Loading...
2013, 08-19 Permit App: APR-2013-0047 Approach Community Development Department (Staff Use Only) • ' • '` Permit Center rc Sjkaiie 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:Spokane Valley,WA 99206 Tel: (509) 688-0036 PERMITFEE: iFax: (509) 688-0037 oermitcenter@spokanevalley.orq APPROACH PERMIT 'oERMIT APPLICATION PROJECT ADDRE5~r'J 3 6/// 6/7y6 7 J4/4 ,' !0 4 - 4 . rS vI START DATE: 0-020-/3ANTICIPATED COMPLETIO-_ DATE: g 222..-/_ BUILDING OWNER iW E: / t 7`,e1./ j�-gV/ MAILING ADDRESS: '/7802 CI 6,. 440,17//194..).-,/ /2,3 • CITY:(///IC'y 4D STATE: 11b ZIP: ✓ff� 4 CONTACT PERSON NAME: f`FfLL ��v //// c3oI ?5 3[[5 6-V2e,Lq(` ., Z C6-3---,73 E LI V Y37 g15- ...___ _.CONTRACTOR NAME: Wil_,024/4j S- Cd�j�CeET�' _--- MAILING ADDRESS: /7t 9 6 f, {'� /�/' l���v ,y CITY: ///517: )/ 7464!/ �STATE: v✓4 C • [ZIP: f9Lr 3, PHON(6J 75 5)- ...?(7I-S. FAX: �/�, 29?`7 W2_, CEL( b ) 9S 3 /�� 5 �` CONTRACTOR LICENSE No.:WILLJCSZS5/1( EXPIRES: ST:Z CITY BUSINESS LICENSE NO.i7(,C°/j, .,/JC. PROJECT DESCRIPTION (Please Provide Site Sketch) - ' Residential Driveway ,ePr7evef ReP u1c 0 Commercial/Industrial Driveway Existing Curb &Gutter /7PP12014c H D Rural Road Section ❑ Culvert Installation ❑ Sidewalk Repair/Construction ID Other Conditions: - Bond/Insurance certification must be On file with the City. DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)If this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property -owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances. 6) Plans or additional • Information may be required to be submitted and subsequently approved before this application can be processed. Signature 1, JO t 2O' - 11 , tb.FF yy_ i Updated 1-11-11Page 1 of 1 http://www.spoka neva liey-org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc 4 • si (1��► Ile Development Engineering Valley 11707 E Sprague Ave Suite 106• Spokane Valley WA 99206 509.921.1000♦ Fax: 509.921.1008 • cityhall®spokanevalley.org .ems Approach Permit Application Review TO: Building Department Site Address: 13619 East Redlin Project No: APR-2013-0047 Accepted Not Accepted Approach X Building Location Paved Access Notes: Approach to be constructed pursuant to City of Spokane Valley Street Standards, Standard Plan R-112. Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: iko,,,./oot _ Date: fig/43 rr� APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: C Sidewalk 0 Drainage Ditch _ ft wide 0 Drywell (show location on sketch) _ ft from back of curb 0 Other (please describe below) 0 Streetside Swale w l DISTANCE FROM _; - NEAREST PROPERTY LINE 1 ILMAYBE LEFT OR RIGHT SIDE) FT(SEE TABLE) WI al CONCRETE APPROACH CURB RETURN CURB WING' THROB EE TABLE)T WIDTH lat FT NG \1F CORNER LOT, 13 /9 E. �'6G,�� DISTANCE FROM STREET NAME CURB RETURN n FT(ggaTABL� \. STREET WITH CURB 1 "" 7 ., w i DISTANCE FROM ' z I - NEAREST PROPERTY UNE i ' -� 0 E1 AY BE LEFT OR RIGHT SIDE) FT(SEE TABLE) V., w� rt•ti` of i 15�RA1t19'" RADIU S a�, I APPROACH I 1 , N r',..--- ix IRETURN 1 [—THROATIDTH F1FT--.J [ EDGE OF , , ) ASPHALT IF CORNER LOT, DISTANCE FROM STREET NAME RADIUS RETURN FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured See Page 7-27 from centerline to centerline of each None specified In City Street Standards approach) Throat Width (flat portion) 16'min., 30'max. 30'min.,40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' | 1 |