HomeMy WebLinkAbout2008, 07-28 Permit App: 08002905 Remodel Permit Center
cm OF17 11703 E Sprab e Ave, Suite B-3 PERMIT NUMBER: ,7. ,-���
Spokane Spokane Valley,WA 99206 PERMIT FEE:
jValley. (509)688-0036 FAX:(509)688-0037 ' t i-Y
www.spokanevalley.org JUL 2006
Community Development V
Residential Construction INIewonstruction cessory Bldg
iY:
Permit Application TtAddition7Remodel Reck
Other:
SITE ADDRESS: I-...? /L5 .S6 ; /(7.,L,,..3�t,/(7.,L,,..3Ji'L en-yt el Xof y
,��� //4- , •{...__ 116. � ?-� � <'i,-,m6
ASSESSORS PARCEL NO: �A C�4-- I, 31 E LEGAL DESCRIPTION: Fie,yr)
Building Owner: Contractor:
Name: 0 e
Name: ,..re",//7‹._. /.7 �r /, n, 1/1 1� Yt
Address ,- / Address:
spa r. a yin , r, rf i
State: ./ �/ Zip- City: State: Zip:
City-J .s A61 rl s- (/A. //-1 Wit,
�� •G6-
Fax: Phone: Fax:
Phon452 )2r7 -.-9 Y 6
Contractor Lic No: Exp Date:
Contact Person City Business Lic.No:
Name: CD L, , >.
Phone:
Describe the scope of work in detail: Cost of Project: $ j i
ie,-e, b / iit/
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ. 2ND
FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: i„645 ' PROPERTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before
this application can be processed.
SIGNATURE: DATE:
Method of Payment:
0 Cash ❑ Check 0 Mastercard El VISA
Bankcard#: Expires: VIN#:
Authorized Signature: �p
REVISED 2/15/07 `/'//J
/
Stiowane 11703 E Sprague AveSuite B-3♦ Spokane Valley WA99206
♦509.688.0036 ♦ Fax: 509.688.0037 •
4 °Valle
y
❑X Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
❑X Show the height of any proposed buildings or accessory structures.
❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
❑X Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
❑X Floor framing details: Joist type, size, spacing and installation details.
❑X Roof framing plan and details
MX Furnace and hot water heater location
❑X All header locations: type, size and connections
❑X Foundation plan
❑X Insulation information
❑X Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One-hour separation detail: between house and garage
( Project New project
Previous pre-app meeting
AP-NCIpoxane Transmittal Plan revisions
City of Spokane Valley Transmittal Date:
.0001Flialley
Communih Development Monday,July 28,2008
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 1310 S RAYMOND RD Project Number: 08002905
Parcel Number: 45204.2318
Zoning: R-3 Water District: SPO CO WATER DIST#3B
Fire District: FD 01
Applicant: DUNCAN, GEORGE A Owner: DUNCAN, GEORGE A
1310 S RAYMOND RD 1310 S RAYMOND RD
SPOKANE VALLEY. WA 99206-343 SPOKANE VALLEY. WA 99206-343
(509) 217-2872
e-mail: e-mail:
Contact: DUNCAN, GEORGE A Occupant:
1310 S RAYMOND RD
SPOKANE VALLEY, WA 99206-343 e-mail: I�� tl 1—
(509) 217-2872
e-mail: — JUL 28 2008 "
Contractor: OWNER Arch/Engineer:
, ) 'IjI I ,1 ;a I \
( ) - 0
e-mail:
Project REMODEL DECK
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION
CONSTRUCTION PLANS
SITE PLANE
TDS t
Please send all plan review and project comments via e-mail to the
highlighted individuals.
r • New project ❑
000.4sta...
s Project
t Previous pre-app meeting
poiane
,_
SurnTransmittal El
Plan revisions
City of Spokane Valley Transmittal Date:
4.0000Valley
Community Development Monday,July 28,2008
Department
11703 E. Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 1310 S RAYMOND RD Project Number: 08002905
Parcel Number: 45204.2318
Zoning: R-3 Water District: SPO CO WATER DIST#3
Fire District: FD 01
Applicant: DUNCAN, GEORGE A Owner: DUN A RGE A
1310 S RAYMOND RD 1 0 RAYMOND RD
SPOKANE VALLEY, WA 99206-343 E VALLEY, WA 99206-343
(509) 217-2872
e-mail: e- ail.
Contact: DUNCAN, GEORGE A t:
1310 S RAYMOND RD -mail:
SPOKANE VALLEY, WA 99206-343
(509) 217-2872
e-mail:
Contractor: OWNER Arch/Engineer:
( ) - 0
e-mail:
Project REMODEL DECK
Description:
.
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION l 1
CONSTRUCTION PLANS j 1
SITE PLANS
TDS `
Please send all plan review and project comments via e-mail to the
highlighted individuals.
01.E 1,11,'14'),'� t;J 3`..
cf37� S
i.
Sjiökane o�L
`�a11ey®
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org
Code Violation — Municipal Code
WARNING NOTICE
1310 South Raymond Avenue
CONDITIONS AT THIS ADDRESS ARE IN VIOLATION OF THE ADOPTED CITY
OF SPOKANE VALLEY MUNICIPAL CODE, AS SPECIFIED BELOW:
1. Description of Violation(s) and Action(s) Required to Comply:
1.Attached structure is being completed without the proper building permits
Action(s) Required to Comply:
1. Obtain proper permits through City of Spokane Valley for all projects that have been
started and completed.
4.0
( .
'7 (9-2 (2 p
2. Compliance Deadline(s)s
You have fourteen4) days from the date of this warning to correct the
violation(s) identified, or to enter into a voluntary compliance agreement with
the City. Failure to act within fourteen days will necessitate the issuance of a
Notice and Order, as set forth in Spokane Valley Uniform Development Code
Section 17.100. If you choose to correct the violation, please contact the
Spokane Valley Building Division at (509) 688-0201 correction verification
inspection.
3. Consequences of Notice and Order:
The City's issuance of a Notice and Order is accompanied by monetary civil
penalties for Code violations developed for remedial purposes, and begin at
Five Hundred ($500.00) dollars per violation. Each violation constitutes a
separate fine.
4. Specific code section(s) and code authority: }
� (7 6a1
Specific Code Section:
Page 1 of 2
For City Use 99n1y
sookane OF PLUS Project Number
Project Address
4000 a
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
_ _
5 i P / 1-- y....._,
_,
-,, ,_.__.___...,..__=,...,__.______ ,
(,._._ ,c, , s'Fi• - ;
..i.
,----
ir
;
I ,
.
1 .
'
. f----'
. •--.-. : i -f 1 .
I I(
I
11H-----"‹ ,- C.)
4-1)
7
n : _
LI
\ ; ,
t— ' 7 ,,A ,) '
I II i 1 L.
, ,/-7,_)/<:..) ,j_., icu...1 j,r,.!,--r, _:ii j•(! ( i
i
1
i , I
r Jr- k
..,
i/J./ 7i :3 Z-1, , /
- /------ / .
ViA7
, , 1
I ,
, 1 .
,
. __ Al('7(::-;' E I, <_ < ; 1' i i ;
/ i A" --- ___--------\ '
_:-;.
1 4
i . H
4
1 ' : ii
1 i
iIII SITE ,
i'
PLAN OF RECORD 1
APPROVED BY:. , 1 I) i
7)4.A--41_-- 1 -0.0 s- c -y- a) - IT'------- ‘r 4- '
i
I
DATE ___ 7/3o/ g
I
PROJECT A, 7)3190.A47-2---57 ._
-).
..... 4.......________,
-------'___ 4 ,
-4C-------- ReLy /1. 02.7 el
\� k
\ i._ it.,_\
,,,_.....____L_______.,
,_,,
.t..
,...,.. .
LS • (In 0,,-/- y � i� ' SU 1 � ., , \
_________--- 1.1.(i ______----- 7----------___.-
r
..------ ---. ,,r.(7/7/7.....;
, i <
� _
l J
-
‘,) . (
I .,/
1 Cs
tic 1 F,..._
-
—_(-
L, •
h