2007, 10-25 Permit App: 07004207 Pole Building Project Number: 07004207 Inv: 1 Application Date: 10/25/2007 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
41-.MUCIPIMPORMONWOM
Permit Use: 30 X 42 POLE BLDG Contact: TOWN&COUNTRY
Address: 5918 E TRENT AVE
C-S-Z: SPOKANE,WA 99212
Setbacks:Front Left: Right: Rear: Phone: (509)535-9016
Group Name:
Site Information: Project Name:
Plat Key: 002704 Name: UNIVERSITY PLACE District: Sout
Parcel Number: 45204.1955 Block: Lot:
SiteAddress: 1204 S OBERLIN RD Owner:Name: KIRBY,SHELDON
Address: 1204 S OBERLIN RD
Location::CSV SPOKANE VALLEY,WA 99206
Zoning: UR-3.5 Urban Residential 3.5
Water District: 101 SPO CO WATER DIST#3B Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review
Building Plan Review Released By:
Originally Released: 10/23/2007 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
No other accessory structures allowed other than what is shown on the approved site plan. Max square
footage has been met.
Originally Released: 10/24/2007 By: tschmidt
Permits
Operator: jmm Printed By: jmm Print Date: 10/25/2007
Project Number: 07004207 Inv: 1 Application Date: 10/25/2007 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: TOWN&COUNTRY BLDG Firm: TOWN&COUNTRY BLDG CONT
Address: 3908 W DAMN LN Phone: (509)448-8483
CHENEY,WA 99004
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB POLE BLDG 1,260 $23,940.00 1,260 $23,940.00
Totals: 1,260 $23,940.00 1,260 $23,940.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $377.25
ACCESSORY PLANS REVIEW 1 SELECT $94.31
WSBC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $476.06
No other accessory structures allowed other than what is shown on the approved site plan. Max square
footage has been met.
Payment Summary: .: Y mati4a,Luumgrowarammsrautc, € ,s> ,x ��,. �aa% 5ss .*..»,_
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $476.06 $476.06 $0.00 $476.06
$476.06 $476.06 $0.00 $476.06
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 10/25/2007
Permit Center
11707 E Sprague Ave, Suite 106 PERMIT NUIv1BER: i-/2 o 7
�d1IL Spokane Valley,WA 99206 RECEIVED B ppFRMIT
•
. �� ley (509)688-0036 FAX:(509)688-0037 CITY OF SPOKANE V LLEY FEE.
`�"J b www.spokanevallev.org t ,
Community Development
Residential Construction EiNeWipitfiETStikiffilh 171 Accessory Bldg
Permit Application ❑ ilition/Remodel l Deck
n Other:
Slit ADDRESS: /20zi 6. 010er'I;I P,c,)
ASSESSORS PARCEL NO: 145„2()q . I of S.S LEGAL DESCRIPTION:
Building Owner: Contractor:
Name: 2 ell)
K�,►i lI �l Name:-Muhl/ CoUd I TR &iG D �S . ,t/c.
Address: /.2c)) /u 5 �l� i 1� Address: $9/8 Eq� TR r/wE4/'1E
120/:11
City: S PO 4/1/44- G 4 v State:bU ll Zip: City:3p 3fr (JE voka r State:�✓A Zip:f9 2/Fax:
� �— ' q.5-.? I Fax: Phone:se?Jr 9A,6 Fax:5�9 Say 439
/ Contractor Lic No:TWyeariz34Exp Date:
•
06,130/05
Contact Person I City Business Lic.No: I0l 05°7 496-
Name:
9 JamName: G¢LE bun!E77
Phone: 509 535 9016 FAT 24'
Describe the scope of work in detail: Cost of Project: $ Zo,33$
0 x 1/2 X /y Pv s - Fdr4-,,-.c_
Proposed Use: Ga.vcc5 e
**************The following MUST be complete: (write N/A if not applicable **********************
FTG:HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE:
l / 30X)0/2X/if &A1L /V
MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUgt URFACE
1240 Allit 04' AREA: Aix_
FINISHED BASE?V)E JT GARAGE'SQ. FTG: , DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: / 2(,O f �'
— " I✓� PROPERTY: 1W
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOUR SEWER OR SEPTIC?
AIM'
Por FiQ�}M E N_
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: 7//te,1L1 '/ � DATE: /C /c( —
Method of Payment:
0 Cash 0 Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 7115/07
• New project
Project
, �ors ° Previous pre-app meeting
poKafle Transmittal Plan revisions 0
City of Spokane Valley Transmittal Date:
.000,Valley
Community Development Friday, October 19,2007
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 1204 S OBERLIN RD Project Number: 07004207
Parcel Number: 45204.1955
Zoning: UR-3.5 Water District: SPO CO WATER DIST#3B
Fire District: FD 01
Applicant: TOWN & COUNTRY Owner: KIRBY, SHELDON
5918 E TRENT AVE 1204 S OBERLIN RD
SPOKANE, WA 99212 SPOKANE VALLEY, WA 99206
(509) 535-9016
e-mail: e-mail:
Occupant: lECEll W1 ini >
Contact: TOWN & COUNTRY P
5918 E TRENT AVE Va-mail: J L_}
SPOKANE, WA 99212 - 14CT << >002
(509) 535-9016 D3 1
e-mail: D lJ_ ] f11 li
1Ii iIM K.. 1),
Contractor: TOWN & COUNTRY BLDG CONTR Arch/Engineer:
3908 W DAKIN LN
CHENEY, WA 99004
(509) 448-8483
e-mail:
Project 30 X 42 POLE BLDG
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION i \
CONSTRUCTION PLANS \
SITE PLANS
t
_ 0y\ P U\)
Please send all plan review and project comments via e-mail to the
highlighted individuals.
For City Use Only
CITY OF
PLUS Project Number - 610 7
Project Address U J C i""�`I
SPOIi e �c
alle °
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is /096/0 9% 7
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
15
3/
'Dos f
.48Gulami
30
37
/3-
H
0
Lk
5
►�
L13
PLANNING DEP , APPROVED
BY.
DATE: ' c -'I
7(0.
S FL -4o4)
riot' Sourif
oxtami
cfa
eal
3J
/3�
37
H
0
5
it (3
•
WAMBEKE ENGINEERING 2913 East 61st Court
Daniel Wambeke, P. E. Spokane, WA 99223
Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com
STRUCTURAL DESIGN DRAWINGS
STRUCTURAL DESIGN CALCULATIONS
FOR
30' X 42' X 14' POST FRAME BUILDING
FOR
SHELDON KIRBY
SPOKANE VALLEY, WASHINGTON
JOB NO. SP 8693
PREPARED FOR
TOWN & COUNTRY BUILDERS, INC.
SPOKANE, WASHINGTON
October 19, 2007
titi L
WASH,WAS RECEIVED BY
�1 �F ��,
G. • CITY OF SPOKANE VA! LEY
0� OCT 19 2001
"` D' •;�a' PE MIT CENTEH
�'tF RF-GIIS6ER ,c,\N :
/ONAL. 0"
11=KNOWINI
Designer of Small Structures. Post Frame Buildings, Foundations,
Light Gauge Steel Framing and Grain Storage Systems
D esi n Criteria SP 56?3
-26.06 Tee Wind Load 8 S 0404 s/(-fii a 4 KIR&
Live Load so 'sr
Dead Load S f � + �
'dialE 1�4G ,
Bay Spacing /01-4" I x y2, x l y/o„
PLF 34 i3 q:a.
z.
30-ay mi3Le
/
/ /r I // 4
/O—b y /0- x /a o I
o
4o.
® 4
,, Zz z=. 1$
4xb
if
f -2o
a
0
_ 7"r— IliN
e
c9J & Z,o —
4
18 22 3066
6 X10 OtFl6 w w ra • o wA k/ &
a 0Cr! fri .
'�” .4 4 �0, 16067
' C� �p `.crSTeRv G
S%ONAL
FLook PC.A4 POST n LAyacr I EXPIRES ( u(, Gi-
6ilB a- 16-o7 lie i1
SP 861
T-lam .
• - E • 77c4 / Po,/ L P c..2 .60 :<.-7-
GA4dr , r
f
1111b'` IA * . __
lir ----__ :o_
. III .
J1 - o. - 4 . s -
;':cl,". A , b ' -7 „
7 `Q-
-.4 ' 1
IIIH ( -,._o
_T.( ( -n I _,
. II �d o�1..,..4 0
° — ' 117=4 LI ii
ccc
B„Jou, -2
7_)/PIC AL FooTliv G DETAIL
Post/ FQOTING S[ NEDuL E
lBST i
LO e44~")2/;/ Si2-E _ X51.E
f ,�
21)(Zc► ,3 ' A LX IL ro" Y. 1'lo " x311 y S �rAS
' 0 ,z ,X4. I -e X I-_r X 31
antEs,5 ixo l',,„ x I,6n X 3,`a
'L Wq
. �tido,F wns,v, —
4h‘i'. ,s(ii ro `vG,ILIA'A!
' - r 44; OVA ,
•
� r
Glr
16O•,C 4,4180 g 67 /
G
SSS
[EXPIRES r
Sfg693
IQ. I6g dAtIrLS !O I0 drtIL4
▪ ,
•• • s4PFoa-T Bch '• ' S41o,r
r• • /Q id Ni4113
10 16/ l/L
5
•• Gi -r5
11' i 161 Atms_s . y 16d Al t►LS
I,
[
.10:R4vEgs TNTEIz+oR.
- ;-yam .-?b!gz/ S_ Waif
2-2x6 04,41 8zocks `i NM{LS Tb ptilaiptiteLocAs
wirtif- ___Y_LithAiLs ' \
To KAFTEiz5
1 la _,‘• -5 Sala thed
J 12 164) AktizAI --H_____1_,
Su PP S BL.oct'�s . ®_�� -
II p rz o N�rs M9 oa -III ,
G101.T _ :I_ 1
5 IWA _ I
I-fE4.13ERSPuVLJNS
•
O-L Wq�`
�1 OF WAS4W ��4
r , v
, q )-
16O 18067 Q `V�
'c��,pFctsr"/,G�
n-i- m G!{afl0 1F�a5j SIONAL
"---) ,
EXPIRES 1'�
a X4,DF--1-4Z SET' 7.,1 /
Tots- 444 6/0 c i I
yfiu5% 0oTTo4'J C HO°1J gP,i_riJG
SP 861-3
3 " Sm L Barrs ZX AIS 2y no,c
y
1s/-cgs
W I TF}• UlA �.
i
1
CTY1IC4L) �P) -- �x. - .Doti1 '1W 5
,, ,; _� � �ti : its. �;� .
I z)(4 -
wOgiAG
{ ,.2.7%C.1 ' .D . &rT,. C i690$. • ��ti q��� •
�y '/dirt F WAS
��') ft psi i '.'
I
I
e i.G71 l 'of T,'u. S .� , "�w�
0.<, do? 18067TOO'
,v •
G
•
2._8._ JE,. _ }sus c . 144d)-- 1
•2x2! , i11 Top Vi n_ s . " . r - .a
1 ' ! '. ''':' rigrF, , ' 11 ,i. ,', • .7-17--.; ',•t" L. , •. . ,: •2.-;4 Its,04/...,,,, •
‘.; —'- 1 i J i' `.
t •i 1 Tri -r 1
j
iia �- zx4 ItncKilC- 2y �, a z =" 1CMOs .
2 3/y-"'T1€c goers Atom
r - = noit:5Kr.gs * A!.i- BOLTS /}KE4 44N,1rwt of 2"
c4 FR,om EOjC OF.; To fir-w4-oi
a Boers * A- M�Nr�us9 op 3"
6x pas-r' Fi OW CENTS 6F cr to tag orAozr
HuvcH tNW fc-ried OF wSS SP 869 5
,_. EAM Rlifigr,c &-84Ad)
l- zXlo ;Q�� z .o !Z
3/ �� , occas SNo fi4 - ' 19- ii7,0 1
•y
.,...4„� kiss
i
y -
x-.— ____ 'qI i
:0....
,= .Zx1D ,1 - 27(/Q ZXuO
f ,SECT IDA) Q 70 ii , a i
/10 „IC 21(6
12 II-
n 15'0- �fl'1._1_►_ S-O �,�iv
,piI 1 ,c_r -ink
_•a «�:—� I I
0
In ewsa_w
1 I iMME�I
I 1 16x/0 oi# I. 2dZ I
I Ni I p 1
iliMININI:giT, ' n
t
of wAsff /
keef 4gfolt- I
l'0,?, R18067 a
FS
FGISTER�
S!oval �G
e. ....— - '' - PIRES1Z *.q !�
I
L ?.X LP 2 X I0 /yam✓�^. Z r 10 - 4 7 Kin
V �)
S�cTio�Js O Q .' sr B6g3
1% .Span
,� 1/3 Scan
_ 114 Soan
•
Purling zX6,27F,1L
c@ 2g " oc trun of rafter
.:
NTop Chord to Bottom Chord =
Top Chord to Post
Support Block to Post
'-Shear Block to Post
Rat Runs Q
Girts 2X6 tF-L41
@ 24" oc
X10 PT Baseboard
2
2
/20
d
Rti=4 (Z
Roofing & Siding
29 Guage Steel
DOUBLE TRUSS
Top Chord 2XIoDf-LZ
Bot Chord 21/0 Dr -/-1!t2-
i
` Webbing .. L Z
i;47
Bolts 3/4 "
_/I'
__'XGirliO
�'1 • • 1 C �i
Bolts u/16 nails $4
Bolts v/6 hails 164
Bolts w/6 nails161
Bolts w/6 nails16d
" oc EN0 Tb Ealu
Live Load 3D psf
Dead Load
Othr Load
Total Load
PLF 36
Truss Width 3o -o"
psf
a psf
35- psf
2-2X6 Blocking
6X 6 PT J ostg N -FL
.6 retension
TYPICAL CROSS SECTION
ecvo
Z
Nie
Concrete Sla
Nue
TfitafE