Loading...
2011, 03-16 Permit App: 11000594 Remodel, Mechanical FixturesProject Number: 11000594 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/16/2011 Page 1 of 2 Project Information: Permit Use: CONVERT AND EXISTING FINISHED ROOM INTO BATHROOM Setbacks: Front Left: Right: Rear: Site Information: Plat Key: Name: Range Parcel Number: 45141.0503 Contact: HAYWARD, R A Address: 921 N RAVALLI DR C - S - Z: SPOKANE VALLEY, WA 99037-9569 Phone: (509) 924-8888 Group Name: Project Name: District: East SiteAddress: 921 N RAVALLI DR Location:: CSV Block: Lot: Owner: Name: HAYWARD, R A Address: 921 N RAVALLI DR SPOKANE VALLEY, WA 99037-956 Zoning: MF -1 MF MDR District Water District: 010 VERA Hold: [ j Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Permits: Contractor: OWNER Released By: Originally Released: 3/15/2011 By: tmelbourn Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sa Ft Valuation Sq Ft Valuation BASEMENT R R-3 VB PLAN 0 $750.00 0 $750.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $750.00 0 $750.00 Units Unit Desc Fee Amount 1 SELECT $69.25 1 SELECT $4.50 1 SELECT $27.70 Permit Total Fees: $101.45 Operator: jmm Printed By: JD Print Date: 3/16/2011 Project Number: 11000594 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/16/2011 Page 2 of 2 Contractor: OWNER Item Description VENTILATING FANS 1 DUCT Notes: Payment Summary: Permit Type Building Permit Mechanical Permit Mechanical Permit Finn: OWNER Phone: (000) 000-0000 Units Unit Desc 1 NUMBER OF Fee Amount $101.45 $11.00 $112.45 Permit Total Fees: Invoice Amount $101.45 $11.00 $112.45 Fee Amount $11.00 Amount Paid $27.70 $0.00 $27.70 $11.00 Amount Owing $73.75 $11.00 $84.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 3/16/2011 e mmunityitCenter Development Department -- P 1103 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel:! (509) 720-2540 Fax (509) 688-0037 per itcentera@sookanevallev.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: -RESIDEIVTIA_ C41STRUCTION PERMIT APPLICATION N�ONSTRUCTION ADDITION/REMODEL 0 ACCESSORY BUILDING 0 DECK OTHER SITE ADDRESS:921 N RAVALLI DRIVE ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME:RICHARD A HAYWARD NAME:RICHARD A HAYWARD ADDREss:921 N RAVALLI DRIVE CITY:SPOKANE VALLEY STATE:WA ZIP:99037 PHONE:924-8888 FAX: CELL:999-7324 CONTACT NAME: -- SAME -- PHONE: FAX: CELL: CONTRACTOR NAME: -- NA -- MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: CONVERT AN EXISTING FINISHED ROOM INTO A BATHROOM WITH SINK, TOILET, AND TUB. AN ELECTRIC HEATER, CEILING FAN, VANITY LIGHT, AND GFI OUTLET WILL ALSO BE ADDED. ****YOU MUST COMPLETE THE FOLLOWING**** IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ 7 �O DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval fo any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be re .j. ed to be sugnitted and sutsequently approved before this application can be processed. Date: '1 I / SI Signature Updated 1-11-11 C:\Documents and Settings\RickH\Desktop\Permits\Building Permit - Residential 11-11-11.doc Page 1 of 1 SOFkane diooll;Valley Site Address: 921 N RAVALLI DR Parcel Number: 45141.0503 Zoning: MF -1 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, \VA 99206 Phone: 509.688.0036 New project 0 Previous pre -app meeting ❑ Plan revisions 0 Transmittal Date: Tuesday, March 15, 2011 Water District: VERA Project Number: 11000594 Applicant: HAYWARD. R A Owner: HAYWARD, R A 921 N RAVALLI DR 921 N RAVALLI DR SPOKANE VALLEY. WA 99037-956 SPOKANE VALLEY, WA 99037-956 (509) 924-8888 e-mail: e-mail: Contact: HAYWARD, R A Occupant: 921 N RAVALLI DR e-mail: SPOKANE VALLEY, WA 99037-956 (509) 924-8888 e-mail: Contractor: OWNER ( ) - 0 Arch / Engineer: e-mail: Project Description: CONVERT AND EXISTING FINISHED ROOM INTO BATHROOM Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN TD S Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane j�alley For City Use Only PLUS Project Number1- (. i'�' J i (1 Project Address �.. k ,t 't _L., 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 SO1Ile`.. 11703 E Sprague Ave, Suite B-3 P Spokane Valley, WA 99206 valley' (509)688-0036 FAX: (509)688-0037 Community Development permitcenter[7a,spokanevalley.org Mechanical Permit Application PERMIT NUMBER: PERMIT FEE: n Commercial M Residential SITE ADDRESS: Building Owner 1-2, ck\f 10 }{(i���, AUI(� Name: �"� ` , 1 `^' 71� Address: N V I 1 L 1 om Fax: Phone: City:�poLT\ VAI I f V State: ujA Contractor T 'f\ M Name: Zip: 0 3) Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: N Name: Phone: ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #:9 EXPIRES: VIN: SIGNATURE ja I http://www. spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp — 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp —1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct I VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #:9 EXPIRES: VIN: SIGNATURE ja I http://www. spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc