1979, 03-19 Permit App: N2463 ResidenceCounty of Spokane, Washington
BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201
APPLICATION FOR LAND USE OR STRUCTURE PERMIT
GENERAL REQUIREMENTS PERMIT FEE ----- __________________
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any
kind or alter any building or structure already erected, or to change a land use. Construction must conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
WATER. water supply must be approved by the County and State Health Departments. Where work on water connections disturbs
the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235.
SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at
least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be
performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State
Highway, clearance must be obtained from the County Engineer and/or State Highway Department.
ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land
which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications.
APPLICANT FILL IN BELOW THIS LINE
Name of Owner A1 ` Aaaress .. I -A • %J • v - � WE ft=nq "" rnone — - - -
Architect Address Phone
Engineer Address Phone
Contractors Address Z
Legal Description of Property (Give complete description from deed, tax receipt, etc.) Parcel Number
DESCRIPTION OF WORK: New V"'� Addition
Size of Lot So Y \a O
StoriesS__F_— Dimensions - a'4
Rooms -I— BathsI Basement
Fu 1, part, none
Heat. System e% F.Ae .. Type of Roofing
./��
Use of Bldg. S". LA V4L
Remodel Moving Bldg. Z ne Fire Zone_
(, ��� (� Sewage System s CF�nSt.
onV B ., etc.)
57� .EAC. Total Sq. Ft. (� Valuation a -
Foundation Const.. C -O No C- Chimny Fireplace O
l (Kind) (Number
4Yy Ext. Finish (1j" W'? I Int. Wall Finish
No. of Units % Bedrooms
PLOT PLAN
Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and
proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines.
as
NORTH
, N-rr.4 C,*�-cb
t
State icense No.
4;: a 'f,
Ind. Ins. Acct. No.
RESIDENTIAL - COMMERCIAL
REQUIRED
Plumbing Permit
M Heating Permit
NSewage Permit
Plans Received
Plans Checked
10 -
Plans Returned
Plans Picked Up
Plans Mailed
SOUTH
I ce ormation sulAitted is correct and there are no other structures
own
1�
on this property except
Owner or Agent Date
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOT A PERMIT. ////
, DO NOT WRITE BELOW THIS LINE
Your street address will be (� . a liI` VZ The zone is
Sewage Permit Number Issued Building Permit q - k_3 Receipt ; Z
Remarks
Form 523 Bldg. Code
West Valley Excavating
Mike Bascetta — Joe Bascetta
S. 812 DISHMAN RD. m SPOKANE, WASHINGTON 99206 m PHONE 924-5130
■ WATER LINES
■ DRYWELLS
■ BASEMENT DIGGING
■ PATROL GRADING
1%
Z'4'
..A -=
• SEPTIC TANKS
■ LAND CLEARING
■ FILL & BLACK DIRT
V'C� `k uv'
Is ° Avt"A *