Loading...
2009, 06-10 Permit App: 09001610 Pole Bldg Project Number: 09001610 Inv: 1 Application Date: 6/10/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 X 40 POLE BLDG Contact: SPOKANE STRUCTURES Address: 510 N MULLAN ST C-S-Z: SPOKANE,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)927-0655 Group Name: Site Information Project Name: •�, Plat Key: 000376 Name: CHESTER HILLS HEIGHTS District: Sout Parcel Number: 45294.0903 Block: Lot: SiteAddress: 3026 S RAYMOND RD Owner:Name: WHITE,SKIP T&MICHELE M Address: 3026 S RAYMOND CIR Location::CSV SPOKANE,WA 99206-3374 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 14,500 Sq Ft Width: 100 Depth: 145 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 2 Review Information: :m+ ;.. -: ar,maggra:,: .. ,., gym.- gt,4 -. ww::;14. RIL.w: = 4:= Review Building Plan Review Released By: Originally Released: 6/4/2009 By: tmelbourn Driveway/Approach Released By: NONE REQUIRED Originally Released: 6/10/2009 By: jdavis Landuse/Zoning/HE Conditions Released By: Originally Released: 6/9/2009 By: tschmidt Operator: JD Printed By: JD Print Date: 6/10/2009 Project Number: 09001610 Inv: 1 Application Date: 6/10/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: SPOKANE STRUCTURES INC Firm: SPOKANE STRUCTURES INC Address: 510 N MULLAN RD Phone: (509)927-0655 SPOKANE,WA 99206 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 960 SQFT 0 $21,000.00 0 $21,000.00 POLE BLDG Totals: 0 $21,000.00 0 $21,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $335.25 ACCESSORY PLANS REVIEW 1 SELECT $83.81 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $423.56 Notes: Ate. • :.,"MSE,,S,VAZ W,2ZV fi e 'i'a a "' :: As per SVMC 19.40.020(B)-All residential driveways shall be paved...with an approved hard surface material. Conditions of approval exist for lots served by Ponderosa Ln. A habitat management plan is on file. See file for Ponderosa Ln.-jforry Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $423.56 $423.56 $83.81 $339.75 $423.56 $423.56 $83.81 $339.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 6/10/2009 �/ Permit Center crry o, ....1.....:),'•--"' 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: ‘b i t) Spokane Spokane Valley, WA 99206 PERMIT FEE: .Valley (509)688-0036 FAX: (509)688-0037 www.spokanevallev.or, Community Development — Residential Construction V. New Construction Accessory Bldg Permit Application n Addition/Remodel n Deck Other: SIIhADDRESS: 5o,(' EA `{MOti> Cf/2GLL ASSESSORS PARCEL NO: t#5. --9 T , C5Q0 3 LEGAL DESCRIPTION: Building Owner: Contractor: . Name:C';1C i j 4l 7--� Name: �J £POKANE STRUCT6R4•ES, I-NC. Address: Address: pYil�l c ts) GE (Z G A 51 0 N. MULLAN ROAD City Pk v, j�Q Stater Zipq� City: CIState: Zip: v (` SPKANF. VAT.T.F.Y W� 9 Q 7 fl Phone: o�e�O`IS'voR' Fax: Phone509–q77-0655 Fax:5_09-977-40ti7 Contractor Lic No: Exp Date: Contact Person City Business Lic No 2 6 0 6 1 /1 /08 Name: 2(93 LtW15 / g/y Decv Phone: ?,27.....0 6 SS `f63 Describe the scope of work in detail: Cost of Project: $ 02ii vdo ' y td X /`f PO&t P-4)4-04 L v,Lb/A/c-- Proposed b A/c-Proposed Use: V-A-e_.f-G- **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PErAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: l 6 0l,i` x eta' /4 MAIN FLOOR TO So. 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: q 4,a AREA: FINISHED BASEMENT , RA SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 0 - PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEW R OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can e processed. r,/ SIGNATURE: t/ ?) 4' DATE: 6/Tt 6 c Method of Payment: RF : 5 +;Y ❑ Cash ❑ Check ❑ Mastercard ❑ VISA CITY OF EY Bankcard #: Expires: VIN#: ? Authorized Signature: u REVISED 2115,07PLI-) ,I; BY: S `oi 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ cityhall@spokanevalley.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. D Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location O 18" X 24" crawl space access: O One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details O Furnace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information orka4Project Newprol'ect/ Previous pre-app meeting poiane TPlan revisions 0 City of Spokane Valley Transmittal Date: 401100100 ValleY Community Development Thursday,June 04,2009 Department 11703 E. Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 3026 S RAYMOND RD Project Number: 09001610 Parcel Number: 45294.0903 Zoning: R-2 Water District: SPO CO WATER DIST#3B Fire District: FD 01 Applicant: SPOKANE STRUCTURES Owner: WHITE, SKIP T & MICHELE M 510 N MULLAN ST 3026 S RAYMOND CIR SPOKANE, WA 99206 SPOKANE, WA 99206-3374 (509) 927-0655 e-mail: e-mail: Contact: SPOKANE STRUCTURES Occupant: 510 N MULLAN ST e-mail: SPOKANE, WA 99206 (509) 927-0655 - e-mail: i Contractor: SPOKANE STRUCTURES INC Arch/Engineer: 1�i 510 N MULLAN RD SPOKANE, WA 99206 (509) 927-0655 j i e-mail: Project 24 X 40 POLE BLDG Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLAN PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Only CITY OF PLUS Project Number �) i C` i(r (-) pokaneProject Address l allev° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 aJ 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. rt. Your application review TARGET DATE is �' _ �� `� � ` The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 ILA POKANE TRUCTURESAL 1NG DEPT/)APPROVED S'kiPwh BY: z4sQ4o,.. �d DATE: v�� Pa, a_l 4.15-394. 0 905 /00 5 A .0 .-tof Q � L .3y' rr J I 4. 4 ,ashe_ $ r I N 510 N. MULLAN RD. • SPOKANE, WA 99206 • (509) 927-0655 TOLL FREE - 1-800-735-6347 FAX (509) 927-4062 ,AI%.(I.I cnnlennnetn inti irce rnm