2012, 11-14 Permit: SW-120002552 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002552
Permit Issued Date:
11/14/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GRANDVIEW ACRES
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
BURGARD, ANDY G & CONSTANCE M
BURGARD, ANDY G & CONSTANCE M
709 W ORCHARD
COLFAX, WA 99111
509-869-0546
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
11927 E RAILROAD CIR
45044.1207
PINES WEST FIRST
ADDITION
PINES WEST 1ST ADD L7 B2
Water District: Irvin
Water District #6
Owner:
Address:
Phone:
Email:
BURGARD, ANDY G & CONSTANCE M
709 W ORCHARD
COLFAX, WA 99111
509-869-0546
Fire District: Spokane Valley Fire
Land Area: 11482.3 Square Feet
CONTRACTOR INFORMATION:
Owner Acting As Builder
OWNER
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS
SAME, WA 00000
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 11/14/2012 12:10:54
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
• Permit Issued Date:
Application Number: SW -12002552 11/14/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 11/14/2012 12:10:54
Printed by: IIS APPPOOL\SmartGovProdApp