Loading...
2012, 07-05 Permit: SW-12001684 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001684 07/05/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: CYCLOPS PIPE SERVICES, LLC. Project Name: ROCKWELL Applicant: CYCLOPS PIPE SERVICES, LLC. Permit Type: SEWER Address: P.O.BOX 700 NINE MILE FALLS,WA 99026 Phone: 509-413-9529 Email: SITE INFORMATION: Site Address: 4817 N REES RD Owner: HELFENSTEIN,JOEY F Parcel Number: 46353.1608 Address: 4817 N REES RD SPOKANE,WA 99216 Subdivision: HENDRICKSON Phone: SUBDIVISION Assessor's Description: HENDRICKSON SUB L8 B1 Email: Inspection Area: Water District:Trentwood Fire District: Spokane Valley Fire Irrigation District#3 Zoning: Land Area: 11431 Square Feet CONTRACTOR INFORMATION: General Contractor CYCLOPS924K9 CYCLOPS PIPE SERVICES, LLC. P.O.BOX 700 NINE MILE FALLS,WA 99026 509-413-9529 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:07/05/2012 15:32:13 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNT ' BU DING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001684 07/05/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:07/05/2012 15:32:13 Printed by:IIS APPPOOL\ASP.NET v4.0