAME:
ADDRESS
Cm:
STATE:
zip: 494.0
Zsz
PHONE CELL: FAX' 9�/
CONTACT NAME'
PHONE FAX' CELL: 96-1-_5"76;L
CONTRACTOR NAME: I-IAyy 414 1 66/L)5-22067/
MAILING ADDRESS �(� �� 194 A)C
Cm: "`�/Jo9&2 E
PHONE' �j / FAX: r�
CONTRACTOR LICENSE NO.: f��/j� Ll CK 9Z 1 Aj EXPIRES:
STATE: W olr
ZIP:
3 CELL:
CITY BUSINESS LICENSE NO.:
DES IBE TH SCOPE OF WORK IN DETAIL AND INDICATE USE:
Q o i
1414
PROPOSED USE:
Effective October 28, 2007 Page 1 of 2
C:\Users\Tim\Downloads\Residential Construction Permit App.i.doc
Height to Peak:
1,71
Main Floor S�
FT: Sw �p
Garage SQ FT
No. of
Bedrooms: ,
YOU MUST COMPLETE THE FOLLOWING****
-- -- --me V&�AQI C
Dimensions:
ter x 3!1,
Upper FI or SQ
FT: ti" la-
Deck/Cover%
SQ FT: A% Ar
Construction
Type: JVA
No. of Stories:
Unfinished Basement
SQ FT: AJ /Z
Patio Impervious Surface
Area: A) �--
Heat Source:
TOTAL COST OF PROJECT: $ '96 f 660 el T 7,',4
Total Habitable
Space: 3 Zo
Finished Basement
SQ FT:
30% Slopes on
Property:
Sewer or Septic:
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
reformation Valley
maypermit
be rquire�dnot
to bepermit
b or approval for any rt}if�d and subsequently approved beforeon of federal, sthis application an be processed. ate or local laws, codes or 'ances. 6) Plans or additional
atu
Date: e.% q , /d
Method of payment: El cash ElCheck El visa
EJ Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Page 2 of 2
Effective October 28, 2007
C:\Users\Tim\Downloads\Residential Construction Permit App.l.doc
For City Use Onl
PLUS Project Number /`�%'�'
00Kane
M Project Address %� > > :<
Valley11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
F
f our on-going commitment to customer service during the review process of your projec, we are providing you with a TARGET DATE for the initial technical application review. If for
we cannot meet this date, we will contact you with a revised target date.
ication review TARGET DATE is
GET DATE is the date we estimate your project application will have had its initial technical
is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date sho*n at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9107
�J