Loading...
2011, 06-07 Permit App: 11001618 Residence E•CizglitirRevelopmerit Department (Staff Use Only) C!TYOF " y� -, ^_`.d t �'t193 ue Av:•nue, Suite B-3 PERMIT NUMBER:7�/(/,./ POrl; �$ ar� 11�VA 99.06 yl f ::,:.45 it 88-0036 PERMIT FEE: Ai �� '�� .�.j88 0037 11U 44 -��u_ • .er s.okane aIle .or. 4111110.111* Dame f Submittal# RESI i ` "ii"--' • T ON PERMIT APPLICATION 7 . NEW CONSTRUCTION [] ADDITION/REMODEL ' ACCESSORY BUILDING 0 DECK ,, Q OTHER SITE ADDRESS: qz-/ s, 4C0MO+JQ ASSESSORS PARCEL NO.:45,104F .Ill 5 -7 LEGAL DESCRIPTION: BUILDING OWNER NAME:SN.F'1 egoe6p-ries 1 —c- NAME: �j ADDRESS: 3410 E %. 1 �� A CITY: s���/�/Ji.V44ei( STATE: W/1--- ZIP:I,—� V 4 PHONE: C;7/5---0/ S FAX: eel .IL)6 "5 CELL: —' CONTACT NAME ^J/(' r,l 5 PHONE: //S ""O7 53 FAX: CELL: CONTRACTOR NAME: 7 L �i{f7�� l Si? 'JGfr/O..J MAILING ADDRESS: ;642- 5 t Sorl)96 i-v'1N0 • CITY: Secle-49JC VA1STATE: 414 ZIP: ?9. -t9--c. PHONE: /51..---- 01se) FAX: 0.0/-"S(7 6 l CELL: 9/'S/---0-2 S'33 CONTRACTOR LICENSE No.: 7 4*7 qL(#'$1 PIRES: 7/3//f CITY BUSINESS LICENSE NO.:AP,Z,ST3 1. 13 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: A.)k.4.) 00,1446 ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Heig t to P Dimensions: No. of Stories: Total Habitable 57 P(C) � Space: �'l,' �7i Main l or S FT:,/p.JL Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ ��JJ 0 ' FT: FT: --- Garage SQ FT: Dec overed do SQ Impervious Surface 30%Slopes on 7/ FT: Area: f0bv Property: N0 No. of Bedrooms: �j Const o Type: Heat Source:ZAswerbr Septic: TOTAL COST OF PROJECT: $ 3 60, c13 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be r uired to be submitted and subsequently approved before this application can be processed. Signature Date: Ca// Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: , • Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location &sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: ❑ Floor Joist direction, size and spacing ❑Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Ridge, eave and valley lines ❑ Rafter and over frame direction, size and spacing ❑ Beam and girder size and location ❑ Wall Section Detail including: Roof ❑ Slope/roofing material/underlayment/ice dam protection ❑ Truss or rafter size, spacing &connection ❑ Sheathing size and type ❑Attic insulation/air space baffle/ventilation Ceiling ❑ Joist size and spacing ❑ Size of ceiling gypsum wall board Wall ❑ Height/top plate/stud size and spacing/sole plate ❑ Siding/exterior house wrap/anchor bolts ❑ Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board Floor ❑ Joist size and spacing ❑ Sheathing or concrete floor size/insulation Foundation Wall ❑ Concrete or Masonry unit width ❑ Footing bottom to finished ground level depth ❑ Earth to wood separation distance ❑ Horizontal &vertical reinforcement if any Footing ❑ Size ❑ Reinforcement if any Radon ❑ Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations ❑ Floor Joist/decking direction, size and spacing ❑ Stairway tread rise &run and nosing ❑ Handrail/Guard height&spacing Permit Center 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 40 (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenterspokanevalley.org Community Development Plumbing Permit Application ❑ Commercial /1 Residential SITE ADDRESS: '7Z S, i� - ' 4 Building Owner Name:Sunshine Health Facilities Phone:509-995-0753 Fax:509-209-9063 Address: 10410 E 9th Ave City:Spokane Valley State:WA Zip:99206 Contractor Name:Tamarack Ridge Construction Phone:(509)995-0753 Fax:(509)209-9063 Address:3622 S.Sunderland City:Spokane State:WA Zip:99206 License No:TAMARRC921MU City Business Lic:602 523 413 Contact/Project Manager: Name:Jon Hawley Phone:(509)922-0753 #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 10 URINALS TUBS SHOWERS(per trap) 8 Lay/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat 12 DISHWASHER 2 CLOTHES WASHER 2 GARBAGE DISPOSAL 2 WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical 2 INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE (mer than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ['CASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT: http://www.spokanevallev.oro/under the quick links for Forms,Master Fee Schedule. C:\Users\jon\Documents\Tamarack Ridge\Projects\Duplex\Permit\SpokaneValleyPlumbing Permit(from Laptop).doc Permit Center SOkann00'e 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: P Spokane Valley,WA 99206 jValley (5091688-0036.FAX:(509)688-0037 PERMIT FEE: Community Development permitcenter(aspokanevalley.org Mechanical Permit Application 'A�mmercial R I:esidential SITE ADDRESS: (j c reoty-nepc Building Owner coil p � Name: Phone: �y ,',' �;..�� '7`r�0 '� Fax: '(� ',--4F0,405 Address: f 4.0 a, � City: /(4,State:G,P/� Zip: 7Gj ,6 Contractor' ret ✓0114- _4, A ,„vs/xi (�`7� / Name: / C.G/ hone: (�j Q ��.7 Fax: 7,07.-?D62 Address: 3i 791 '1 e� ... _ _/��/4 4/ City: .(a/ �� '`/ tate: /A�Q� Zip: ?�'e,(}(, License No: mill//lf,/�V,'6_qc [ •wl City BdsmesssLiic��`��` „)„. �`3 ✓•41 Contact/Project[ Manager - 7e „/ Name: )041 1"1:A / Phone: F #U N ITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM Ii HEAT PUMP/AIR CONDITIONER 0-3 TON ?•••*--- AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON _ AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT 2.-- REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp-100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15-30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp-over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM-FREE STANDING EXPIRES: VIN: ❑CASH ❑CHECK ❑VISA ❑MC CARD#: SIGNATURE http://wwwspokanevalley.org/uploads/Community Community Development Department (Staff Use Only) Permit Center / //w 1 STY0n1 11703 East Sprague Avenue, Suite B 3 PERMIT NUMBER: !poane v Spokane Valley, WA 99206 Valley Tel: (509) 688-0036 PERMIT FEE: 4000 xFax: (509) 688-0037 permitcenter@spokanevallev.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: IL( SI r , 11 5to START DATE: ANTICIPATED COMPLETION DATE: /U'Od 2") 17 BUILDING OWNER NAME: A MAILING ADDRESS: laft° CI q ,I, CITY: $p f 4%.6-"Iq4/ t TATE: v ZIP: gl CONTACT PERSON NAME: N �� V/k PHONE: y �75-� L FAX: '/-'o&S CELL: -- CONTRACTOR NAME: 1;4 4y7,4a -qh taar, W 'zI' -(yU o� c' .- - MAILING ADDRESS: 5 6 2-)-- c� 42{(, -(//44101 CITY:® ill STATE: /Or ,j ZIP: 41/40 ,b PHONE: 911r----015-3. FAX: CJS' cc763 CELL: CONTRACTOR LICENSE No.: t441 4410`?Z//try EXPIRES: 1 13/ 11 CITY BUSINESS LICENSE NO.: 60245234 r3 PROJECT DESCRIPTION (Please«I Provide Site Sketch) Residential Driveway Commercial/Industrial Driveway ill Existing Curb & Gutter El Rural Road Section Culvert Installation Q Sidewalk Repair/Construction Q Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be qui to be submitted and subsequently approved before this application can be processed. Signature Date: 617// Updated 1-11-11 Page 1 of 1 http://www.spokaneva I ley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION • REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ❑ Drainage Ditch ft wide ❑ Drywell (show location on sketch) ft from back of curb ❑ Other (please describe below) ❑ Streetside Swale ;l;l DISTANCE FROM z: NEAREST PROPERTY LINE LiMAY BE LEFT OR RIGHT SIDE) FT(SEE TABLE) w d1 c APPROACHCONCRETE 7RCEUTRN ' THROAEID BQFT—CURB' NGELNGNIF CORNER LOT, DISTANCE FROM STREET NAME CURB RETURN n FT(SEE TABLE) STREET WITH CURB w I DISTANCE FROM � - - NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT(SEE TABLE) a.i 15'RADIUS o ASPHALT RADIUS al APPROACH RETURN EDGE OF [—THROAT EID BLnFT--- NIF CORNER LOT, ASPHALT DISTANCE FROM STREET NAME RADIUS RETURN Q FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured See Page 7-27 from centerline to centerline of each None specified in City Street Standards approach) Throat Width (flat portion) 16'min., 30'max. 30'min., 40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' 10, CIT, e Development Engineering `alley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org Approach Permit Applation Review RECEIVED TO: Building Department JUN 0 8 2011 Site Address: 923 & 925 S. Raymond Rd. Project No: 11-1618 J Spokane Valley 2errnit Center Accepted Not Accepted Approach *X Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. *Driveway must be 20' wide due to length exceeding 75' per City Standards. Reviewed By: X"rice -4Efr - Date: /7/// 1,15'-0" 57'-6" 57'-6" 20'-0" / a North Prop rty Line'150' 5'Min.Side Yard Set back o� ! 15'Min.Front Yard Setback -----i---....._, in In 20'Min.Rear Yard Setback l/ m/ to m • i4,-fzi -/' 7/7 ee Q' 1/ �. Proposed-Duplex 0 0. c e Pk � �er�Gi iQ,�tA)��� � 411 a �'n tu �° ••• • •• firm. 0' —) ♦.♦♦♦.?�O♦♦ ♦♦.♦•♦*♦♦♦ ♦ ♦♦ ..♦♦♦♦♦♦ ♦.♦♦.. o May t'I� tf4: '',;1*.' r�t-9}.'i".( . .A- . •-- C.^rA.hr^' C O `/- / 0 .iLi`►.ii ..i�♦v.i�".r�Li+ii...+viv�.f• •♦♦1�!:d j1 kfiii V�i!*1�Y� �l'i♦i�i4 i Ns- •i♦i�40. •i►.,,. • •♦�.•♦♦♦•♦♦+•♦♦♦�♦♦O♦♦.♦.♦.♦i�i•�0.�.+i♦•�♦°.•i♦i♦ •♦•ice♦♦♦� it> NV te. .*i!f!o:'talk♦!♦!♦-44%!i. .•-♦!at•-•4t. ...+I..!♦!♦!♦!♦!.!♦!.!i!♦!.•....! M ��� ,.<1-- 20'Min.Rear Yard Setback ' . 11114 5'Min.Side Yard Setback {� L� 5'Min.Side Yard Setback ■ , _,,,, o 1 J P r iposed-Duplex .'' to � m O CD ` D. a 0 a a ;n w 15'Min.Front Yard Setback —7 South Prope► y ine 15(y . a . , "' 5'Min.Side Yard Set back City of Spokane Valley .i— ,, , Vs F Fire District l S).. y ^=K .,;_ C_x 4, = I Spokane County Water District : Legal: 20-25-44 University Place TL8 TOG wls 112 of LT 9 Block 10 ! , -:. ,, Parcel No: 45204.1137(existing house site) I ;�,i ' . ` ' Property Area(both parcels) 22,500 S.F. 45204.1136(vacant land) prcj:act:- i ' Building Area �t. Habitable Space: 9840 S.F. Zone: R3 Main Address: 925 S.Raymond Road-City of Spokane Valley,WAName Garages: 1428 S.F. Sewer located in Raymond Road t Submittal s10o t-_ - ____i____________________...— .._ Health Plan Sunshine Healt ;R1 ID RIK TCA0ROD ELL ARC d IT£CTS 'j� ' ` !` ' Facilites Project number _.._ .._._.. 1012'-.._._..-w_— A is,Howard Street I Salta SDS I Spekana,We"binpt"n 89301 IN.— ma Moms ROUE- Date 24 February 2011 A0.0 Voice: 509.838.7474 I Fax 508.4 56.5190 I *Ww.k1rkwooa rotten.coal SIVE OF=Him= Sunshine Duplexes I i 1 gala '' lStr-(1 Spokane jUalley For City Use Only PLUS Project Number / r' vtyr Project Address ✓' t(;t -t t 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07