1998, 11-17 Permit: 98011680 Sewer SPOKANE COUNTY DIVISION OF 13UILDING AND PLANNING
1026 W.BROADWAY • SPOKANE,WA 99260-0050
(509) 456-3675
SITE INFORMATION PROJECT INFORMATION
Site Address: 13626 E REDLIN AVE Project Number: 98011680 Inv: 1 Issue Date:
SPOKANE,WA 99206 Permit Use: SEWER CONNECTION
Parcel Number: 45274.0905 Applicant: DEANDRE,DOUGLAS C
Subdivision: CONVERTED CNTY DATA Phone: (509)924-5410
Zoning: SFR Address: 13626 E REDLIN AVE
Owner: DEANDRE,DO SPOKANE,WA 99206
Address: 13626 E REDLI Contact: DEANDRE,DOUGLAS C Phone: (509)924-5410
SPOKANE,WA 13626 E REDLIN A
Inspector: BOBBY STONE SPOKANE,WA 992
Water Dist: Setbacks-Front: Left: Right: Rear:
PERMIT(S)
Sewer Permit Contractor: OWNER License#: OWNER
SEWER CONNECTION 1 $85.00 PROCESSING FEE $15.00
Total Permit Fee: $100.00
. >
PAYMENT SUMMARY Page loll NOTES
PERMIT By: JOHN LARSON
Tran Date Receipt# Payment Amt
11/17/98 13118 $100.00
Total Fees AmountPaid AmountOwing
$100.00 $100.00 $0.00 FILE
NOTICE
It is the responsibility of the permittee, not Spokane County,to see4o it ticaNhe use described on the front of this permit complies with applicable codes
and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's
expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway
right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much
as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback
provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification
or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require
its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is
required to be inspected prior to the installation of skirting.)
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough-in, before covering, and final.
6. MECHANICAL - rough-in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,
on-site drainage("208 swales"), road improvements, parking,and landscaping are common requirements of a permit/site plan which must
be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
CALL 456-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities or drives, Division of Engeering & Roads • Sewer connection, County Division of Utilities
456-3600 456-3604
or State Department of Transportation or City Public Works Department
456-3000 625-6300
• On-site waste disposal system, Spokane Regional Health District • Electrical wiring, State Department of Labor and Industries
324-1560
Construction in a flood plain, Division of Engineering & Roads 324-2640
• 456-3600
EXPIRATION
Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.
At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within
one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
MISTAKES?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Planning at the address found on the face of this permit.
I certify that I am the owner or am authorized by the owner to make this application and that I have examined this permit/application, state that the
information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County
to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and
agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.
I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed
to give authority to vile or-cancel the provisions of any state or local law regulating construction or agreement concerning this property, or as a
warranty of conformance wi '"fhe provisions of any state or local laws regulating construction.
SIGNATURE OF APPLICATION
OWNER OR AGENT , L /�� � DATE /j--
J
1
► q � �i C O U N T
S P O K A N E Ak,
UTILITIES DIVISION • A DIVISION OF THE PUBLIC WORKS DEPARTMENT
N.Bruce Rawls,P.E.,Utilities Director Dennis M.Scott,P.E.,Director
December 29, 1997
HD-Second Notice for U924 - Mountain View
DE ANDRE, D C
13626 E REDLIN DR
SPOKANE,WA 99216-2427
I
111111111.11111111111111111,1,1111.11111111111111111111I
Sewer Connection for Property at: 13626 F REDLIN AVE Parcel #: 45274.0905
Dear Property Owner:
Our records indicate that a notification letter was sent from the Spokane Regional Health District
instructing the owner of this property to complete a full connection to the Spokane County public sewer
by May 15, 1996. A check of our records shows that your property has not yet been connected to the
public sewer. The Assessor's Office records indicate that you are the owner of the property listed above.
To bring your property into compliance with current Spokane County Code, Section 8.03, titled
Spokane County Sewer Ordinance,you will have until January 15, 1999,to complete the sewer
connection. Failure to comply with this directive will cause our office to issue a Notice of Violation
pursuant to Sections 8.03.9160 and 8.03.4820,of the Spokane County Public Sewer Ordinance. Any
person who violates or fails to comply with any of the provisions of the Ordinance is subject to a civil
penalty of$1,000.00.
Upon the connection to the County's general sewerage system or one year after the public
sewer service became available,whichever is earlier,the owner, agent or occupant shall commence
payment of monthly sewer service fees and, if applicable,any additional charges owing per County
Ordinance. These charges shall begin on the same date as the above hookup deadline whether or not
sewer hook-up has been completed.
The following county departments may be contacted regarding any questions you may have
regarding completing your sewer connection:
Details on how to complete a sewer hookup,stub Spokane County Division of Utilities 456-3604
as-built information, inspection requirements and
abandoning of existing systems.
Sewer Connection Permit Spokane County Division of Building&Planning 456-3675 ,
Ar
Regulations concerning.abandonment of on-site Spokane Regional Health District 324-1568
Systems
If you have already connected to the sewer, or have any other concerns regarding connection to
the sewer please call Robbin Paeper, Division of Utilities, at 509-456-3604.
Sincerely. ( ice / 6 - 0 6
r Peatvt -C
Robbin Paeper:
Staff Assistant
1026\V.Broadway • Spokane.SVA 99260-01S0 • (509)456-3604 FAX (509)456-4715 TDD:(509)324-3166