Loading...
2004, 07-19 Permit: ROW-04-540 ROW Inspections performed 10 days after scheduled completion to schedule call (509)688-0195 or Fax(509)688-0037. Any re- CITY fie inspection will incur an additional$25.00 0 charge. 11707E Sprague Ave, Suite 106 Spokane Valley,WA 99206 ROW Construction Permit Permit# ROW 04-540 Issue Date 7/19/2004 Account# Completion Date Issued by Ddompier Construction Utility Location of Property Project Description 0 0 14709 E QUEEN AVE driveway Comments CONSTRUCT NEW DRIVEWAY Applicant HARLEY DOUGLAS Contractor Name CRN # Individual Name INDIVIDUAL Address Contractor Phone# Bond Origination Date Bond $ Account# $0.00 Permit Fee Inspection Fee Total Fees Collected $25.00 $25.00 $50.0' , Permittee Signature Approved 01'i i i f:: Date [�(CJ I hereby authorize the City of Spokane Valley to charge the fee for this permit to my credit card. Credit Card# Expiration Date Name of Holder Signature In addition to the permit application fee of$16.00(utility)or$25.00(construction),inspection on each permit will be billed to the permittee at a rate of$50.00 per hour with a$25.00(1/2 hour) minimum. Permittee signature constitutes an agreement to these terms and provisions. Work completed satisfactorily(signed) Date I Pi! PERMIT MUST BE KEPT ON SITE G� ClC� t) 1) 1 • Cail 24 hours before inspection required Phone 509.688-0036 Fax 509.688-0037 Sj$ókane 4,000Vley DEPARTMENT OF PUBLIC WORKS r. Anticipated start date Permit # PW APPROACH PERMIT APPLICATION Location of property 14709 E Queen 46354.4406 (Address/Parcel #, if available) Applicant Name Harley C Douglass Inc Address 8510 N Crestline Spokane 99217 Phone 509 487-9792 Contractor's Name Address Phone Contractor's Reg# Expires • PROJECT DESCRIPTION (Provide site sketch) ViResidential Driveway Commercial/Industrial Driveway Existing Curb & Gutter Rural Road Section Culvert Installation Sidewalk Repair/Construction Other conditions See construction requirements and details on reverse. Bond/insurance certification must be on file with the City. SPECIAL CONDITIONS: • PERMIT FEE $ Inspection Fee$ I hereby authorize the City of Spokane Valley to charge the fee for this permit to my credit card. Card# Expiration Date Name of Holder Signature Fees Paid$ Date !nit Excerpts from Spokane Valley Standards (3.241 and details A8 and A-8a): • • Every driveway approach must provide access to an off road parking area located on private property. The driveway shall be of sufficient length so a vehicle in the driveway does not project into the road right of way, sidewalk, or pathway. • Public or private driveways in industrial, commercial, multiple family, church or any like use shall be constructed to allow vehicles to exit without backing onto a public road. • Driveway approaches shall be constructed to avoid interference with existing drainage inletq, culverts, road lighting standards, utility poles, traffic regulating devices, fire hydrants or other public utilities. The applicant shall bear the cost of relocating any such public facility. • Driveway approach grades within the right of way shall not exceed 8% In urban area, or 2% in rural areas. Driveway grades shall not exceed 10%within ten feet of a city right of way. See Standards for a more complete listing of requirements. • • 11 1.1 ti:. ' I 111! 5 11 I:144 6II iiiii § ,Il lilt • +� It'll i {o 4T '. :;,-I tr • 4—6. i `e as "�-r ec II IP . I • IJ 1 w t ill 0 i 1 IL . i is IIP .11 11------- �� i : . -1---ill i o 4, li I a L t r is a i C , wo ' • r uiR ` '` ( ' ,a ZS ` ILS I , �' Z Iar II: • i. ice_ 1 I ..