HomeMy WebLinkAbout2011, 05-27 Permit App: 11001322 Shop, Addition Project Number: 11001322 Inv: 1 Application Date: 5/27/2011 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: SHOP 40 X 60 -ATTACHED LIVING SPACE Contact: COOKS,E ALLEN&CAROL L
Address: 14019 E 19TH AVE
C-S-Z: SPOKANE VALLEY,WA 99037
Setbacks:Front Left: Right: Rear: Phone: (509)951-8636
Group Name:
Site Information:
Project Name:
Plat Key: Name: Range District: East
Parcel Number: 45234.1615 Block: Lot:
SiteAddress: 1412 S PROGRESS RD Owner:Name: COOKS,E ALLEN&CAROL L
Address: 14019 E 19TH AVE
Location::CSV SPOKANE VALLEY,WA 99037
Zoning: R-3 SF Res District
Water District: 010 VERA Hold: ❑
Area: 10,385 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review Released By:
Originally Released: 5/17/2011 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 5/27/2011 By: LBARLOW
Sewer Review `Released By:
Permits:
Operator: jmm Printed By: jmm Print Date: 5/27/2011
Project Number: 11001322 Inv: 1 Application Date: 5/27/2011 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Su Ft Valuation
2ND FLOOR R-3 VB 832 $61,742.72 832 $61,742.72
COV DECK R-3 VB 130 $1,950.00 130 $1,950.00
GAR WOOD U-1 VB 2,208 $41,952.00 2,208 $41,952.00
Totals: 3,170 $105,644.72 3,170 $105,644.72
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $1,027.35
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $410.94
Permit Total Fees: $1,442.79
—— —- -_ - Mechanical Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
Item Description Units Unit Desc Fee Amount
RANGE 1 NUMBER OF $10.00
VENTILATION SYSTEM 1 NUMBER OF $13.00
VENTILATION MECH EXHAUST 1 NUMBER OF $13.00
Permit Total Fees: $36.00
Plumbing Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
Item Description Units Unit Desc Fee Amount
TOILETS/BIDETS 1 NUMBER OF $6.00
SINKS 2 NUMBER OF $12.00
SHOWERS 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
WATER HEATER-ELECTRIC 1 NUMBER OF $6.00
MISCELLANEOUS FIXTURES 1 NUMBER OF $6.00
Permit Total Fees: $42.00
Operator: jmm Printed By: jmm Print Date: 5/27/2011
Project Number: 11001322 Inv: 1 Application Date: 5/27/2011 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes:
Hard paved access shall be provided to all three garage bays from the public right-of-way. If the curb
cut is altered,a right-of-way permit may be required. Contact the Building Dept. for information.
The Shop portion may only be used for personal use. Commercial uses are not allowed in this zoning
district. .
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,442.79 $1,442.79 $480.38 $962.41
Mechanical Permit $36.00 $36.00 $0.00 $36.00
Plumbing Permit $42.00 $42.00 $0.00 $42.00
$1,520.79 $1,520.79 $480.38 $1,040.41
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 5/27/2011
._.��_/-.— C. uni Development Department (Staff Use Only)
i ,, I V 1-41703 Eas Sprague Avenue, Suite B-3 PERMIT NUMBER:
ar"PermitC ter
� � r� -��Sj1iEB4iNI--CENttne V. Iley, WA 99206
Tel: (509) 88 0036 PERMIT FEE:
V ���1�Fax: (509} .88 0037
`+' )Fermitcent: @spokanevallev.orq
l ' P E ►l _. --= ;. .. "'RUCTION PERMIT APPLICATION
L NEW CONSTRUCTION 0 ADDITION/REMODEL ID ACCESSORY BUILDING
El DECK Q OTHER
6y'$ITE ADDRESS: 14 12. 5 p it O G l2 a SS RD.
ASSESSORS PARCEL NO.: 4 X 234' I C IS1.EGAL DESCRIPTION:
BUILDING OWNER NAME: /�/'
NAME: E i A L L /�G � �. oalc
ADDRESS: 4/1 Q/9 E I A /E /L p� G✓�
CITY: .S POK,u E 1/A L.L.E Y STATE: li/ I7 ZIP: ✓ Q 3 7
PHONE: 9s /' S C3( FAX: CELL:
CONTACT NAME: JA km, r
PHONE: FAX: CELL:
CONTRACTOR NAME: l i /A
MAILING ADDRESS:
CITY: STATE: ZIP:
PHONE: FAX: CELL:
CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Jig", ep /A T rAcsF0 i. ( ✓i.r6 S/0/4 c 6
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE_
Height to Peak: / 4 Dimensions: d �/ / No. of Stories: Total Habitable Do
2 S• (� I.
A`j G Z Space: 15
Main Floor SQ FT: /I' Upper Floor 0 FT: Unfinished Bas nt SQ Finished Basemen SQ
�-�l' /(-14- FT: FT: N
Garage SQ FT: r Deck/ overed Patio SQ Impervious Surface 30% Slopes on
220g FT: I3Q •, Area: Property: No
21--1-1010' ca IC
No. of Bedrooms: Constru , . T Heat Source: ELFC. Sewer or Septic: s(wx
TOTAL COST OF PROJECT: $ ,SD,OQG
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature Date: S/?.-///
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit__Residential_11-11-11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions o Setbacks to property lines
o Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
O Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes ❑Window well locations if applicable
o Brace wall panel locations o Room usage labels
o Water heater and furnace locations o Smoke detector locations
o Exhaust fan locations ❑ Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
❑ Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing ❑ Beam and girder size and location
O Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection ❑ Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
❑ Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing o Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/side view/dimensions o Footings/post/and beam size and locations
❑ Floor Joist/decking direction, size and spacing
O Stairway tread rise & run and nosing 0 Handrail/Guard height&spacing
Permit Center
S Akan 11703 E Sprague Ave,Suite B-3
Spokane Valley,WA 99206 NUMBER:
UMBER:
P 11.1
jv'dlle�" (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
permitcenter@spokanevalley.org
Community Development 4-' 4
Plumbing Permit Application /� R n n Commercial residential
SITE ADDRESS: 14 1 2 S Pito o C► g e s V.
Building Owner ALLEN
C /�
Name: E . A L L E NC O �r< Phone: 9S` / �� G 3` Fax: p n
Address: 'dot' E19Th A l 4 City.SloOikitNC ✓p LL EY State: 4./ A Zip:.5 9037
Contractor
Name: N / \ Phone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: Phone:
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
URINALS
TUBS
SHOWERS(per trap)
Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food,
SINKS Prep/Culinary Meat G.
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑CHECK ❑VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT:http://www.spokanevalley.orq/under the quick links for Forms,Master Fee Schedule.
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplication040309.doc
Permit Center
S okane 11703E Sprague Ave,Su9206B-3 PERMIT NUMBER:
P Spokane Valley,WA 99206
jValler (509)688-0036 FAX:(509)688-0037
Community Development permitcenter(a,spokanevallev.org PERMIT
-FEE:
Mechanical PermitApplicationn Commercial [llZesidential
SITE ADDRESS: 1i. G. S P/2 D t /Z E SS MO
Building Owner
Name: E, ALL EN C O 0 < Phone: s-1 _8 4 3 L Fax:
Address:14 0 19 E 19Th AVE City: S 1'OIAN E Vp L,.L.CY State: W A Zip:55 03 7
Contractor
Name: Phone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: Phone:
#UNITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM(each outlet)
GAS LOG,FIREPLACE,&GAS INSERT /►
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT 4^ pie) tz
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST p4ro I/ENT Each fan connected to a singe duct
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES Range,Clothes Washer
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD Type I
HOOD Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM—FREE STANDING
EXPIRES: VIN:
['CASH D CHECK D VISA DMC
CARD#: SIGNATURE
http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/Meth anicalPermitApplication040309.doc
Mike Turbak
From: Cooke, Kevin [KCooke@spokanecounty.org]
Sent: Friday, June 17, 2011 1:18 PM
To: Mike Turbak; Doug Powell
Cc: Depner, Colin; Urhausen, Billy; Knudson, Chris
Subject: Permits for Lot 3, SHP 16-06
Good Afternoon Mike and Doug,
The owner of Lot 3 of SHP 16-06,Allen Cook, has approached the Division of Utilities regarding the issuance of a sewer connection
permit for the property. It is our understanding that he intends to construct a shop building with an integral living space on the lot.
In reviewing the sewer service situation,we have determined that it will be acceptable to the Division of Utilities for Mr.Cook and
his neighbor on Lot 4 to share the existing sewer service line that currently provides service to Lot 4. This line is partially located on
Lot 3. Mr.Cook would connect his service line to the existing line at a point lying approximately 20 feet west and 10 feet south of his
northeast property corner.
To facilitate this approach to completing his connection,the Division of Utilities will require that Mr.Cook and the owner of Lot 4
execute an acceptable"Joint Use and Hold Harmless Agreement". We will also require that an easement be recorded on Lot 3
allowing for the continued use of the existing sewer service line on Lot 3 by the owner of Lot 4. We have discussed these
requirements with Mr.Cook,as well as the requirement to pay General Facilities Charges(GFCs)and monthly sewer service fees.
The Division of Utilities will require that the agreement and the easement discussed above be executed and recorded prior to the
issuance of the sewer connection permit for Lot 3. In light of the time required for Mr.Cook to complete these items,the Division of
Utilities does not take exception to the issuance of the building permit by the City prior to our issuance of the sewer connection
permit. This approach would allow Mr.Cook to proceed with the construction of his shop while concurrently working on the
preparation,execution, and recording of the agreement and the sewer service easement.
Please call me at 477-7286 if you have any questions or if you need additional information in this regard.
Best Regards,
Kevin R.Cooke, P.E.
Sewer Planning and Design Manager
477-7286
1
05/18/14
City of Spokane Valley
11703 E. Sprague Ave. Suite B3
Spokane Valley, WA 99206
Permit Center
RE: Project#11001322
1412 S. Progress Rd.
To Whom It May Concern:
This letter is in response to your request regarding the change of the East covered patio to a
glassed—in porch.
This change was necessitated by snow accumulations during construction on the East covered
patio. I added additional jams and installed windows in this area to allow closing the patio to
snow and weather.
The original structural supports are installed as per plans with the addition of studs below the
handrail with plywood closure and windows above the handrail with added jambs.
This change will allow this area to be weather-tight and increase the structural strength of the
building with the additional supports and plywood.
Please feel free to contact me should you have any questions.
Sincerely, �.
4"„ csosiN
E. Allen Cook, P.E. 411, /� ' p.
14019 E 19th Ave. �- a':; .4110
�w
Spokane Valley , WA 9903704.
��
x' 911114
N�
CIVIL g MCCHANICAL
For City Use Only
SCITY PLUS Project Number
pö kane Project Address
4000 a e °
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
•
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
-r
. ... ,........, ____.
No -rEs ,
i
fi# Z )iiiew
soiL - GP A L LOtkl A6L E s t)i) = 3000 fr'srt
ACTUAL ..5 b e --z ) 2_40 raS F mikKit'itbN I a3,
G.+.ooF - SNti) c.)
td i.c),cci.;) :".. f'..->F ;14____ .% 1, --r- ,), _ .. __ _
ph AL r
,\,i, 1 tvi D- c 38 i
Le
),..
3 pE..5 - a 036 IN it:tz/VATioluAL b4. p6, Coat
6() (.. LiN I 1---6Hii i';'i,Li Pi C4 i N; C4',
x
..- ,
.514 E.0
f1
1
,Jk
',-
, t..
1
_±.------
. _
.f,
,Irl3
k • - \ -.---- ,
"-•
__
N -
1 1 --
__ _
,,, --__ \ ---
,
- -.
4,- -
_ ,-- --
., ---)
7...
\ 1 / -,c. ,
,
),
,
, _ \
t •
. _
_ ' \
, \ „.
...
_ ...... . --
,
. _ --, , . ii••,,, >,
. r4.1 - ....--'..- Co •' i
1 ...1
PLANNING DEPT. APPROVED --2, • 1, _ ',, ----
'''• 4., N6i-e ', nrod pvcrci
! i ,
\
1 .. eit /5
By: L. 6cu.J-03 ' \t la -,::,___L____,
LA •".;:i
, i ej-ki -t-Lalki
;tkail
- ep,Lacf...
14.. .1i 0 L eil,F-YrAiriCt .
S
k i •5 ,, ,, ____,..-----:\'..,, byz t k)L v./14 y
lo w 1
PAVERS Lcvt ( r(Afe_cv
i
;1.' 12(4 , 1
I l ,
.. ----,,
________
/
It
lLI '
; c a ,88 ,P,' P f„:•.ii,i
• I
, 1
1 } PROGRESS RP,
1 i
i .
EA --/H lii---iii;.i* i)- FL 0 T PL.. A N
RECEIVED CSV T
1 '.‘,E\/•1 L.1- ss — Ai_ ,_, c,,,
i
ic --- 'FPI_
Project
i
X
PARC E L:* 45Z .)4, i G I E TONE R3
LOT ARE. A to c
mPER7 c; TER
0
E iNI
s s Ay3
a zi-
r2'
) -
..ord.....‘u
i i 1
CONTACT /A., -LDf(E,SL'. : i 40 15 E i"--. iii Au f:
etp,„9.;.•• ..,...
u/ONAL 1•I'.41°
COOK 13 u 1 1-0 IN G
3-12 iv 1 1 :