Loading...
2012, 10-30 Permit App: APR-2012-0069 Approachspokan'' e� jVailey� Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokaneva Iley.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION PROSECT ADDRESS: ..).6o s S . P+e re_e START DATE: l p _ 3 i ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: VJG- 4- L2_Z MAILING ADDRESS: zoos Pietr CITY: S pokA n c V STATE: . , ZIP: "t ct 2. 01,, CONTACT PERSON NAME: U/ C. PHONE: Sbc.k ' C1 • 3q 84) r FAX: CONTRACTOR NAME:' 6 10 ay CELL: c(, S ► - 3 9 60 Se fc. MAILING ADDRESS: .' 900 Li0 t.ciQ (VRI z -51K CITY: �+ I`S STATE v \(\ Zip CEL 50 9) q? / [4,6 �(!� CONTRACTOR LICENSE No.:I�Ao�sQ � S: Q -(9- )OI ITY BUSINESS LICENSE NO.: O45 -04 PRWECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway ( Commercial/Industrial Driveway PHONE:�c�� cvD y t Ss FAX: • Existing Curb & Gutter [f Culvert Installation O Other Conditions: 0 Rural Road Section 0. Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be sub - . and subsequently approved before this application can be processed. Signature Date: t b 3 Lv Updated 1-11-11 Page 1 of 1 http://www. spokaneva Iley.org/fi lestorage/124/938/210/948/ 1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale Drainage Ditch Drywell (show location on sketch) Other (please describe below) A e l l/ e wi z' uj ai CC ai CURB J zL ix a i i of EDGE OF J ASPHALT DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH I--4'-4----THROATWIDTH ®FT --1\ I--4' WING (SEE TABLE) WING STREET NAME 1 STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH �1 IF CORNER LOT, DISTANCE FROM CURB RETURN ZIFT (SEE TABLE) CURB RETURN I ----THROAT WIDTH n FT -1 (SEE TABLE) STREET NAME 15 RADIUS RADIUS RETURN NIF CORNER LOT, DISTANCE FROM RADIUS RETURN 0 FT (SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale RePc��� kKe, O Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) ►tic, r ll/e CURB 1 DISTANCE FROM INEAREST PROPERTY LINE SAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE , APPROACH 1--4'--1--THROATWIDTH ®FT --4 4' WING (SEE TABLE) WING STREET NA M E EDGE OF' ASPHALT STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH l --THROAT WIDTH n FT ---I (SEE TABLE) STREET NAME CURB RETURN NIF CORNER LOT, DISTANCE FROM CURB RETURN FT (SEE TABLE) 15 RADIUS RADIUS RETURN STREET WITH ASPHALT EDGE NIF CORNER LOT, DISTANCE FROM RADIUS RETURN FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' somorkan ...00•IvValley Development Engineering 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 2605 S Pierce Project No: APR -2012-69 Reviewed By: /lQ Date: )0A1//3-, Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: /lQ Date: )0A1//3-, 0 CQ U RECEiVED CSV PERr1IT CENTER COtt 0 c m O N l0 3 U 0 R G) .0 0 m E `0 E m E N 0 0.40 N a 40 40 N 0 T 40 R 0 O N O c G) 0) 0 O L c N 0 N 01 c 0 0. m E m E m c c m E 0 0 0 u B 4) R C) c 0) 0) 0) N l0 m E.0 F