Loading...
2014, 01-15 Permit: SW-14000012 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14000012 Permit Issued Date: 01/15/2014 Expiration Date: 01/15/2015 Project Description: SEWER CONNECTION Project Name: SOUTH KOKOMO Primary Contact: FAUCETS N'STUFF LLC Applicant: FAUCETS N'STUFF LLC Phone: 509-924-8881 Address: PO BOX 813 VERADALE,WA 99037 Phone: 509-924-8881 Email: SITE INFORMATION: Site Address: 3224 S RAYMOND CIR Owner: SCOTT LIVING TRUST Parcel Number: 45321.0703 Address: 13405 E 25TH AVE SPOKANE VALLEY,WA 99216 Phone: 509-999-5279 Assessor's Description: CHESTER HILLS HTS L3 B7 Email: Inspection Area: : (509)-477-3675 Water District: Spokane County Water Fire District:Spokane Valley Fire District#3 Zoning: Land Area: 14500 Square Feet CONTRACTOR INFORMATION: FAUCENS023LQ, Exp.03/10/2015 FAUCETS N'STUFF LLC PO BOX 813 VERADALE,WA 99037 509-924-8881 DETAILS: Class Type Quantity Unit Charge Value SEWER ALTERATION TO EXISTING 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.64 Utilities Permit $125.00 Total Fee: $151.64 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Possible FEMA Flood Zone Possible Wetland On Site CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:01/15/2014 10:21:33 Project Coordinator:Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14000012 Permit Issued Date: 01/15/2014 Expiration Date: 01/15/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:01/15/2014 10:21:33 Project Coordinator:Julie Shatto