2006, 01-26 Permit: 06000405 Sewer �i
SPOKANE COUNTY
- DEPARTMENT OF BUILDING & PLANNING
A ARE
SPOICCOMiY 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information Project Information
Site Address: 1815 N OBERLIN LN Project Number: 06000405 Inv: I Issue Date: 1/26/2006
Permit Use: NEW SEWER CONNECT,UNIVERSITY VIEW EST
Parcel Number: 45084.0401
Subdivision: RANGE Applicant: CLIFF SCHMITZ CONSTRUCTION
Block: Lot: 16520 E SECRETARIAT
Zoning: LDR Low Density Residential VERADALE,WA 99037 Phone: (509)999-7733
Contact: CLIFF SCHMITZ CONSTRUCTION
Owner: CLIFF SCHMITZ CONSTRUCTION
16520 E SECRETARIAT
Address: 16520 E SECRETARIAT VERADALE,WA 99037 Phone: (509)999-7733
VERADALE,WA 99037
Setbacks-Front: Left: Right: Rear:
Building Inspector: JOHN LARSON
Water Dist:
Group Name:
Project Name:
Permits
Sewer Connection Permit Contractor: J L HAWKINS EXCAVATING License#: JLHAWE*222LE
SEWER CONNECTION 1 $85.00 PROCESSING FEE 1 $15.00
Total Permit Fee: $100.00
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
THE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND
MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE
AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
Payment Summary
Total Fees AmountPaid AmountOwing Tran Date Receipt# Payment Amt
$100.00 $100.00 $0.00 1/26/2006 347 $100.00
Processed By: Hansen,Tom PERMIT
Printed By: WENDEL,GLORIA Page 1 of 1
NOTICE
It is the responsibility of the applicant/permittee to see that the use described on the front of this permit complies with applicable codes and requirements and that required
inspections are requested.Failure to request inspections as listed below and olbtaisi the necessary approvals before progressing beyond the point where inspections are
required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense.At a minimum,the following inspections
ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE:This inspection includes review of the structure's setbacks from property lines.Minimum setbacks are established by County zoning regulations.Typically,
side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from the property line or the center line of the
roadway right-of-way,whichever provides the greater setback from the center line of the roadway right-of-way.Curb lines and fence lines are not necessarily indica-
tive of property lines.In some residential areas,the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb.
The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any
responsibility for the verification or location of your property lines.Please verify their location prior to locating your structure.Failure to properly locate the structure
may require its relocation at the owner's/permittee's expense.
2.FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete.
3.FRAMING-after all framing,bracing and blocking is in place,and prior to concealing.
4.INSULATION-prior to the installation of drywall.
5.PLUMBING-after rough-in,before covering,and final.
6.MECHANICAL-rough-in of piping,before covering,metal chimneys before concealment,and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site plan)required by
ordinance or as a condition of approval of this permit.Items such as the installation of fire hydrants,fire department access,on-site drainage("208 swales"),road
improvements,parking,and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance
of a Certificate of Occupancy.
8.MANUFACTURED HOMES-Final inspection required when complete,stairs,handrails,skirting,etc.installed,and prior to occupancy;completed inspection record
card must be available on site. Manufactured home installations must comply with the manufactures installation instructions.
9.SEWERS-prior to cover
10.RIGHT-OF-WAY/APPROACH-prior to placement of concrete,or,if gravel approach,after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.,must be inspected prior to cover.
Check with the department for"special inspections"in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE,PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE.
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building,plumbing,mechanical and fire inspections,Department • Road cuts for utilities or driveways,Division of Engineering&
of Building and Code Enforcement Roads-48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain,Division of Engineering&Roads 456-3000
477-3600
• Sewer connection,Division of Utilities
• Electrical wiring,State Department of Labor and Industries
477-3604
324-2640 or City Public Works Department
625-6300
• On-site waste disposal system,Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted,this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180
days,unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.At a minimum an inspection should be
requested at least once every 180 days to assure the validity of the permit.A permit may be renewed within one year of the date of expiration for one-half the original fee,
subject to certain limitations—please call us if you have any questions.
Any refund requests must be made in writing by the applicant/permittee(shown on the reverse)no later than 180 days after the date of fee payment.Refunds of not more
than 80%of the permit fee paid may be authorized when no work has been done under the permit.No refunds may be authorized more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it,or find erroneous information in the permit,please bring it to our
attention immediately by filing a written request for correction within 10 working days of discovery.All such requests should be directed to the Division of Building and
Code Enforcement at the below address.
Spokane County Department of Building and Planning
1026 West Broadway Avenue, Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509)477-4703 TDD: (509)477-7133
FORM J0.0606 BLDG PERMIT
www.spokanecounty.org/bp bp@spokanecounty.org