Loading...
VE-65-84 ZONING ADJUSTOR SPOKANE COUNTY, WASHINGTON IN THE MATTER OF VE-65-84 (ZE-45-84)9 WAM) FINDINGS OF FACT, ENTERPRISES, INC VARIANCES TO THE FRONT) DECISION AND YARD AND FLANKING STEET SETBACK ) CONDITIONS REQUIREMENTS ) THIS MATTER, Be1ng the consideration by the Zoning Ac~justor of Spokane County, in hearing the application (VE-65-84), for the purpose of allowing commercial structures to meet the minimum zoning ordinance setback require- ments between Argonne and Mul l an Roads and Catal do Avenue, he reinafter referred to as the "Proposal", and the Zoning Adjustor of Spokane County having held a public hearing on July 5, 1984 and having fully considered all testimony presented thereat, and further having visited the site and vicinity in question, and having reviewed the applicants revised site plan submitted on July 5, 1984 does hereby render a decision on the 12th day of July, 1984, APPROVING said proposa1, and does hereby make the following FINDINGS OF FACT 1 That the proposal is located between Argonne and Mullan Roads, adjacent to and north of Catal do Avenue 2 That the proposal consists of adopting the minimum setback requi rements wi th i n the Comme rcial zone fo r setbacks f rom the p rope rty 1 i ne whe reas the Spokane County Zoning Ordinance requi res such setbacks to be rreasured from the property 1 ine or centerl ine of the ri ght of way and to apply the greater setback 3 That the adopted Spokane County Generalized Comprehensive Land Use Plan indi cates Major Commerci al usage of the area encompassed by the proposal 4 That the site was approved for Commercia1 zoning on July 5, 1984 with formal fi ndi ngs to be entered July 12 , 1984 5 That the existing land uses in the area of proposal include a church to the no rth , to the east si ng1 e fami 1y resi denti al uses, to the south a vacant 1 ot and single fami ly resi denti al uses, to the west mul ti-fami ly and commerci al uses 6 That in review of the zone change and variance applications, the Spokane County Engineers Department has indicated that future road improvements in this vicinity are not contemplated 7 That one of the basic reasons for the dual setback requirements within the Spokarie County Zoning Ordinance was to provide adequate setbacks in the event of road expansion, and in this instance road improvements are not contemplated 8 That in acting upon the proposal, the Zoning Adjustor makes no determina- ti on of the adequacy of the site to meet Spokane County Engi neer ' 208' require- ments, the Spokane County Health District on-site wastewater disposal requirements, or the siting, sizing or the number of parking stalls indicated within the plot plan 9 That a party of record appeared siimply to express concern regarding the hei ght of the proposed structures and havi ng been i nformed of the 35' hei ght FINDINGS OF FACT, DECISION AND CONDITIONS VE-65-84 PAGE 2 1imi tati on , h ad no futhe r comments 10 That the proper legal requi rements for advertising of the hearing before the Zoning Adjusto r of Spokane County have been met CONCLUSION Following review of the Planning Department File, ZE-45-84 and VE-61C-84, con- si deration of the publ ic testl~mony, and ci rcumstances in the area of proposal, the Zoning Acjustor concl udes that the proposal is not detrimental and can be compatible to the publ ic heal th, safety and wel fare DECISION From the foregoing F1 ndings , a revi ew of the P1 anni ng Department Fi 1 e No VE-65-84, testimony at the public hearing, and a site visit, the Zoning Adjustor he reby in APPROVTNG the proposal establishes the following conditions A CONDITIONS OF APPROVAL 1) Prior to the release of bullding permits for this facility, the applicant shal1 submi t speci f1 c si te devel oprrent pl ans to the Spokane County Zoni ng Acfininistrator to coordinate the provisions of on-site wastewater disposal, sub-surface sewage disposal and the parking/landscaping and other pro- vi s i ons of the Spokane County Zoni ng Ordi nance 2) Other conditions and 1 imitations on this project are to be found in Planning Department File ZE-45-84 DATED THIS 12th DAY OF July , 1984 ~ D UG AS ADAM , ZONING ADJUSTOR SPOKANE OUNTY, WASHINGTON NOTE ANY PARTY AGGRFEVED BY THIS DECISION MUST FILE AN APPEAL WITHIN TEN (10) DAYS OF THIS DATE ' ~r .1~CAI~E C(~UNTY PLANN ING DEPARTMEIV r APPLICATIDNS BEFORE THE ZONING ADJIJSTOR/BUARD aF ApJU'STMENT r/ Ce rti fi cate of Exenipti on No. Appl icati an Na. :~I'~ ~ . . N ame v f Ap p 1 i c an t: S t ree t A dd re s s: City: 0 1 State: Zip Code: y5~o?01 Tele, Na., N ame o f P rvpe rty awner(s): Requested Acti on ( s) (Ci rcl e approp ri ate Acti ora C, Variance(s) ' Conditional Use Permit Administrative Appeal Tempa ra ry Pe rmi t 4Jai ve r of Vial at1 vn athe r: Zero Lat Line Non-Confvrming LotjUse ~ ~ * * * * ~ ~ * * ~ * * * * * * * * * * * ~ * ~ ~ * * * * * ~ ~ * ~ ~ ~ ~ * ~ ~ * * <3) F(?R STAFF USE ONLY ~ . * ~ *+C i te Ordin an ce Se et i v n.~~, Q'~,;~. ~ ~ Sectian TownshiP Ran9e PrvPerty Size: Existinq Zoninq Cgmprehensive Plan Desi qnati,~ n: ,rf~~ Cs~~n►~,,, ~ t'L.7i ~f ) ?,'rr Legal Checked by: Hearing Date: ReCeipt * ~ f ~ ~ ~ ~ * * * * * * * ~r * * * * ~ * ~ ~ * ~ ~ ~ * ~ * ~ * * * * * * ~ * * ~ * * ~ * * ~ Existing Use vf Prvaerty : P ro p a s e d U s e o f P rv perty . V St reet A ddre s s o f P ro pe rty : "I"c-! Leqal Des cri pti vn of Prope rty (i n cl u de easement i f appl icabl e) Parcel °Sauree vf Legal Total am+ount of adjoining land controlled by this owner/spansQr: What i nterest da you hol d i n the property: ,-I P1 ease li st previ ous Pl anni ng Depa rtment acti vns i nvvl vi ng th i s p rroperty: ~ 7- Ll /V ISWEAR THAT I AM THE OWNER OF RECQRQ OR aUTHORIZED AGENT FOR THE PROPOSED SITE. IF NaT THE QWNER, WRITTEN PERMISSION FROM SAID OWNER AUTHORIZING MY ACTIONS ON HIS/ HER BEHAtF IS ATTAGHED. r 1 5 i yn e d: a ate i x//,~ Ar'y A d d re s s: 96 P h Q n e N0 7'~ 1 u NOTARY SEA1_ : NOTARY : DaTE : r-) , i . A. ARIANCES 1. In view of the abave information, what speci al ci rcumstances (aeyond yQUr control or acti ons ) deprive you af the same general ri ghts and privi 1 eges of other prroperty awners within the same zone and vicini ty? . t 42 ~ ~7'"~.t`~-~` .1'~i "t" ,T 1 ~'!"~~S ~ S _ ~~~.e'~~ ~ ~/'~C'`/~/'✓✓ ' ~ 2. If the vari ance were granted, how woul d it affect nei ghboring properties vr imprvvements? /t- ~ B. CONDITIUNAL USES, ZERO LOT LINE, NON-GUNFORNIING USE, TEMPORARY PERMITS, ETC, . 1. Pte,,ase gi ve a cancise expl anation of the prapasal incl uding size, hours of vperal~lon, expeeted traffic and other features, etc. C. WAIVER OF U IOLAT IQN 1, How or why was the structure eS-tabi ished outside the prvvisians of the Spvkane County Zvning Ordinance? SIGIi-OFF BY COUNTY DEPARTMENTS (DD" CQUNTY EALTH 4ISTRICT A pre i i na ry consul tation has been hel d ta di scuss the propasal . The appl ca t has een infarmed of requi rerrents and standards. n. u~e Qa Si gn-off Wai ved by Planning Staff} COUNTY ENGINEER`S DEPaRTMENT A preliminary cansultation has been hel d ta discuss the proposal. The appl i cant as been i nfo rmed of requi rements and standards, ~ ~ f PJ--/ - '(S'Ignatu, Date Sign-off Wai ved by Pl anni ng Staff } 3. COUPdTY UTILITIES aEPARTMEfVT , A re1 iminary cansult Ion has been held ta discuss the praposaZ. The a p cant ,.b ev ' ftirme of requirements and standards. / C-, . . . c ;..r. ~ ~ 7--/?rZ__7L°Z-4-'L4g,,--Zais in the serviee area vf the Modern Electric Water Company. It is entitled ta the c4mpany's electric and water services. The proG viding of these services is subject to campliance with Washington Administrative Gvde and Spokane County ardinances. Prior to service, the company requires explicit authQrizativn pertaining to the placement-maintenanee vf electrical and water installations (easements may be reyuired), a campleted service application, a mechan- ical plan and a builc3ing plvt plan showing lvcativn of drywell, septic tanks, sewer pipelines and drainfields. Presently, there is no charge fvr the service appTica- tian. There are eharges for water services, water pipelines, fire hydrants and electrical installatians. Estimated pre-payment is required for these installaLions. ~ /i,~ {,t'n ."At", A2 _ 5ignature ~14 Za e ✓ PA.RCEL NUMBER LEGAL DESCRIPTION 17542-1117 OPPORTUNITY PT OF B60 Sk OF N4/5 OF PTN OF W2 S OF N20FT EXC S7FT & EXC ElE>OFT 17542-1122 OPPORTUNITY PT OF B60 E160FT OF Sk OF N4/5 OF 4,2- S OF N20FT EXC S30FT & EXC ST 17542-1124 OPPORTUNITY PT OF B60 BEG 20 FT N OF SW COR TH E TO PT -0 200 FT W OF N& S C-L OF TR 60 TH N 112.66 FT TH W 121.43FT TO PT ON W LN OF SD TR TH S TO POB EXC E 15FT 17542-1126 OPPORTUNITY PT OF B60 BEG 20FT N& 96.43FT W OF SE COR OF W;~ TH N 112.64FT TH W 118.57FT TH S 112.66FT TH E 118.57FT TO POB CONiBINED Q J~ ~ , 17542-1119 OPPORTUNITY PT F B60 DAF; BEG SE CO TH N 20FT TH W55FT TO TRUE 17542-1128 POB TH CONT W25FT TH N105.41FT TH W 16.43FT ~t3F,T TH S 112 . 6~tFT TO POB TH N7 . 23FT TH E ~4 w 1751+2-1123 OPPORTUNITY PT w r B60 DAF; BEG SE CO TH N132.62FT TH W55FT TO TRUE POB TH N22.77FT TH W105FT TH S22.77FT TH E105FT TO POB 17542-1127 OPPORTUNITY PT OF B60 W16. 43FT OF E96. 43FT OF N105. 44FT OF S112:65FT ; STREET ADDRESS 17542-1117 N 1008 ARGONNE ROAD 17542-1121+ N 1004 ARGONNE ROAD FROM = JAMES S. BLACK AND CO., NC, ,i0 Mr, Douglas Adams 500 COLUMBIA BUILDING / SPOKANE COUNTY PLANNING DEPARTMENT SPOKANE, WASHINGTON 99204 Broadway Centre Building Phone 509 - 838-2511 Spokane, WA 99260 ~ Z T ~ . SUBIECT: RE : ZE-45-84 & VE-65-84 DATE: 7/6/84 FOLG Doug, as a matter of clarification to the variance being reviewed by you, the site was zoned Commercial to accomodate a school which was not non-profit in nature. (See _"O~ Section 4.10.030 e14 uses permitted; hence, the need for Commercial zoning). Additionally, because of the computer school tenant we are in excess of the required parking for that us , but mav very well be below the required number of parking stalls for other typical retail uses. Please consider these points in reviewing your amended site plan. Additionally, keep in mind that this variance request is similar to that which was approved for Millwood _ ^urniture along Argonne Road with the same type of issue. That is to say meeting property Lines set-backs but not center line set-backs. Thank you for your considerations in this .natter. . PLEASE REPLY TO ► SIGNED Dwight Hume cc : Mr. Dan Davis REPLY ~ ~ - A 4t ► ~~s~' D~A ~(fj~ly DATE: SIGNED r = . GRAYARC CO., INC. BROOKLYN, N.Y. 11232 (3) GUPY FOR PERSOfv ADDRESSED - - - - - - , . ~ ~ ~ . ~ • C~ ~``f N ~ ~o. t;'''~'y t . 4 R G' - • ! , ~ ~+~,v ~ ~s~~sf .1«r ~ . << C p , s , • , l ~ Y~, r ~ ,r r+ ol . ~ / f ` ~ ~ , 1 , Z~ r2 ~ / ~ ~ , ,,~dd.so ~ 9•.t6. o- D D ~ ~ a • ^ ~ ~ " ' 4 ~ ' ~ a f - N - ° i ~ ~ ~ • ~s ~~b • t , . - ~ ~ ~ OZ4b~ ~ ,y ~v C 1 T, \ ~ ~ ~ n 1~1 ~ i ~ 'I . ~ r' ~ ~ i~• ' ~ 44L 1 y • ~ ~ ~n ~ y1 ; . , ~ • ~ D ~ 50 ~ r ~ • D ~ NY ,"i'ti' 1 t.rw'+r y~.~,+u'r ,1 • , : ~ , I ~ ay~+~+ ~ ~ . . ~ _ ~ ~ ~ ' , "L~:q:: tu:CLAS5IFICATLON NO.. VARIANCE NO.: VE-65-84 SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION ' This matter having come bef ore the Zoning Hearing Examiner Committee on July S, 1984, and the members of the Committee present being Kenneth Kennedy, Chairman, Jane E. Myers and Richard L. Skalstad. B. PROPOSAL The sponsor, WAM Enterprises, Inc., is requesting approval of a zone reclassification, File No. ZE-45-84, Single Family Residential (R-1) and Residential Office to Commercial, for the purpose of developing a Commercial Office; and a Variance request, VE-65-84, to allow variances to the Front Yard and Flanking Street Setback Requirements. C. FINDINGS OF FACT 1. That the existing land use in the area is residential, commercial, church and vacant. 2. That the Comprehensive Plan designates this area as appropriate for Major Commercial development. 3. That the existing zoning of the property described in the application is Single Family Residential (R-1) and Residential Office. 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs'with the Declaration of Non-Signif icance. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone Classification. 7. That the applicant has demonstrated that conditions have substantially changed since the original zonin~; of this are:i zn'A SCCordlI1.-,iV> rilt'_ p?'Or~(_)Srs'1 CC'7Oi1•' 7. itltit!17lt'd, 8. l~l.!~ ri - i. C'..-.,L -.i , 1 L'.1 L.. ZUNE RECLASSIFICATION NO.: ZE-45-$4 VARIANCE NO.: VE-65-84 C. FINDINGS OF FACT (continued) 9. That the owners of adjacent lands expressed neither approval nor disapproval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwis.~ detrimental to the public health, safety, and welfare. 11. The following are additional fi.ndin~-,s of fact considE-T-,_.-: Hearing Examiner Committee; a) That a landscape plan shall be submitt,:, ! Adjustor be continued to July 12, 1984, to allow time for the Zoning Adjustor to review the revised site plan submitted by the s pons or and obtain res ponse f rom the County De p; i:-?:::,_ c: Li;~i~: _.IF it. L j 1 ildL Lltt:~ :iedi iilb 15 CIUI. dC1(11 c_55111~ Cil~ IIlt=l 1 LS of the need for a Variance; this issue is solely under the jurisdiction of the Zoning Adjustor. D. CONDITIONS OR CONTINGENCIES A.PPLIED TO THIS APPROVAL (All Conditions imposed by the Zoning Hearing Examiner Committee shall be binding on the "Applicant", which term shall include the owner or owners of the property, heirs, assigns, and successors.) a) COUNTY PLANNING DEPARTMENT 1. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to instailation of such lighting. (Such plan shall attempt to confine illumination to the area with full consideration to adjacent properties). 2. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. . ZONE RECLASSIFICATION NO.: ZE-45-84 VARIANCE NO.: VE-65-84 a) COUNTY PLANIVING DEPARTMENT (continued) 3, A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Adwinistrator shall be submitted with a performance bond for the project prior to release of building permits. Landscaping shall be installed and maintained such that sight distance at access points is not obscured or impaired. 4. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Variations wtien approved by the Zoning Administirator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 5. That the site plan submitted for Building Permits be designed to comply with yard setbacks, garking criteria and landscaping, which may result in a reduction in building coverage. 6. The specific development plan will be submitted for Planning Department review and approval prior to issuance of building permits. 7. All current standards of the Commercial Zone, as amended, shall be complied with in the development of this site. 8. That the present proposal is not detailed enough to determine whether or not the use of or materials stored on the site are in compliance with Chapter 4,16A (Aquifer Sensitive Area Overlay Zone) of the Spokane County Zoning Ordinance. Accordingly, as a condition of approval, the sponsor/applicant shall be required to file with the Spokane County Auditor, within thirty (30) days of the signing of Findings and Order of the f inal decision in this matter, a"Notice to the Public" which shall provide in material as follows: PRIOR TO TKE ISSUANCE OF ANY BUILDING PERMIT OR CERTIFICATE OF OCCUPANCY FOR ANY BUILDING OR ANY USE ON THE PROPERTY DESCRIBL:ll HEREINAFTER, THE APPLICANT SHALL BE RESPONSIBLE FOR C0MPLYING WITH THE PROVISIONS OF SPOKANE COUNTY ZONING ORDINANCE CHAPTER 4,16A (AQUIFER SENSITIVE AREA OVEItLAY ZONE). TIiE PROPERTY WtiICH IS THE SUI3JECT OF THIS NOTICE IS MORE PARTICULARLY DESCRIBED AS FOLLOWS...... . 3 . ..~i.~~. i~i,l,i_AS;il.t~ Il,AliUiv ivU. VARIAti'CE NO. : VF-6 5-8', i~ ~,•~~~.rli ~'l..l,~.\L!~lLJL't~:ii,liil~lV1 ~CU11t111UCCl~ 9. Signs for this project shall conform to standards as set forth in Section 4.09.125 Signs. 10. A pplicant shall comply with '208' recommendations concerning stormwater runoff and provide necessary landscaping for runoff. 11. Any division of land for the purpose of sale, lease or transfer, shall comply with RCW 58-17 and the Spokane County Platting Ordinances prior to issuance of building permits. 12. That the provisions of SCPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77-1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on-site improvements, or file appropriate documents to the effect that the NOTICE OF ACTION is waived in accordance with Spokane County Commissioners' Resolution #82-0458 dated Alay 4, 1982. 13. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197-10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non-significance has been issued at least f ifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's likely significant adverse impacts to the physical environment; a finding is hereby made that no probable significant adverse impacts upon the physical environ ment are anticipated as a result of the project; and a final declaration of non-signif icance is liereby to be issued. b) CUUNTY ENGIi1EERING DEPARTMENT Prior To The Issuance Of A Building Permit: 1. Access permits for approaches to the County Road System shall be obtained from the Spokane County Engineer. 2. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water di plan f or the entire project prior to the issuance of any ~,,i • `.T-,; , S l~i:CL.1SSIFICATLO~v .~U.. 4~-84 VARIANCE NO.: VE-65-8~'+ b) .__,1_.__......,.. iL liii_:c'l~ 3. A parking plan and traffic circulation plan shall be submitted and approved by the Spolcane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required f or any portion of the project which is to be occupied or traveled by vehicles. 4. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 5. The construction of tlle road improvements stated herein shall be acc omplished as approved by the Spokane County Engineer. 6. All required improvements S11311 conform to the current State of Wasliington Standard Specifications for Road and Bridge Cunstruction, and other applicable County standards and/or adopted resolutions pertaining to Road Standards and Stormwater i-tanagement in effect at the date of construction, unless otherwise approved by the County Engineer. 7. Roadway standards, typical roadway sections and drainage plan requirements are f ound in S pokane Board of County Commissioners'Resolution No. 80-1592 as amended. c) COUNTY UTILITIES DEPARTMENT 1. Pursuant to Board of County Commissioners Resolution No. 80-0418, the use of on-site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health Uistrict and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 2, The owner(s) or Successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a ULID by petition method pursuant to RCW 36.94 which the petition includes the Owner(s) property and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the Owner(s) property. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called for in cunjunction with the formation of a ULID by either petition or resolution method under RCW Chapter 36.94. 5 'LONE RBCLASSIFICATION NO.: ZE-45-84 VARIANCE NO.: VE-65-84 c) COUNTY UTILITIES DEPARTr1ENT (continued) 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as amended. 4. Each unit shall be double- plumbed for connection to future areawide collection systems. d) COUNTY HEALTH DISTRICT 1. A combined surface water and sewage disposal detailed plan shallbe approved by the County Engineer and the Health District prior to the issuance of any building permit for this project. 2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 3. Subject to specific application approval and issuance of permits by the Health Officer, the use of an individual on-site sewage system may be authorized. 4. Water service shall be coordinated through the Director of Utilities, Spokane County. 5. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. ti. Use of private wells and water systems is prohibited. 7. Disposal of sewage effluent beneath paved surfaces is currently prohibited. e) COUN'TY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District # 1. 2, Installation of fire hydrants are required to be installed and serviceable in accordance with the Spokane County Department of Building and Safety prior to development. A water plan showing each fire hydrant and being in compliance with Chapter 10.04 of the Spokane County Uniform Fire Code, is required prior to construction of water service. The water plan shall specify the gallons per minute for each fire hydrant at residual pressure of no less than 20 p.s.i. (minimum pressure). 6 J ZONE RECLASSIFICATION NO.: ZE-45-h! e) COUNTY BUILDING AND SAFETY DEPARTMLNT (continued) 3. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. 4. Trash enclosures shall not be located adjacent to combustible construction or underneath windows or nonprotected eaves. f) WATER PURVEYOR 1. Water Purveyor is Modern Electric Water Company, and they will supply the site with adequate water for domestic, fire and irrigation uses. . - . . . . .•.1 1: tiui-L ilCiv~. t~v~ll_:LiUi.:~ ilLi:d[ J;15L ci,1iSSiUi15 ..lillil' demolition, excavation and construction projects be controlled. This may require use of water sprays, tarps, sprinklers, or suspension of activity during certain weather conditions. Haul roads should be treated and emissions from the transfer of earthen material must be controlled as well as emissions from all other construction related activities. 2. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surf aces. 3. Al1 travelled surfaces (ingress, egress, parking areas, acCess roads) must be paved and kept clean. 4. Sone objectionable odors will likely result during the construction phase of the project and from motor vehicles using the site following completion of the project and from occupants of the proposed project. 5. All air pollution regulations must be met. 7 A • ZONL RECLASSIFICATIOV NO.: ZE-45-84 VARIANCE NO.: VE-65-84 E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds tha: the application of WAM Enterpirses, Inc., for a zone reclassification as described in the application should be APPROVED. Motion by: Skalst-ad Seconded by: Vote: Skalstad - Aye Myers - Aye Kennedy - Aye Unanimous to APPROVE to the COriMERCIAL ZONE 3- 0) HLARING EXAMINER COt*IITTEE HEREBY .ATTEST TO THE ABOVE FINDINGS, ORDER, AND VOTE Chairman . ATTEST: For WALLIS D. HUBBARD -Planning Director r &:,t_..By-STEVE P. HOROBIOWSKI Zoning Administrator Date: Sq