2011, 06-16 Permit App: 11001733 Vehicle DamageProject Number: 11001733 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/16/2011 Page 1 of 2
Project Information:
Permit Use: VEHICLE DAMAGE
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 001740 Name: MYRON EST # 4
Parcel Number: 44042.0808 Block:
SiteAddress: 4510 S PIERCE CT
Location:: CSV
Contact: BELFOR USA
Address: 10020 E KNOX, SUITE 100
C - S - Z: SPOKANE, WA 99206
Phone: (509) 893-0001
Group Name:
Project Name:
Lot:
District: Sout
Owner: Name: FOSTER, BILL
Address: 4510 S PIERCE CT
SPOKANE VALLEY, WA 99206
Zoning: R-2 SF Res Suburban District
Water District: 101 SPO CO WATER DIST#3B Hold: I1
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Permits:
Released By:
Originally Released: 6/16/2011 By: tmelbourn
Building Permit
Contractor: BELFOR USA GROUP Firm: BELFOR CONSTRUCTION
Address: 10020 E. KNOX SUITE 100 Phone: (509) 893-0001
SPOKANE VALLEY, WA 99206
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB PLAN 0 $7,200.00 0 $7,200.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $7,200.00 0 $7,200.00
Units Unit Desc Fee Amount
1 SELECT $153.25
1 SELECT $4.50
1 SELECT $61.30
Permit Total Fees: $219.05
Operator: jmm Printed By: jmm Print Date: 6/16/2011
Project Number: 11001733 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/16/2011 Page 2 of 2
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$219.05 $219.05 $61.30 $157.75
$219.05 $219.05 $61.30 $157.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 6/16/2011
�/ rerrrn: t :mer
*Wane
11703 E Sprague Ave, Suite B-3
pWWane Spokane Valley, WA 99206
\a11ey ;, (509)L33-0036 FAX: (509)68S-0037
J w.\.vsl,. -- .anwa1 e,;.ori,
Community Dev<lopment i 7`3
Residential Construction J New Construytion
Permit Application [_ irk# ,:o3s; a model . .
i Other:
I PERMIT 1\41,71`M[3ER:
PERMIT FEE:
SITE ADDRESS: '4/670
S. 9, 4.2 G£ G2i-
ASSESSORS PARCEL NO:
Accessory Bldg
-Deco
LEGAL DESCRIPTION:
Building Owner:
Name: hi/ GL✓ Awnc-c,..,6re ?
Address. /7/ s...../0 s. VZen . uL.>
City peictiN `LY/9.G[ y State:u44 Zip: "9,zoe
Phone: 5-01, `1 Zq- 9 7Z0 Fax:
Contact Person
Name: L(%6 Ge.t� `'TD W E.
Phone: 6-05. —1 79— ery
Describe the scope of work in detail:
Contractor: 3g 01Z 1jd 4
Name: .6,4..,e'0 ie- us/q'
Address: /60Zen IvyO u <r: /Do
!
City: c ,e44/... State: t,(14_ Zip:,.rze;
Phone: Fax: 0004
Som I9� �I sv`r- 845
Contractor Lic No: Exp Date:
City Business Lic. No:
Cost of Project: $ Ze'o oo
S� An' G ASF p cS' cola
7-41,45.< fe.J /4z ' . ./26;.1i/2
Proposed Use:
**************Th followin MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"" FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
. '.
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will bo served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
❑ Mastercard
Expires:
DATE: Zo/(
0 VISA
VIN#:
Spokane
jUalley
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 4 Fax: 509.688.0037 ♦ cityhall@spokanevalley.org
Residential Plan Submittal Minimums
❑ Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
O Two sets of plans including Site Plan, elevations, floor plans, foundation plans
With details, roof plan, framing plans & details.
O Show the height of any proposed buildings or accessory structures.
❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
❑ All braced wall panel types: show locations and details of installation, including
engineered design.
O Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
❑ Smoke detector locations
O 22" X 30" attic access location
❑ 18" X 24" crawl space access:
O One-hour separation detail: between house and garage
O Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
O Furnace and hot water heater location.
❑ All header locations: type, size, and connections
O Foundation plan
O Insulation information
Spokane
Valley®
For City Use Only
PLUS Project Number �°,' / 7
Project Address ` %? yr t y
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
!i
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07