Loading...
2014, 06-02 Permit App: BLD-2014-1259 Pole BldgSpokane jValleya Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@sookanevallev.orq //'-d' "v14/(7 - 6 - RESIDENTIAL CONSTRUCTION PERMIT El NEW CONSTRUCTION ID ADDITION/REMODEL NI DECK'' IN OTHER SITE ADDRESS: 4:6I b 1) taVj I l Pr • ASSESSORS PARCEL NO.: i7 /L//. 4/2//9 LEGAL DESCRIPTION: . 4/yde, /r., I° i`/6 / 1s> BUILDING OWNER NAME: '8( (Staff Use Only) Project' #_ PERMIT Nt:E 1 V E D PERMIT FEE: JuN 0 2 2011 CSV PERMIT CENTER qiNV CtSsORY BUILDING NAME: 7 _, )1't4 ,c- i fY! A/G�/�Pi d N. r\ ADDRESS: ! �j AV A I/I / Dr` CITY: nl�I(' / / €' VA I l�i Ij PHONE: 3O9'- q -y / a_s CONTACT NAME: STATE: FAX: WA/ ZIP: 9' 90,E 7 CELL:J-09I- -7'// PHONE: FAX: CELL: CONTRACTOR NAME: 2/ 7 pr MAILING ADDRESS: ! 7©a c,J'p gej CITY: PHONE: spok, dLJ Vx)/lei STATE: FAX: •r *s'i �G CONTRACTOR LICENSE No.: 2_1 !_ 6 / EXPIRES: CELL: ZIP:. o yo27 CITY BUSINESS LICENSE NO.:' DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: t Dimensions: 4/ K `f No. of Stories: t I Total Habitable Space: Main Flopr SQ FT: ` r& / G S 7 Upper Floor SQ FT: Unfinished Baseme SQ FT: N'9- Finished Basement SQ FT: Garage SQ FT: G /6 51 Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently a•proved before this application can be processed. Signature Date: //e/ir Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit= _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN ❑ Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing )/' N, C Project Sa)-----16f'/ —'OG RECEIVED Spo"rlneJUN o 2 2014 4.0*Valley- SV PERMIT CET! T ERomm SUB # RFS,'. Spokane Valley Municipal Code (SVMC) Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use. Residential Driveway PAVING WAIVER unity Development — Planning Division )3 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 6 ♦ Fax: 509.688.0037 • planning®spokanevalley.orq — OWNER INFORMATION OWNER NAME: r/! , ,„ ,,,c, i T q ., /v I,,,,,PARCEL #: s...5-7 y/ /�� q ADDRESS: 8( 6 N. , gig_ vi4. l/1 0r' CITY: Spb 3hjQ. (4._//e. STATE:/), ZIP: 77o_527 3`a qV PHONE: (,2 d / 7,25 FAX: 5-07 CELL: U - 741 EMAIL: A)//1. - PART PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? 111 -YES ❑ NO 2. Is the proposed detached structure used for storage only? ❑'4ES ❑ NO 3. Do you plan on using the detached structure to park vehicles? YES ❑ NO If yes, then what type of vehicles? F1) / Tv 4. Do you plan to conduct a business from proposed detached structure? ❑ YES EI 1JO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME) Pio /Ad owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to the Spokane Valley Community Development Department, Planning Division, within 30 days. &2—�y Date Owner Sign ure PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF HE eW COMMUNITY/DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS GRANTED AT SAID ADDRESS FOR PERMIT #: �, 4 ; �/� ,�r, Plann g Division Staff Signature Date Created 6/27/11 Page 1 of 1