Loading...
2008, 05-21 Permit App: 08001871 DeckProject Number: 08001871 Inv: I Application Date: 5/21/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Parcel Number: 44042.0808 Block: Lot: SiteAddress: 4510 S PIERCE CT Owner: Name: FOSTER, BILL Address: 4510 S PIERCE CT Location:: CSV SPOKANE, WA 99206 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: .. ,.,, Review Building Plan Review Released By: Originally Released: 5/19/2008 By: tmelbourn Landuse/Zoning/HE Conditions [Released By -- Originally Released: 5/20/2008 By: tschmidt Permits: Operator: JD Printed By: JD Print Date: 5/21/2008 Project Number: 08001871 Inv: I Application Date: 5/21/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: CLOW CONSTRUCTION INC Address: 1804 N HAYFORD RD SPOKANE WA 99224 Description Grp DECK OPEN R-3 Item Description RESIDENTIAL PERMIT FE WSBC SURCHARGE SF PLNS RVW < 7999 SQ F Building Permit Firm: CLOW CONSTRUCTION INC Phone: (509) 230-4487 E T This Application: Tyne Notes Sg Ft Valuation VB 200 SQFT 0 $3,924.21 Totals: 0 $3,924.21 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Total Project: Sg Ft Valuation 0 $3,924.21 0 $3,924.21 Fee Amount $97.25 $4.50 $38.90 Permit Total Fees: $140.65 Notes: Payment Summary .. .. . Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $140.65 $140.65 $0.00 $140.65 $140.65 $140.65 $0.00 $140.65 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: 3D Printed By: JD Print Date: 5/21/2008 Permit Center WA PERMIT NUMBER: 11703 E Sprague Ave, Suite B-3 Spokane Valley, 99206 PERMIT FEE: • , � y (509)688-0036 FAX: (509)688-0037 www.spokanevallev.org Community Development ❑ Residential Construction New Construction El Accessory Bldg Permit Application ❑ Addition/Remodel 5d Deck ❑ Other: SITE ADDRESS: �L(7 S �1G� GI Sf 6�/►!U �fi�'l�yt WI4 q�2 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: r3it-1- Address: S City; State: Zip: Phone- Fax: Contact Person Name: - LO Phone: - a U - Contractor: (�, L-0 W DIMENSIONS: 7 Name: !S�'/ r /,[J Address: 10011 , 1q,4yraeb RID . City: 5po��g�- State: Wk Zip: 91M Phone: �`P Fax: Contractor Lic No, • SGT Exp Date: F77'9usine ss Lic. No: FTG: A) n Describe the scope of work in detail: Cost of Project: $ Ma 4. Z, 'fif,Vriz, boa / ey h b eK9, �Eiu�✓� t� r 8 � (S Proposed Use: 9e�c�c�c�c�c�e9e�c**�r�c�cTl,n fn1Jn%w:nn MITQT hp rmmnlete- (write N/A if not annlieablel't********************* HEIGHT TOS DIMENSIONS: 7 # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2 NUFLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: A) n /vl/� 'AJ4- AREA: � I FINISHED BA F�IIIENT SQ. FTG: N NN GARAN �C�� �Q. FTG: T 0C . PATIO SQ. FTG: 2o% 30% SLOPES ON PRO ERTY: U # OF BEDROOM CONSTRUCTION TYPE: URCE: WE OR SEPTIC? (0+UV AA1VA1 t�--- NW The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) PI or addif al information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE:46I Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: Effective 10-28-07 Page I of I http://www.spokanevalicy.org/uploads/Community_DcvclopmenVDocuments/Forms/Building/Residential Building Permit App.doc Site Address: 4510 S PIERCE CT Parcel Number: 44042.0808 Zoning: R-2 Fire District: FD 08 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting El Plan revisions Transmittal Date: Monday, May 19, 2008 Project Number: 08001871 Water District: SPO CO WATER DIST#313 Applicant: CLOW CONSTRUCTION INC 1804 N HAYFORD RD SPOKANE WA 99224 (509) 230-4487 e-mail: Contact: CLOW CONSTRUCTION INC 1804 N HAYFORD RD SPOKANE WA 99224 (509) 230-4487 e-mail: Contractor. CLOW CONSTRUCTION INC 1804 N HAYFORD RD SPOKANE WA 99224 (509) 230-4487 Project 10 X 20 DECK Description: Owner. FOSTER, BILL 4510 S PIERCE CT SPOKANE, WA 99206 e-mail: Occupant. e-mail: Arch / Engineer. e-mail: MAY 1 Please send all plan review and project comments via e-mail to the highlighted individuals. SCITY pokane For City UseQnly PLUS Project Number �) J11-) ( Project Address T51 c) 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 �1 5. 91�RG� cT T>eLA- PLANNING DEPT. APPROVED BY: T P/4 ZL 109 NV W 4 d y `Sti ` 3'-p" meslewm T 36' irdnimmn t on c�g nnter. ions edgy of '.o ceoler of be 1-4f Jmmm r 2-X r a Girder lfgreeter lhm +'-ll" provide a min. of 40 braces at post - ie -beam connections (blexhoum Post Height shell not be more Wan 10 feel) Pat $' min ..r;FrE7. ;<•r' minimum if covered mit, Natural (trade_ 7' min to drylight ' maximsenclear L— Joist 2xF(,t6rroc Ietal besecap " min. above concrete or provide treated wood -minimum 2000 psi a footing 3" minimum 2000 psi concrete 3" Nal -F 36" mirdlonm H peeler Wa provide ■ m 4x4 bases to -berm new (Maximum Height shell more sea 1 Yost & Beam Connection detail (interior condition) Post Cep installed per manuflolurer's instruction Ig" min. i (4M) -. Knee brace 11" mist. (4x/) Two 1/2" diameter lag Kne in, bolts lop and bolters typical Poet etal basecep min. above concrete or pro ids treated wood �p 6" minimum res T Irlinimum ii' -wed Miter attachment mat be behed through Post & Beam Cotmecliou detail ost cap installed per mumtacimet'i Wstiodien IB" min. 24" man. (�M) overhangnea"A me nrmrwerrcxner..aarruonurt�rav _ .--'IeM . Two 1/2" diameter leg bolts tup nal bnllem trpicel OPEN RISER PERMIT7, ED -41N. SPHERE WILL NOT PASS THROUGH OR WHERE HEIGHT OF STAIR IS LESS THAN 30 INCHES 0 .o 0 IN. MIN GUARD HEIGHT PER SECT. R318. B IN. MAX FOR HANDRAIL PER SECT. 8318.1 101N. MIN RUN 0 -IN. SPHERE CANNOT PASSTHROUGH "UPMBTADIENPETO"TOAFI�-1IR�ORRlDMEfiIBg ONnnT me R 1w+DMnr Down waves ml.�AuoTrowc N MRAlL /IIHClQV1ARtO RL EDRA 10 11�irvT� enod invNOaT nmo*9 ORUo1YrAaM` OMEPINO 6UnPMACa TO TIE BPECIFIlO f1NCIRAR CRON off"Wa [aCULARKA.MP.AK.IRNONOMDVIAR�WAtRAA. TT►81 NAADRAII MAX. RISE 781,, IN. VARIATION OP RISER HEIGHTS OR TREAD DEPTHS SHALL NOT EXCEED %IN. l 8 PRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE Figure 8: Post -to -Beam Attachment Requirements (1)3xor4 (2) 2x be2 bean must be fully on 6x6 not 6x6 (2) 112" diameter thru- bolts with washers :h post to accomodate beam RIM JOIST REQUIREMENTS Attach a continuous rim joist to the ends of joists as shown in Figure 11. Attach decking to the rim joist as shown in Figure 11. For more decking attachment requirements, see DECKING REQUIREMENTS. Figure 11: Rim Joist Connection Details Figure 9: Prohibited Post -to -Beam Attachment Condition Figure 10: Alternate Approved Post -to -Beam Column Cap Attachment secure decking to top of rim joist with #10 x 3" minimum wood screw @ 6" o.c. NAILS NOT PERMITTED )ist to end of each joist with (5) #10 x 3" )od screws; NAILS NOT PERMITTED (the crews may be reduced to 3 if there is no guard luard post is present, its connection is per POST ATTACHMENT details) American Wood Council ZxZ'B�L41S � i�� 3' " S�'t�lN� p,G. ; �`'��"?"D►'C�� x�- __t__-ta Boi_ C mL DECKS: Ledger board requires '/2" lag bolt @ 16" o.c. with flashing behind. Guardrail 36 in. high required if floor more than 30 in. above grade. Picket spacing no more than 4 in. apart. Posts require approved base and beam connectors. Min. 24 in. frost protection to finish grade with min. 12 in. footing base. I q(o t i I ?�7� c�,e IANODOA s'TAII S - -10 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CST C('IFIAL THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED 1=��' E. a;= COMPLIANCE SPOKANE VA -=='w ; `' ')qN/3,.,DIVISION