Loading...
HomeMy WebLinkAbout2008, 07-28 Permit App: 08002905 Remodel Permit Center cm OF17 11703 E Sprab e Ave, Suite B-3 PERMIT NUMBER: ,7. ,-��� Spokane Spokane Valley,WA 99206 PERMIT FEE: jValley. (509)688-0036 FAX:(509)688-0037 ' t i-Y www.spokanevalley.org JUL 2006 Community Development V Residential Construction INIewonstruction cessory Bldg iY: Permit Application TtAddition7Remodel Reck Other: SITE ADDRESS: I-...? /L5 .S6 ; /(7.,L,,..3�t,/(7.,L,,..3Ji'L en-yt el Xof y ,��� //4- , •{...__ 116. � ?-� � <'i,-,m6 ASSESSORS PARCEL NO: �A C�4-- I, 31 E LEGAL DESCRIPTION: Fie,yr) Building Owner: Contractor: Name: 0 e Name: ,..re",//7‹._. /.7 �r /, n, 1/1 1� Yt Address ,- / Address: spa r. a yin , r, rf i State: ./ �/ Zip- City: State: Zip: City-J .s A61 rl s- (/A. //-1 Wit, �� •G6- Fax: Phone: Fax: Phon452 )2r7 -.-9 Y 6 Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: CD L, , >. Phone: Describe the scope of work in detail: Cost of Project: $ j i ie,-e, b / iit/ Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: i„645 ' PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. SIGNATURE: DATE: Method of Payment: 0 Cash ❑ Check 0 Mastercard El VISA Bankcard#: Expires: VIN#: Authorized Signature: �p REVISED 2/15/07 `/'//J / Stiowane 11703 E Sprague AveSuite B-3♦ Spokane Valley WA99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • 4 °Valle y ❑X Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. ❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. ❑X Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details MX Furnace and hot water heater location ❑X All header locations: type, size and connections ❑X Foundation plan ❑X Insulation information ❑X Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage ( Project New project Previous pre-app meeting AP-NCIpoxane Transmittal Plan revisions City of Spokane Valley Transmittal Date: .0001Flialley Communih Development Monday,July 28,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 1310 S RAYMOND RD Project Number: 08002905 Parcel Number: 45204.2318 Zoning: R-3 Water District: SPO CO WATER DIST#3B Fire District: FD 01 Applicant: DUNCAN, GEORGE A Owner: DUNCAN, GEORGE A 1310 S RAYMOND RD 1310 S RAYMOND RD SPOKANE VALLEY. WA 99206-343 SPOKANE VALLEY. WA 99206-343 (509) 217-2872 e-mail: e-mail: Contact: DUNCAN, GEORGE A Occupant: 1310 S RAYMOND RD SPOKANE VALLEY, WA 99206-343 e-mail: I�� tl 1— (509) 217-2872 e-mail: — JUL 28 2008 " Contractor: OWNER Arch/Engineer: , ) 'IjI I ,1 ;a I \ ( ) - 0 e-mail: Project REMODEL DECK Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLANS SITE PLANE TDS t Please send all plan review and project comments via e-mail to the highlighted individuals. r • New project ❑ 000.4sta... s Project t Previous pre-app meeting poiane ,_ SurnTransmittal El Plan revisions City of Spokane Valley Transmittal Date: 4.0000Valley Community Development Monday,July 28,2008 Department 11703 E. Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 1310 S RAYMOND RD Project Number: 08002905 Parcel Number: 45204.2318 Zoning: R-3 Water District: SPO CO WATER DIST#3 Fire District: FD 01 Applicant: DUNCAN, GEORGE A Owner: DUN A RGE A 1310 S RAYMOND RD 1 0 RAYMOND RD SPOKANE VALLEY, WA 99206-343 E VALLEY, WA 99206-343 (509) 217-2872 e-mail: e- ail. Contact: DUNCAN, GEORGE A t: 1310 S RAYMOND RD -mail: SPOKANE VALLEY, WA 99206-343 (509) 217-2872 e-mail: Contractor: OWNER Arch/Engineer: ( ) - 0 e-mail: Project REMODEL DECK Description: . Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION l 1 CONSTRUCTION PLANS j 1 SITE PLANS TDS ` Please send all plan review and project comments via e-mail to the highlighted individuals. 01.E 1,11,'14'),'� t;J 3`.. cf37� S i. Sjiökane o�L `�a11ey® 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org Code Violation — Municipal Code WARNING NOTICE 1310 South Raymond Avenue CONDITIONS AT THIS ADDRESS ARE IN VIOLATION OF THE ADOPTED CITY OF SPOKANE VALLEY MUNICIPAL CODE, AS SPECIFIED BELOW: 1. Description of Violation(s) and Action(s) Required to Comply: 1.Attached structure is being completed without the proper building permits Action(s) Required to Comply: 1. Obtain proper permits through City of Spokane Valley for all projects that have been started and completed. 4.0 ( . '7 (9-2 (2 p 2. Compliance Deadline(s)s You have fourteen4) days from the date of this warning to correct the violation(s) identified, or to enter into a voluntary compliance agreement with the City. Failure to act within fourteen days will necessitate the issuance of a Notice and Order, as set forth in Spokane Valley Uniform Development Code Section 17.100. If you choose to correct the violation, please contact the Spokane Valley Building Division at (509) 688-0201 correction verification inspection. 3. Consequences of Notice and Order: The City's issuance of a Notice and Order is accompanied by monetary civil penalties for Code violations developed for remedial purposes, and begin at Five Hundred ($500.00) dollars per violation. Each violation constitutes a separate fine. 4. Specific code section(s) and code authority: } � (7 6a1 Specific Code Section: Page 1 of 2 For City Use 99n1y sookane OF PLUS Project Number Project Address 4000 a 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 _ _ 5 i P / 1-- y....._, _, -,, ,_.__.___...,..__=,...,__.______ , (,._._ ,c, , s'Fi• - ; ..i. ,---- ir ; I , . 1 . ' . f----' . •--.-. : i -f 1 . I I( I 11H-----"‹ ,- C.) 4-1) 7 n : _ LI \ ; , t— ' 7 ,,A ,) ' I II i 1 L. , ,/-7,_)/<:..) ,j_., icu...1 j,r,.!,--r, _:ii j•(! ( i i 1 i , I r Jr- k .., i/J./ 7i :3 Z-1, , / - /------ / . ViA7 , , 1 I , , 1 . , . __ Al('7(::-;' E I, <_ < ; 1' i i ; / i A" --- ___--------\ ' _:-;. 1 4 i . H 4 1 ' : ii 1 i iIII SITE , i' PLAN OF RECORD 1 APPROVED BY:. , 1 I) i 7)4.A--41_-- 1 -0.0 s- c -y- a) - IT'------- ‘r 4- ' i I DATE ___ 7/3o/ g I PROJECT A, 7)3190.A47-2---57 ._ -). ..... 4.......________, -------'___ 4 , -4C-------- ReLy /1. 02.7 el \� k \ i._ it.,_\ ,,,_.....____L_______., ,_,, .t.. ,...,.. . LS • (In 0,,-/- y � i� ' SU 1 � ., , \ _________--- 1.1.(i ______----- 7----------___.- r ..------ ---. ,,r.(7/7/7.....; , i < � _ l J - ‘,) . ( I .,/ 1 Cs tic 1 F,..._ - —_(- L, • h