1995, 05-24 Permit: 94000700 InspectINSULATION & CAULK
WINDOWS & DOORS PER PLANS„ S WINDOWS & DOORS CAULKED &VAPOR RETARDERS:
ADVANCED FRAMING:
WALLS
CEIUNGS
WALL INSULATION: R-
o VAULTED CEIUNG: R- 36
BATT INSTALLATION
TECHNIQUES
,WSOLEPLATE CAULKED
,.( PLUMBING//ELECTRICAL
PENETRATIONS CAULKED
SEALED DUCTWORK
EXHAUST FANS/DUCTS
INSTALLED
igrRECESSED UGHTS
CEIUNG
¢C.ATTIC VENT BAFFLES
COMBUSTION AIR DUCTS
INSTALLED
,4 4CRAWLSPACE VENTILATION
c9ADON FAN CIRCUIT
• PERIMETER INSULATION R
GRAVEL BASE
o PLASTIC MEMBRANE
SPOKANE COUNTY DEPARTMENT OF BUILDINGS
a ss r-4
•7E -r'5-673
Jz2.�r3
ADDRESS. :::...:. �.. `� – o RESIDENTIAL ENERGY CODE INSPECTION CHECKLIST
o PERMIT cig. ?6.0
/7
0
0
o APPROVED FOR COVER BY DATE
0
0
0
0
0
0
0
0
0
o APPROVED FOR COVER BY
0
0
0
•
DATE
MECHANICAL SYSTEMS
BATH EXHAUST
KITCHEN EXHAUST
( AUTOMATIC WHOLE HOUSE
EXHAUST
MAKE-UP AIR INTAKES
DUCTWORK
EQUIPMENT INSTRUCTIONS
CHEATING FUEL & SYSTEM TYPE:
c RADON MONITOR
SERIAL NUMBERL.
o FINALP,°-VAL BY
WEATHERSTRIPPING
DOORS & WINDOWS
,ATTIC & CRAWL ACCESSES
SWITCH & OUTLET COVER
PLATES
0
•- INSULATION
,FLOOR R- 30
9LATTIC R- 3S
BELOW -GRADE WALLS R -
O BATT INSTALLATION
TECHNIQUES
DATE_
PLUMBING
,g WATER HEATER PAD
P SHOWER FLOW
FIREPLACE/WOODSTOVE
FIREPLACE DOORS
FLUE DAMPER
COMBUSTION AIR
PCRA LSPACE GROUND COVER
C
b LSPACE VENTILATION
g(RADON VENT & LABEL
0
0 INSPp-11<2.0WP
20'd 14101
From:
Spokane Cou ty Division of Buildings
1026 W. Broadway Ave.
'Spokane, WA :99260
To:
HARLEY C DOUGLASS INC
815 E ROSE WOOD
SPOKANE, WA 99208
RECEIVED - d
1994
HARVEY COGG�SS
Re:
Permit numtier 94-000700: RESIDENCE W/ATTACHED GARAGE - NATURAL GAS
Our records show that the above permit, located at 15903 E RENZ DR, VERADALE WA does
not showan inspection or other activity in the last 150 days.
Permits expire by limitation if the work authorized is suspended or abandoned for a period of
180 days. If Ole work authorized has not been supended or abandoned, please telephone this
office at (509)! 456-3675 before July 4, 1984 to schedule an inspection. Failure to do so may
result in payment of additional fees to reinstate the permit.
If the work authorized is completed, we do need to conduct a final inspection to close the
project.
We look forward to hearing from you soon.
ai
(h
W
cc 144
0
0
}
F-
it
20'd 86T2VE26 O1 Wad Wd82:Z0 t66T-T0-90