2013, 10-17 Permit App: BLD-2013-2166 Residence• Community Development Department (Staff Use Only)
Permit Center
11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
*Wane
Spokane Valley, WA 99206
Tel: (509) 720 2540
PERKIT EE:
�/T� Fax: (509) 688-0037 ' Z w 1 .1 1 ti i
.0000-alle` . permitcenter@sgokanevallev.orq �rU�E CI t? p
.J I! R CEIVLLJ
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
(Z NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK ❑- ,OTHER ..l i L_Fi
SITE ADDRESS: 4 OG), j . pE L N '
ASSESSORS PARCEL NO.: /4522 ,2 . I' o L LEGAL DESCRIPTION: 1,:= 2. le WC -K.
BUILDING OWNER NAME:
NAME: c:5I V -P fl C C,1)3 A.1 / I
ADDRESS: Iii 11 n1• CAI
CITY:1'ox-<A-
PHONE:
S.
STATE:
-t �,1,A�
FAx: 32F - 79 f C 1
ZIP: 9 c
CELL:
CONTACT NAME:
PHONE: c o,V GIS 1- 19 0' FAX: 3?- _�-i / ( CELL: 15( —/ / o 3
CONTRACTOR NAME:
ti•
MAILING ADDRESS:
CITY:
STATE:
ZIP:
PHONE:
FAX:
CELL:
CONTRACTOR LICENSE NO.: `3Tie-F1*c r9(c,9 ( EXPIRES:
5/( L\
CITY BUSINESS LICENSE No.: 1'L41a j q(,c Lb
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Cce4S-rCTO/J evJ nib i t= 'FMt1 I L y /4E -
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: 1
2?)
Dimensions:
ki il X C',Q)
No. of Stories:
I
Total Habitable
Space: l'-{ g to
Main Floor SQ FT:
11-tei le
Upper Floor SQ FT:Unfinished
N I
Basement SQ
FT: NIA-
Finished Basement SQ
FT: §A
Garage SQ FT:
69 0v,
Deck/Covered Patio SQ
FT: L 044
Impervious Surface
Area: IA
30% Slopes on
Property: Ali A
No. of Bedrooms: 3
Construction Type: w afl-NH
Leat Source: GP6Roe.-c- fr14
wejr Septic:
TOTAL COST OF PROJECT: $�I�POO
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Ciak
Date: -- 21 , 2-0 i��
I I nrl atorl 1 -1 1 -1 1
Dano 1 of 1
•
j�a1 eyl
Target Date sheet
For City Use Only
PLUS Project BL +_S - 2..1 CO(C
Project Address
REE S E ci.%
11703 E Sprague Ave Suite 8-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
•SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001867
Permit Issued Date: 10/21/2013
Expiration Date: 10/21/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
MANOS VALLEY ESTATES
STRAHL CONSTRUCTION INC
509-328-7919
Applicant: STRAHL CONSTRUCTION INC
Address:
Phone:
Email:
3611 N CALISPEL ST
SPOKANE, WA 99205
509-328-7919
SITE INFORMATION:
Site Address:
Parcel Number:
408 S REESE LN
45232.1702
Assessor's Description: MANOS VALLEY ESTATES PUD LT 2 BLK 1
(AFN# 5613158)
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
STRAHL CONSTRUCTION INC
3611 N CALISPEL ST
SPOKANE, WA 99205
509-328-7919
Water District: Vera Irrigation District #15 Fire District: Spokane Valley Fire
Land Area: 4610 Square Feet
CONTRACTOR INFORMATION:
LONGRA*246R0, Exp. 03/31/2014
BOB LONG
PO BOX 305 VALLEYFORD, WA 99036
509-951-1903
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 10/21/2013 10:23:45 Project Coordinator: Julie Shatto
OPOKANE COUNTY UTILITIES
PERMIT
•
Application Number: SW -13001867 Permit Issued Date: 10/21/2013
Expiration Date: 10/21/2014
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/21/2013 10:23:45 Project Coordinator: Julie Shatto