Loading...
2013, 02-13 Permit: SW-13000076 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000076 02/13/2013 Expiration Date: 02/14/2013 Project Description: SEWER CONNECTION Primary Contact: LARRY MILLER EXCAVATING Project Name: VERADALE HEIGHT PH 3 Applicant: LARRY MILLER EXCAVATING Permit Type: SEWER Address: 7117 E RUTTER AVE SPOKANE,WA 99212 Phone: 509-218-3335 Email: SITE INFORMATION: Site Address: 1203 N REES RD Owner: GRIFFITH,JACOB W&JESSICA C Parcel Number: 45142.2806 Address: 1203 N REESE RD SPOKANE VALLEY,WA 99216 Subdivision: TWELFTH ADDITION TO Phone: VERADALE HEIGHTS Assessor's Description: 12TH ADD VERADALE HTS L6 B2 Email: Inspection Area: Water District: Fire District: Spokane Valley Fire Consolidated Irrigation District#19 Zoning: Land Area: 12713 Square Feet CONTRACTOR INFORMATION: General Contractor LARRYME918DR LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE,WA 99212 509-218-3335 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:02/13/2013 14:17:44 Printed by:IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000076 02/13/2013 Expiration Date: 02/14/2013 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:02/13/2013 14:17:44 Printed by:IIS APPPOOL\SmartGovProdApp