2014, 05-13 Permit: APR-2013-0077 Approach City of Spokane Valley
STY 0,1\1.41.
okaneCommunity Development
Sn
11703 E. Sprague Ave., Suite B-3
SValleyo Spokane Valley, WA 99206
(509)720-5240
permitcenter( spokanevalley.orq
APR-2013-0077 DE-APPROACH
PROJECT NAME:APPROACH- 1108 S PROGRESS ISSUED: 05/13/2014
SITE ADDRESS: 1108 S PROGRESS ROAD SPOKANE VALLEY EXPIRES:
PROJECT DESCRIPTION: NEW SFR APPROACH
PARCEL: 45234.0712
APPLICANT: FUTUREPOINT DEVELOPMENT INC OWNER: FUTUREPOINT DEVELOPMENT INC
PO BOX 673 VERADALE,WA 99037 PO BOX 673
509-844-7148 VERADALE,WA 99037
509-844-7148
GENERAL CONTRACTOR: FUTUREPOINT DEVELOPMENT INC License: FUTURDL875OT
PO BOX 673 Expires: 09/30/2015
VERADALE,WA 99037
509-844-7148
FEES: Paid Due
Approach $52.00 $0.00
Totals : $52.00 $0.00
CONDITIONS
* 1. Approach to be constructed pursuant to City of Spokane Valley Street Standards, Standard Plan R-114.
2. Saw cutting of existing curb to create an approach is not allowed within the City?s jurisdiction.
3. Approach is to be inspected by the City?s ROW Inspector prior to concrete placement.
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit
applicant, by definition, is the property owner or an authorized agent of the property owner. It is the
responsibility of the applicant/permittee that the use described on the front of this permit complies with
applicable codes and that required inspections are requested. Failure to request inspections as listed
below and obtain the necessary approvals before progressing beyond the point where inspections are
required and may necessitate removal of certain parts of the construction are the applicant's/permittee's
or property owner's expense.
Owner/Agent //�� Date:
/
f �
U// Date: .�I
Staff Approval / Zl L�
Printed by:Mary May on:05/13/2014 08:08 AM Page 1 of 1